Skip to content

The ultimate harness for coding agents and beyond. All your agents. All your machines. One command center. Start with code, then follow your curiosity and build across disciplines: CAD, circuits, robots, games and music.

release-cli checks once that it contains the last release (#1254)

Deef75266380f36
diff --git a/cli/scripts/release-cli.sh b/cli/scripts/release-cli.sh
index e7d67a060..68ab8bcb1 100755
--- a/cli/scripts/release-cli.sh
+++ b/cli/scripts/release-cli.sh
@@ -118,14 +118,6 @@ TAG_VER="$(git tag -l 'v*_cli' \
| sort -V | tail -1)"
LAST_TAG=""
[ -z "$TAG_VER" ] || LAST_TAG="v${TAG_VER}_cli"
-# The last release must be in what is released now. A checkout made before another release went out once tagged an
-# older commit with a newer version (v0.3.82_cli on fae1ca5766, after v0.3.81_cli on d96c270493, 2026-10-12; cancelled
-# before it published): every daemon would have updated to the older code.
-if [ -n "$LAST_TAG" ] && ! git merge-base --is-ancestor "$LAST_TAG" HEAD 2>/dev/null; then
- echo "ERROR HEAD does not contain $LAST_TAG, the last release: it would ship older code under a newer version." >&2
- echo " Release from the latest origin/$BRANCH: git fetch, then a clean checkout of it." >&2
- exit 1
-fi
TAG_VER="${TAG_VER:-0.0.0}"
# --- current version, source 2: the version actually being served ---
@@ -162,9 +154,11 @@ fi
# --- preflight: this release must contain the one before it ---
# HEAD on origin/$BRANCH is not enough: a checkout nobody updated is on it too, and a tag cut there ships
# older code under a newer version, which every daemon installs. v0.3.82_cli was tagged that way on
-# October 12, 2026, 27 minutes after v0.3.81_cli and three commits behind it (its run was cancelled
-# before it published). Checked against the highest tag and against the tag of the version being served:
-# they differ when a tag's release never published. A rollback is the one release that means to do this.
+# October 12, 2026 (on fae1ca5766, 27 minutes after v0.3.81_cli on d96c270493 and three commits behind
+# it; its run was cancelled before it published). Checked against the highest tag and against the tag of
+# the version being served: they differ when a tag's release never published. A rollback is the one
+# release that means to do this. The one check: #1246 and #1249 each added one the same hour, and the
+# first, with no way past it, refused the rollback the second allows.
contains_release() {
local tag="$1" sha
git rev-parse -q --verify "refs/tags/$tag" >/dev/null || return 0