Post-mortem: why Swarm's state was redone, and what #1755 redid

Date: 2026-10-27. Author: Theo (Builder), from the PR, commit and review records. Root cause and rules: Ken. Rules: Feature design rules, short version in AGENTS.md.

Root cause

Swarm had to redo its state storage (#1726) because the original design (#1405, merged 2026-10-19) never asked three questions: how the data grows, who writes concurrently, and how much a client reads per poll. The spec had no design-check step.

  • Growth, concurrency and read cost were never designed.
    • Each Swarm was one MongoDB document. Its whole state was one JSON field under one revision.
    • Every command rewrote all of it, and every client poll downloaded all of it.
    • Finished work never left the document.
  • Later features kept adding to it. In the seven days after #1405, 31 PRs changed the same state model (backend/src/superTabs/model.ts): routing, team roster, private projects, attachments, decisions, the Reviewer role, owner rules, custom roles, the Leads conversation, local models, and more.
  • It failed on 2026-10-26. One Swarm reached 1.16 MB with 195 work groups and returned 500s on agent.add from write conflicts (#1726). The first fix, #1722, only added retries and 503 SWARM_BUSY. It eased the symptom, not the cause.

Other problems were found late for the same reason. No design step asked the question that would have caught them:

Found late The question nobody asked
Private chats reaching the PM's terminal and the previous release (#1751, #1748; D9, D10 below) audience: the server enforces it, on every copy
Every old client getting 426 at release, so all clients had to update together (#1755) compatibility: old and new clients
Teammates' agents running as the machine owner, with the owner's git login: 18 of 113 agent starts in one live Swarm, 21–23 Oct. Fixed by the Team account work (#1688–#1705, docs/plans/2026-10-24-swarm-team-account.md). identity: never use the machine owner's login

The twelve incidents below are the same failure inside the redo itself. #1726 did have a design and a design review, and that review caught six problems before any code. But the design lines that later broke were not on its list, and work added after approval (v1) had no design at all.

The redo: #1755

#1755 merged "Swarm state by parts" (#1726) and the v1 Swarm work (Chat with PM, lost-work takeover, routing readiness) into main on 2026-10-27. Its design was docs/design/2026-10-26-swarm-state-parts.md, built against the spec docs/plans/2026-10-26-swarm-state-parts.md and its private conversations addendum. Groups 2–6 and the v1 groups each merged a PR into feat/swarm-state-parts (#1731–#1752). Then the branch went to main.

This document lists every piece that was built and then redone or patched late because of a gap in the design. For each one it gives what was redone, the evidence, the gap, when it was found and what it cost. Coding slips that ordinary review caught are listed separately at the end. No rule cites them.

All times are UTC, taken from the PR commits and the Swarm review conversations. Costs count Builder hours from the finding to the accepted fix, plus review rounds: verdicts that sent the work back, and the re-check that passed it.

Timeline

When (UTC) Event
26 Oct 10:16–10:55 Design written (#1731). Design review 10:45–10:54: 1 Critical and 4 Important findings, all fixed before any code.
10:55–13:42 Groups 2 (storage), 3 (reads, migration), 4 (Desktop), 5 (CLI) build in parallel against the design.
14:20 Group 6's benchmark finds reads load the whole Swarm from the database. A new group, 3b, is opened.
14:46 v1 groups start on the same branch: liveness A and B, routing readiness, Chat with PM. Their design is a scratchpad doc attached in chat.
17:34–17:45 Whole-branch review: 2 Critical and 1 Important finding. Not safe to release.
18:29–22:34 Final fixes C1, C2, I3 (#1748–#1751). The main merge is redone (#1747).
27 Oct 02:23 #1755 merges into main.
03:32 The gated migration on a restored production backup fails on deleted conversations' history. Fix #1778.
03:51 Release.
~04:00 Machines go offline for about 2 minutes during the CLI update. 16 tasks are marked lost, and their agents can never be assigned again. Fix #1781.

Incidents

Each incident's Gap names the line of the Design section it broke: growth, concurrency, read cost, scale, compatibility, migration and rollback, audience, identity, failure or platforms.

D1. Hosts missed changes that removed something

  • Redone: the host form's wake-up rule. It now records the machines a group write affected, before and after (SwarmGroup.hostMachineIds), and a settings marker on machines (SwarmMachine.hostChangedAt). An agent that leaves a group is written again, so a later rename cannot hide its departure. Design R15 was added afterwards.
  • Evidence: group 3 review findings at 12:43 and 12:56. Fixes in #1733 0c154c426 and d9740911d.
  • Gap (read cost): design 4.10 woke a host for a group whose new agents included one of its agents. The invariant "a host sees every change that concerns its machine" was stated for additions only. Removals, and a later write that replaces the marker, were never considered.
  • Found: group 3 review, after implementation.
  • Cost: 0.4 h and 3 review rounds. Two new columns and a rewrite of the commit path, all in group 2's files.

D2. Machine readings woke every host, and every tick resent the roster

  • Redone: readings no longer wake hosts (design R16). Each Swarm entry in the host form now has an etag, and a host sends the etags it holds in a new POST body. Group 5 had to mirror the changed contract.
  • Evidence: #1733 200ebec52 and 282ff95eb, both "Lead's ruling after group 5's end-to-end run". #1737 f13ac1673 and a8f722a7f mirror them in the CLI.
  • Gap (read cost, scale): the design said which part writes wake a host, but gave no cost budget for a host tick. Every machine reports every 15 s, so every tick resent its Swarm. Nobody saw this until a real host ran end to end.
  • Found: group 5's end-to-end run, after groups 3 and 5 had built against the contract.
  • Cost: 0.6 h across two groups and 2 review rounds. One new route and a team-session allowlist entry. The wire contract changed after a client had already been built against it.

D3. Reads loaded the whole Swarm from the database (group 3 to group 3b)

  • Redone: the change read and the host form. They now load only the parts they need, through a second loader (parts/light.ts) and a new stored digest (SwarmGroup.hostDigest).
  • Evidence: the group 3b brief at 14:20, and #1745. An idle Desktop change read sent 2.8 KB but loaded 1.17 MB. The host form loaded 2.3 MB to answer "unchanged", worse than main, which blocked the merge. After the fix they load 45 KB and 16 KB. Group 2's PR (#1735, 12:58) had already noted that host reads "read every part (about 1,150 KB from MongoDB per tick)".
  • Gap (read cost, scale): spec goal 3, "a poll costs what changed", was designed and measured only as bytes sent. Design section 4 fixed the wire contract, but not what each read loads from the database. Group 0's benchmark measured only the wire.
  • Found: group 6's integration benchmark, after groups 2–5 had merged.
  • Cost: a new group, 2.2 h (14:20–16:32), 5 commits and 3 review rounds. Group 6 reran its results. The second loader then caused D4 and D8c.

D4. The second read path disagreed with the first

  • Redone: change reads now apply the known-kind rule that first loads apply. Before, a conversation of a kind written by a newer release reached an older reader in changes but not in a first load.
  • Evidence: group 3b review at 15:42. Fix #1745 58f5a8b13.
  • Gap (compatibility, audience): read filters were written into each read path, not kept as one rule that every path calls. The design listed the audience check for every path (4.4), but not the known-kind check.
  • Found: group 3b review.
  • Cost: 0.1 h and 1 review round.

D5. The new dormant flag broke code that assumed every group was loaded

  • Redone:
    • Losing a project now loads dormant groups too, so their terminals are revoked. A second round extended this to old groups with no project id.
    • A group goes dormant only once its reports are read. This corrects design 3.6 a second time; the design review had already corrected it once.
    • The migration follows the same dormancy rule.
    • The CLI reads a dormant group's history on demand.
    • Desktop keeps paging older archived groups behind newer dormant ones.
  • Evidence:
    • Group 2 review round 1, findings 1 and 3, and round 2. Fixes #1735 99c0060ac and ebe62a97f.
    • #1733 a9dbb7e86.
    • Group 5 review finding 2. Fix #1737 ccdfc6f63.
    • Group 4 review finding 2. Fix #1734 01c138eb3.
  • Gap (growth): design ruling R3 added dormant and said "only the feed and first load read it". It did not list the code that relied on all groups being loaded: access revocation, report wake-ups, route-history checks and the archived list.
  • Found: reviews of groups 2, 4 and 5, after implementation.
  • Cost: 0.9 h and 6 review rounds across four groups. The design was corrected twice.

D6. Versions reset when a key was recreated after its tombstone was purged

  • Redone: people, agents and machines now keep their tombstones for good, compacted to the version after 7 days, so a recreated key continues above its old version. This corrects design ruling 6 and section 2.1.
  • Evidence: group 2 review round 1, finding 4. Ruling "Versions never reset, even after a purge" in #1735.
  • Gap (growth): the design had no lifecycle for a part's key (create, delete, purge, recreate under the same key), so the purge-then-recreate path was never checked against the rule that versions never reset.
  • Found: group 2 review.
  • Cost: part of group 2's two extra rounds (D5). Both the design and the code changed.

D7. The design's touch table would have brought the conflicts back

  • Redone:
    • A post no longer touches its recipients.
    • A terminal turn no longer touches the person who opened the terminal.
    • Delivery claims touch only a person sender.
  • Evidence: #1735 e5d248293 and 5b130091b, the ruling "Touching recipients made every worker's post touch its Lead, and posts in different groups conflicted again", and the Reviewer's guard audit table in #1735. Group 2 review finding 1 (D5) was a gap in that narrowed table.
  • Gap (concurrency): the design's table of parts each command touches was never run against goal 1 (no conflicts between groups) before groups split. Only building it showed the conflict.
  • Found: group 2, while building.
  • Cost: 0.5 h of rework, a per-change guard audit for the Reviewer, and one Important finding that came out of the narrowed table.

D8. The new lost status was not traced through the code that reads work status

The liveness design ("A Swarm that never stops") was a scratchpad doc attached in chat. It joined the branch after the design was approved, with no design review and a 05:00 Vietnam time deadline ("working product first"). Its brief defined lost as "not active", but did not list the code that reads work status or active work. Six fixes followed:

What was patched Evidence Gap Found Cost
a Cancelling lost work brought back a blocking "decide what to do with the worker". liveness A review 15:29; #1742 53908fe9e compatibility: decision derivation (awaitingWorkers) review 0.2 h, 1 round
b A loss decided from a machine report did not guard that report, so it could fence a live worker. liveness A review 15:23; #1742 05a8328a4 concurrency: a sweep outside commands ignored the design's touch rule (3.4) review in a's round
c The light loader dropped the lost marker, so change reads derived a decision that first loads did not. group 3b review 15:51; #1745 bb907dc23 compatibility: the second read path (D3) review 0.6 h, 1 round
d A lost worker became routable again after its task was cancelled or reassigned. The first fix then also refused workers that had recovered. final review I3, 17:45; #1749 bbd17458d, 57410c62e failure: lost, then cancel, reassign, recover final review 1.7 h, 2 rounds
e Rolling back handed lost tasks to a release that cannot read them. final review C2; #1748 migration and rollback (D10) final review in D10
f When liveness lost a task outside a command, the agent's running-work record was never freed. After the release, 16 lost tasks left their agents unassignable for good, even after cancel. #1781 54fa314a8, df7f62bf5; its review found stale deliveries too failure: "an agent has a run record exactly while it owns active work" was kept only by commands and stop receipts, not by the liveness checks production, after release 0.6 h and 2 rounds to fix; 16 agents blocked in production until it ships

Cost: 3.1 h of fixes and 6 review rounds before release, plus the production incident.

D9. A private chat reached a terminal that other people could watch (final review C1)

  • Redone:
    • A native session becomes confidential once it is a Lead or a member of any private conversation, in any Swarm.
    • Only its machine's person may observe, share, read or type into it: through Swarm shares, ordinary shares, other Swarms and agent requesters.
    • A confidential session may be registered in one Swarm only, and a new shared record makes concurrent registrations conflict (SuperTabSessionScope.confidential).
  • Evidence: final review at 17:45. #1751, 10 commits starting at b3dce532a, last fix d6184d911, with five review rounds at 18:52, 19:10, 19:47, 20:40 and 20:47 before Ready at 21:35. An isolated end-to-end run proved it.
  • Gap (audience): the addendum listed where a private conversation must not appear: first load, changes, message reads, notifications, mentions and otherProjectsWork. Those are API routes. It did not list the copies the data makes: the PM's terminal screen and scrollback once a message is delivered, shares made outside a Swarm, and the same session working in another Swarm. The design review did catch one leak of this kind, dormant stubs, at design time.
  • Found: the whole-branch review, after every group had merged.
  • Cost: 4.8 h (17:45–22:34) and 6 review rounds. A new schema field and a new product rule.

D10. Rollback could not represent work added after it was designed (final review C2)

  • Redone: rollback now refuses any Swarm with a private conversation or a lost task, and the recovery path is to roll forward. The refusal's wording was corrected in #1750.
  • Evidence: #1748 07626fe86, #1750 0dc9e5695, and final review C2.
  • Gap (migration and rollback): design 6.4 was written before private conversations and lost existed in the branch. Nobody asked again what the previous release does with each new field when scope grew. That release checks no audience, and does not know the lost status or the lost marker.
  • Found: the whole-branch review.
  • Cost: 1 h and 1 round plus a Minor. A lasting product limit: those Swarms can only roll forward.

D11. The migration refused history from deleted conversations

  • Redone: messages of conversations deleted before the migration are kept and stay unreadable. Verification still rejects anything the migration itself would lose.
  • Evidence: #1778 1374a4f2d. On an isolated restore of the production backup, 24 of 24 Swarms then migrated, and 5,380 orphan messages in 7 Swarms stayed unreadable.
  • Gap (migration and rollback): design 6.3 required "no orphans" in the message fingerprint. That was assumed, not checked against production. The dry run used synthetic Swarms made through real commands, which cannot contain old anomalies. The spec's plan for a production-copy dry run had been replaced by synthetic data, pending an owner ok that never came before the merge.
  • Found: the gated production migration, after the merge to main.
  • Cost: a fix during the release window. The production backend stayed on v1.3.35_backend until the fixed image was built.

D12. Chat with PM after leaving and rejoining opened a chat the person could no longer read

  • Redone: the chat's create request is keyed by membership generation as well as account and project.
  • Evidence: Chat with PM review at 16:15. Fix #1746 c1752b1dd.
  • Gap (audience): the brief required one chat per account and project for life. It did not cover membership ending and starting again, which changes who can read the old chat.
  • Found: review.
  • Cost: 0.25 h and 1 round.

Knock-on cost: the main merge was done twice

Main was merged into the branch at 17:41 (1a3e238bd, reviewed on its own). D8d, D9 and D10 then landed, so the merge was redone at 22:35 (21480ef97, #1747), with its checks run again.

Totals

Builder hours Review rounds Found after the groups merged
D1–D7, D12 (first design and its groups) 5.0 h 16 D3
D8a–c (lost, before the final review) 0.8 h 2 —
D8d, D9, D10 (final review) 7.5 h 9 all
D8f, D11 (after the merge to main) 0.6 h + release fix 2 all; D8f in production
Total about 14 h 29

By design line:

Line Incidents What answering it would have required
growth D5, D6 a lifecycle per record, and the readers of every archived state
concurrency D7, D8b each invariant's keeper on every path; the lock table tried on a thin slice
read cost D1, D2, D3 bytes sent and loaded per read path, removals included
scale D2, D3 the warning metric measured early, not at integration
compatibility D4, D8a, D8c every existing reader of a new field or state
migration and rollback D8e, D10, D11 the previous release per new field; a production restore before merge
audience D9, D12 every copy of private data guarded by the server
failure D8d, D8f the lost state's lifecycle and who frees what
identity, platforms none in #1755 found elsewhere: the Team account work, and #1722's Windows pane

Rule 2 (review the design again) would have triggered on D1, D5 and D8, each patched twice or more, and on #1722 itself. The v1 work joined the branch with no Design section, which rule 1 requires of any spec that stores data. That was the source of D8, D9, D10 and D12, and of the 7.5 h after the whole-branch review.

What worked

  • The design review with code citations found 6 issues in 9 minutes, before any code: the migration fence, private stubs, finished starts, dormant reports, paging ties and owner visibility. Each would have cost a group a round later.
  • Rulings recorded with "cost if wrong" made every deviation reviewable. Several incidents above were found because a ruling stated its assumption.
  • Red-then-green tests in every fix kept fixes from regressing.

Coding slips (not design; no rule cites them)

Ordinary review caught these, and each took one fix round:

  • Group 2:
    • the dormancy sweep could revisit the same ineligible groups forever;
    • the benchmark self-test was not adapted.
  • Group 4:
    • a failed dormant fetch skipped the rest of a change read;
    • the dormant list swallowed the update-required answer.
  • Group 5:
    • updating a part changed its order;
    • a forced full answer was ignored.
  • Routing readiness:
    • query credentials were kept in repository observations;
    • a hung git helper outlived its deadline;
    • a failed probe counted as "cannot".
  • C1 fix: a race test failed when one of its two valid winners won.
  • #1781: stale-record repair left old deliveries claimable.