OpenProject is the leading open source project management software for product, project and portfolio management. A powerful Jira alternative with agile planning, issue tracking, roadmaps, Gantt charts, time tracking, collaboration features, and more. Available on premises or in the cloud. ⭐ Star us on GitHub

[#62007] New scheduling mode https://community.openproject.org/work_… (#18327)

Maya Berdygylyjova06284360f220
diff --git a/docs/user-guide/gantt-chart/scheduling/README.md b/docs/user-guide/gantt-chart/scheduling/README.md
index 52155496e00..4d4132ede4b 100644
--- a/docs/user-guide/gantt-chart/scheduling/README.md
+++ b/docs/user-guide/gantt-chart/scheduling/README.md
@@ -11,50 +11,63 @@ keywords: Gantt chart, automatic scheduling, manual scheduling, start date, fini
# Automatic and manual scheduling modes
<div class="glossary">
-To schedule work packages in the Gantt chart there is an **automatic scheduling mode (default)** and a **manual scheduling mode** (new in [release 11.0](../../../release-notes/11/11-0-0)). To add dependencies between work packages you can set them as predecessor or follower in the Gantt chart. The automatic and manual scheduling modes influence the work packages' behavior when changing dates of other related work packages.
+To schedule work packages in the Gantt chart, there is an **automatic scheduling mode** and a **manual scheduling mode (default)** (new in [release 15.4](../../../release-notes/15-4-0)). To add dependencies between work packages, you can set them as predecessor or successor in the Gantt chart. The automatic and manual scheduling modes determine how work packages behave when the dates of related work packages change.
</div>
-As the scheduling mode only affects individual work packages you can combine manual scheduling mode (top-down planning) and automatic scheduling mode (bottom-up planning) within the same project.
+
+Since the scheduling mode only affects individual work packages, you can combine manual scheduling (top-down planning) and automatic scheduling (bottom-up planning) within the same project.
| Topic | Content |
| ------------------------------------------------------- | ------------------------------------------------------------ |
-| [Automatic scheduling mode](#automatic-scheduling-mode) | What happens to work packages, when you connect them in automatic scheduling mode? |
-| [Manual scheduling mode](#manual-scheduling-mode) | What happens to work packages, when you connect them in manual scheduling mode? |
-| [Changing mode](#changing-mode) | How can I change between manual and automatic scheduling mode? |
+| [Manual scheduling](#manual-scheduling) | How work packages behave in manual scheduling mode |
+| [Automatic scheduling](#automatic-scheduling) | How to use automatic scheduling to automatically derive dates |
+| [Changing modes](#changing-mode) | How can I change between manual and automatic scheduling mode? |
-## Automatic scheduling mode
-The automatic scheduling mode is generally set as **the default mode** for new work packages. For [dependencies](../#relations-in-the-gantt-chart) between two work packages this means:
+## Manual scheduling
-- A work package's start date is automatically determined by the start date of its earliest starting child.
-- A work package's finish date is automatically determined by the finish date of its latest ending child.
-- When you move a work package past the set start date of its follower, the followers start date will be adjusted to its predecessor's finish date. This is not the case the other way round.
- Example: Work package 1 ends on October 5th. Its follower work package 2 starts on October 13th. Now work package 1 gets delayed by ten days, you have to adjust the planning. When you set the finish date of work package 1 to October 15th, the start date of work package 2 will automatically be set to October 16th.
-- You can't change the dates of a work package with children (if it is in automatic scheduling mode).
+By default, all work packages in OpenProject are manually scheduled.
-## Manual scheduling mode
+In this mode you can select dates at your discretion. Project managers can set timelines based on specific needs, deadlines, or external factors. Manually-scheduled work packages can still have predecessor, successor, parent or child relations, but these relations will not affect the manually input dates.
-The manual scheduling mode is **mostly used when creating a top-down project plan** (e.g. by defining the main phases first). You can then add child work packages without affecting the original (high-level) project schedule.
+Manual scheduling is useful because no *other* work package can affect the dates that are set. For example, a manually scheduled work package can have a predecessor, but even if the predecessor moves forwards in time, the manually scheduled work package will remain unchanged.
-Changing to the **manual scheduling mode makes sense if**
+The **manual scheduling mode** can makes sense if:
- you want to plan your project top-down without knowing all tasks yet, or
- you want to set a parent work package’s date independently from the dates of its children, or
-- you don't want a parent work package's dates being updated automatically when changing the children's dates, or
-- you don't want a follower's start date be automatically updated when you change the predecessor's finish date
+- you don't want the start date of a successor be automatically updated when you change the predecessor's finish date.
Moving a child work package in the manual scheduling mode will not move the dates of the parent work package. The scheduling differences will be indicated by a black or red bracket underneath (e.g. when a child is shorter or longer than the parent phase). See [this explanation](../#understanding-the-colors-and-lines-in-the-gantt-chart) to find out more about the lines and colors in the Gantt chart.
<video src="https://openproject-docs.s3.eu-central-1.amazonaws.com/videos/OpenProject-Top-down-Scheduling.mp4" type="video/mp4" controls="" style="width:100%"></video>
+
+## Automatic scheduling
+
+In [automatic scheduling mode](../../work-packages/set-change-dates/#automatic-scheduling), it is not possible to manually enter a start date. This means that when a task is scheduled, the date picker will automatically calculate the appropriate dates.
+
+> [!TIP]
+> A work package can only be in automatic mode if it has predecessors or children.
+
+An automatically-scheduled work package with predecessors will automatically start one working day after the finish date of the nearest predecessor. You can still enter a duration (and effectively change the finish date). This temporal relationship is maintained even if you the dates of the predecessor are changed. For example, if the predecessor is moved forwards or backwards in time (either because the finish date or duration changed), the automatically-scheduled work package will also change its start date so it starts the day after the new date. This makes it possible to create a dependable chain of automatically scheduled work packages that adjust to planning changes.
+
+> [!NOTE]
+> If you would like to change the lag (or the gap) between when the predecessor ends and the successor starts, you can do so by editing lag in the Relations tab of a work package.
+
+For automatically-scheduled work packages with children, the start and finish dates are determined by the earliest-starting and latest-ending children respectively.
+
## Changing mode
-You can **activate the manual scheduling mode** by clicking on the date of a work package and selecting the box next to "Manual scheduling". This will activate the manual scheduling mode only for the respective work package.
+You can **activate manual or automatic scheduling mode** by clicking on the date of a work package and selecting the respective option in the *Scheduling mode* toggle in the date picker. This will activate the chosen scheduling mode only for the respective work package.
+
+While switching to manual mode is always possible, a work package can only be set to automatic mode if it has predecessors or children.
-![The date picker has checkbox to enable manual scheduling](manual-scheduling-checkbox.png)
+![The scheduling mode switch in the OpenProject date picker with the choice of manual and automatic scheduling](openproject_user_guide_gantt_chart_scheduling_mode_switch.png)
-The pin symbol next to the date indicates that a work package is in manual scheduling mode.
+The auto-date symbol next to the date indicates that a work package is in automatic scheduling mode.
-![image-20200929161237109](image-20200929161237109.png)
+![Auto-date icon next to the start date indicating that a work package is in automatic scheduling mode](openproject_user_guide_gantt_chart_scheduling_auto_icon.png)
-Changing back to automatic scheduling mode works the same way. Please note: When switching from manual scheduling to automatic scheduling some work packages' dates might be updated according to principles [stated above](#automatic-scheduling-mode).
+> [!NOTE]
+> Switching from manual scheduling to automatic scheduling might cause dates to change. When they do, a helpful banner will explain where the derived dates are coming from. Clicking on the "Show relations" button will show all directly-related work packages.
\ No newline at end of file
diff --git a/docs/user-guide/gantt-chart/scheduling/image-20200929161237109.png b/docs/user-guide/gantt-chart/scheduling/image-20200929161237109.png
deleted file mode 100644
index 22d5419650a..00000000000
Binary files a/docs/user-guide/gantt-chart/scheduling/image-20200929161237109.png and /dev/null differ
diff --git a/docs/user-guide/gantt-chart/scheduling/manual-scheduling-checkbox.png b/docs/user-guide/gantt-chart/scheduling/manual-scheduling-checkbox.png
deleted file mode 100644
index d0a496b1927..00000000000
Binary files a/docs/user-guide/gantt-chart/scheduling/manual-scheduling-checkbox.png and /dev/null differ
diff --git a/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_auto_icon.png b/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_auto_icon.png
new file mode 100644
index 00000000000..74993ed9a2c
Binary files /dev/null and b/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_auto_icon.png differ
diff --git a/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_mode_switch.png b/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_mode_switch.png
new file mode 100644
index 00000000000..8ecc6c62b1b
Binary files /dev/null and b/docs/user-guide/gantt-chart/scheduling/openproject_user_guide_gantt_chart_scheduling_mode_switch.png differ
diff --git a/docs/user-guide/work-packages/exporting/README.md b/docs/user-guide/work-packages/exporting/README.md
index 44e657b64eb..d64ad48f98e 100644
--- a/docs/user-guide/work-packages/exporting/README.md
+++ b/docs/user-guide/work-packages/exporting/README.md
@@ -168,7 +168,9 @@ If you select **Generate PDF**, a modal will open, where you can adjust the foll
- *Attributes and description* - this template lists all the work package attributes [configured in the work package form](../../../system-admin-guide/manage-work-packages/work-package-types/#work-package-form-configuration-enterprise-add-on), regardless whether they are filled out or not.
- *Contract* - this template includes work package details formatted to the standard German contract form.
- > [!TIP] You can define which templates are enabled for specific work package types in the [administration settings](../../../system-admin-guide/manage-work-packages/work-package-types).
+
+> [!TIP]
+> You can define which templates are enabled for specific work package types in the [administration settings](../../../system-admin-guide/manage-work-packages/work-package-types).
- **Hyphenation** - if selected, a break line will be included into the export between word for improved layout.
diff --git a/docs/user-guide/work-packages/set-change-dates/README.md b/docs/user-guide/work-packages/set-change-dates/README.md
index b64f0988d81..de672e1e814 100644
--- a/docs/user-guide/work-packages/set-change-dates/README.md
+++ b/docs/user-guide/work-packages/set-change-dates/README.md
@@ -8,184 +8,239 @@ keywords: date picker start finish dates duration change modify update relations
# Set and change dates and duration of work packages
-| Feature | Documentation for |
-|---------------------------------------------------------------------|----------------------------------------------------------------|
-| [Set start and finish dates](#set-start-and-finish-dates) | How to set start and finish dates, and how to change them |
-| [Working days and duration](#working-days-and-duration) | How to set duration, and how it affects start and finish dates |
-| [Scheduling mode](#scheduling-mode) | Enabling manual scheduling and what it does |
-| [Information and warning banners](#information-and-warning-banners) | What the different warning and information banners mean |
+OpenProject offers two scheduling modes for work packages: **Manual** and **Automatic**. These modes provide flexibility in project planning while ensuring logical dependencies between tasks.
-## Set start and finish dates
-
-You can change the start and finish dates of a work package by opening the date picker.
+> [!NOTE]
+> OpenProject 15.4 introduced new automatic scheduling mode alongside the manual scheduling. By default, all new work packages will be set to **manual scheduling**.
-![The standard date picker with different elements highlighted](standard-date-picker-legend.png)
+| Feature | Documentation for |
+| --------------------------------------------------------- | ------------------------------------------------------------ |
+| [Set start and finish dates](#set-start-and-finish-dates) | How to set start and finish dates, and how to change them |
+| [Working days and duration](#working-days-and-duration) | How to set duration, and how it affects start and finish dates |
+| [Manual scheduling mode](#manual-scheduling) | Enabling manual scheduling and what it does |
+| [Automatic scheduling mode](#automatic-scheduling) | Enabling automatic scheduling and what it does |
-1. [Manual scheduling](#scheduling-mode) switch
-2. Working days only switch
-3. Start date, finish date and duration input fields
-4. Mini calendars for date range preview
-5. Save and cancel buttons
+## Set start and finish dates
-You can open the date picker for a work package from a number of different places:
+You can change the start and finish dates of a work package by opening the date picker. You can open the date picker for a work package from a number of different places:
- By clicking on the date field in the work package [details view](../work-package-views/#full-screen-view)
-- By clicking the the date field in the work package [split screen view](../work-package-views/#split-screen-view) (from any other view, including [notification center](../../notifications), [team planner](../../team-planner/), [boards](../../agile-boards)...)
+- By clicking the date field in the work package [split screen view](../work-package-views/#split-screen-view) (from any other view, including [notification center](../../notifications), [team planner](../../team-planner/), [boards](../../agile-boards)...)
- By clicking the start date, finish date or duration fields in [table view](../work-package-views/#table-view)
-### Using the date picker
+Here is an example of the date picker in OpenProject. This is what you will see:
-You can enter dates either by typing them in into the start and finish date fields or by clicking on individual dates in the mini calendar below.
+![The standard OpenProject date picker with different elements highlighted](openproject_user_guide_date_picker.png)
-> **Note**: Typed dates need to be in the standard ISO 8601 format: **YYYY-MM-DD** (so 12 October 2022 would be 2022-10-12).
->
-> They will nevertheless be displayed in your desired format (usually depending by your region or language).
+1. The **information banner** on top of date picker will state what scheduling mode is selected and if there are possible date constraints due to existing work package relations. The message will vary depending on the scheduling mode selected and the existing work package relations. This banner is only shown for work packages that have relations
+2. The **show relations** button on the banner will open a Gantt chart view showing an overview of all directly-related work packages
+3. The **Relation tabs** let you see a list of relevant relations for the current work pacakges: *predecessors*, *successors* or *children*
+4. The **scheduling mode toggle** allows you to switch between [manual](#manual-scheduling) and [automatic](#automatic-scheduling) modes
+5. The **Working days only** switch, that lets you switch between counting only working days or all days to the total duration
+6. **Start date**, **finish date** and **duration** input fields
+7. **Mini calendars** for date range preview
+8. **Save** and **cancel** buttons.
-You can also click on the **Today** link below the start and finish date fields to use today's date.
+## Information and warning banners
-A more intuitive way to select start and end dates is to simply click on two different dates in the mini calendars below. Two calendar months are displayed for better visibility.
+Helpful banners on top of the date picker give you important contextual information when changing dates and/or scheduling mode on work packages with relations.
-Start by clicking on a start date. This will enter the selected date as the start date, mark it with a dark color on the mini calendar below and move the focus to the finish date field. Hovering on different finish dates will give you a preview of the date range for the work package if you click this second date. Once you have decided on a finish date, click on it. This will enter the finish date in the date field and mark that date with another dark color. The dates in between will be highlighted with a lighter color.
+Information banners have a blue or yellow background and display information that is helpful but not critical. Warning banners have an orange background and display information that is critical, with potentially larger consequences to project scheduling.
-To confirm the selected dates, click on the **Save** button. The green message on top of the work package indicates a successful update.
+The information in the banners provides scheduling details, such as:
-![A green toast indicating successful update](successful-update.png)
+- When a related work package (predecessor or child) is setting the dates for the current work package in automatic scheduling mode
+- If there is a gap between predecessors and the current work package in manual mode
+- If there are overlapping dates between predecessors and the current work package in manual mode
-To clear a date field, simply click on the **clear icon** ("×") icon when the field is in focus.
+![Examples of four possible date picker information banners in OpenProject](openproject_user_guide_date_picker_banner_examples.png)
-![A focused date field has an X to clear it](clear-date-field.png)
+> [!NOTE]
+> When both an information and a warning banner are applicable to a work package, only the more important warning banner is displayed.
-Date changes are documented in the work package [Activity](../../activity/).
+## Date picker tabs
-### Advanced functionality
+Apart from the default *Dates* tab, date picker also includes the following relations related tabs:
-- The date picker allows you to pick start and finish dates in the opposite order. Clicking on a start date and then moving backwards to click on an earlier date will then use that first date as the finish date and the second (earlier) date as the start date.
+- **Predecessors** – Displays all predecessor work packages.
+ - *Predecessors* are tasks that must be completed before the current one can begin.
+ - In automatic mode, the closest predecessor from which the current work package derives its dates is marked with a **“closest”** label.
-- For a work package that already has a start and finish date, it is possible to adjust just the finish date: click on the finish date field and then click on a new date. As long as this date is after the start date, the finish date will update accordingly. If the date you pick is earlier than the start date, the original start date will then be cleared and a click on a second date will define the other end of the new range.
+- **Successors** – Displays all successor work packages.
+ - *Successors* are tasks that will commence after the current one is finished.
+ - In automatic mode, the start dates of successors are affected by the current work package’s finish date.
-- It is possible to set only one of the two dates. To do this, click on the field you would like to set (start date is selected by default, but you can change this manually to finish date) and click on a date. Then save without selecting a second date. Alternatively, if a a range is already selected, simply remove one of the dates and save.
+- **Children** – Displays all child work packages.
+ - *Children* are sub-tasks that fall under the current work package.
+
+ - If a work package has children, it will **default to automatic scheduling mode**.
+
+ - The start and finish dates of the parent work package will cover the dates of all its child work packages.
+
-**Note**: The precedes-follows relation can constrain or affect the dates of work packages. For more information, see [Moving related work packages](../work-package-relations-hierarchies/#moving-related-work-packages).
+![Date picker tab in an OpenProject work package with the children tab opened and showing children work packages](openproject_user_guide_date_picker_children_tab.png)
-### One-day events
+> [!TIP]
+> The number of existing related work packages is identified by the number next to the tab name.
-If you want the work package to start and finish on the same date, simply click the same date twice.
+![Date picker in OpenProject work package with highlighted number or related work packages as shown next to the tab name](openproject_user_guide_date_picker_banner_number_of_related_wp_shown.png)
-![Date picker with the same start and finish dates](one-day-event.png)
+## Scheduling mode
-Work packages with *only* a start date or only a finish date are automatically considered one-day events.
+OpenProject offers two scheduling modes: **Manual** and **Automatic**.
-Certain work package types (such as Milestones) can only span one day and thus have only one date field:
+In **Manual scheduling mode**, you can freely set start and finish dates independent of any work package relations. In **automatic scheduling mode**, the dates are automatically derived from predecessors or children.
-![Milestones have datepickers with a single date field](milestone-datepicker.png)
+### Manual scheduling
-## Working days and duration
+Manual scheduling is useful when you need fixed dates, such as when dependencies are uncertain or not yet defined.
-Starting with OpenProject 12.3, it is possible to manually input a duration for a work package and decide whether this duration should include working days only or all calendar days.
+Enabling **Manual Scheduling** activates [manual scheduling mode](../../gantt-chart/scheduling/#manual-scheduling) for the work package. This mode allows you to set any start and end dates, ignoring dependencies such as **follows/proceeds** or **children** relationships. To enable the manual scheduling mode, click the **Manual** button in the **Scheduling mode** switch of the date picker.
-> **Note:** Working dates are currently defined by the administrator of your OpenProject instance. By default, they are Monday to Friday, with Saturday and Sunday considered non-working. If you are an administrator, please read our [admin guide on working days](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours).
->
-> **When upgrading to 12.3 from a previous version:** Please note that this switch will be set to ***off*** for all existing work packages so as to preserve start and finish dates. However, the switch will be ***on*** by default for new work packages.
+![A switch on the date picker allows you to enable manual scheduling mode in OpenProject](openproject_user_guide_date_picker_manual_mode_switch.png)
-### Working days
+> [!TIP]
+> With the introduction of the new automatic mode in OpenProject 15.4, **manual scheduling** mode is the default scheduling mode for newly created work packages. [Read more about it in our blog](https://www.openproject.org/blog/new-automatic-scheduling-mode/).
-![The "Working days only" switch on the datepicker](working-days-only-switch.png)
+In manual mode, parent and child work packages are no longer linked for scheduling purposes. Parent dates do not adjust based on child dates and children can be scheduled outside the parent’s range. These relationships remain visible in the **Gantt view** but do not affect scheduling unless you switch back to automatic mode.
-The **Working days only** switch is on by default, and the date picker skips over the weekend (or the days defined as non-working days) when scheduling work packages and deriving duration. In this mode, non-working days are marked with a darker color and are not clickable. Work packages cannot start or finish on non-working days, and these days do not count towards the calculation of duration.
+When switching from automatic to manual scheduling, a warning banner notifies you that **follows/precedes** and **parent/child** relations are now ignored. This allows unrestricted date selection and prevents the work package from affecting others, despite existing relationships.
-Switching **Working days only** off will turn the previously disabled non-working days into regular working days, and make them available for scheduling. The duration will now take these days into account.
+![A yellow banner warning the user that manual scheduling will ignore existing relations in OpenProject date picker](openproject_user_guide_date_picker_banner_manual_mode_relations_ignored.png)
-### Duration
+### Automatic scheduling
-Duration is always expressed in days, and is the total number of days between the start and finish dates (inclusive). The **Duration** field is directly related to the start and finish dates, but does not require them. Changing one will change the other.
+Automatic scheduling is useful for automatically scheduling work packages with existing dependencies.
-![The Duration field is to the right of the Finish date](duration-field-focus.png)
+A work package can only be in automatic scheduling mode if it has predecessors or children.
-Duration can either be automatically derived from dates or entered manually. When the duration field is is focus, you can enter a number corresponding to days; you do you not need to type the word "days" (or the equivalent in your language), this will automatically be added for you.
+An automatically-scheduled work package with predecessors will automatically start one working day after the finish date of the nearest predecessor. You can still enter a duration (and effectively change the finish date). This temporal relationship is maintained even if you the dates of the predecessor are changed; for example, if the predecessor is moved forwards or backwards in time (either because the finish date or duration changed), the automatically-scheduled work package will also change its start date so it starts the day after the new date. This makes it possible to create a dependable chain of automatically scheduled work packages that automatically adjust to planning changes.
-#### Duration when start and finish dates exist
+![A switch on the date picker allows you to enable automatic scheduling mode in OpenProject](openproject_user_guide_date_picker_banner_automatic_mode.png)
-When you set a start and a finish date, the duration is automatically derived. For example, if the start date is set to *Wednesday, 12 October, 2022* and the finish date to *Friday, 14 October, 2022*, a duration of 3 days is derived.
+When switching from manual to automatic scheduling, a warning banner notifies you the dates are not determined by child work packages. This allows automatic date setting based on exiting relations.
-![A duration of 3 days automatically derived from the start and finish dates](datepicker-3-days.png)
+![A blue banner informing the user that the worked package is automatically scheduled](openproject_user_guide_date_picker_banner_automatic_mode_relations_banner.png)
-Changing the duration when both start and finish dates are already set will then update the finish date. In our example, if you change the duration to 4 days, one of two things can happen:
+### Date picker in OpenProject
-- *If the Working days only switch is **on***, the finish date is automatically set to Monday, 17 October, 2022 (since Saturday and Sunday are not working days)
-- *If the Working days only switch is **off***, the finish date is automatically set to Saturday, 15 October, 2022 (since all calendar days are included)
+With the introduction of the new automatic mode in OpenProject 15.4, there are two date modes in OpenProject, **single-date** and **range** mode.
-### Duration when only one date exists
+#### Single-date mode
-A work package cannot have only one date *and* a duration; the other date is automatically derived. This derived date can either be the start date or the finish date.
+By default, new work packages start in single-date mode, with only the **Finish date** field active. This makes it easy to quickly set a deadline for a task.
-For example, if you set the start date to *Wednesday, 12 October* and enter a duration of 3 days, a finish date of Friday, 14 October is automatically derived. Conversely, if you set the finish date *Friday, 14 October* and then set the duration to 3 days, the date picker will count backwards and derive a start date of *Wednesday, 12 October.*
+If you would also like to add a start date, you can do so by clicking on the **+ Start date** button and choosing a start date. The work package will go into *range mode* with both Start and Finish dates. You can also remove the Finish date and get the date picker to go back to single-date mode but this time with only the Start date as the sole date.
-#### Duration without start and finish dates
+![A date picker modal for a newly created work package in OpenProject, showing only finish date and a button to add a start date](openproject_user_guide_date_picker_new_wp_single_date_mode.png)
-It is possible for a work package to have only duration without any start or finish dates set.
+If the [use current date as start date for new work packages](../../../system-admin-guide/manage-work-packages/work-package-settings/) setting is active, the start date will always be set and that date will be the active one. In this case you can add the finish date by clicking the **+ Finish date** button.
-> **Note:** If you add even one date to a work package with duration, the other date is automatically derived; it is not possible to have just one date (start *or* finish) and duration set. Please note also that if a work package with only duration derives its start date via a relation, the finish date is then also derived.
+![A date picker modal for a newly created work package in OpenProject, showing only start date and a button to add a finish date](openproject_user_guide_date_picker_new_wp_single_date_mode_finish_date.png)
-Setting only duration without start or finish dates is especially useful when you have a general estimation of how long different tasks or phases of a project will take, but do not have exact dates defined quite yet.
+#### One-day events
-> **Pro tip:** This feature makes it possible to automatically derive an estimated start or finish date for entire project.
->
-> To do so, create a series of work packages that represent the main phases and set the approximate duration for each. Link them all using follow/precedes relationships. Now, when you set a start date on the first work package in the series, the start and end dates for all other work packages will be derived.
+Work packages with *only* a start date or only a finish date are automatically considered one-day events. If you want the work package (for example a Milestone) to start and finish on the same date, simply click the same date twice.
-## Scheduling mode
+![Date picker with the same start and finish dates in OpenProject](openproject_user_guide_date_picker_milestone.png)
-### Manual scheduling
+#### Range mode
-![A switch on the date picker allows you to enable manual scheduling ](manual-scheduling-switch.png)
+**Range mode** is the scheduling mode in which a work package has both start and finish dates, and therefore also a duration.
-Switching "Manual scheduling" on enables [manual scheduling mode](../../gantt-chart/scheduling/#manual-scheduling-mode) for the work package. This ignores work package relations such that you're able to select any start and end dates, even ones that would normally be restricted due to follows/proceeds relationships.
+#### Using the date picker
-Manual scheduling also decouples the start and end dates of parent and children work packages. This means that the dates of parents are no longer constrained by those of the children, and children can be scheduled outside of the range of parent work packages. These relationships are completely ignored as far as scheduling is concerned, but are not removed (so they will still be visible in Gantt view; the constraints are respected again if you switch manual scheduling off.
+You can enter dates by typing them in into the start and finish date fields.
-Manual scheduling can be useful when you need to anchor a work package to fixed dates, for example because the dates of preceding or following work packages are not yet known.
+> [!NOTE]
+> Typed dates need to be in the standard ISO 8601 format: **YYYY-MM-DD** (so 12 October 2022 would be 2022-10-12). They will nevertheless be displayed in your desired format (usually depending by your region or language).
-## Information and warning banners
+To quickly set today’s date, click the **Today** link below the date fields.
-OpenProject 12.2 introduced helpful banners to give you important contextual information when changing dates on work packages with [relations](../work-package-relations-hierarchies).
+You can also set the start and finish dates by using the mini calendars. Two calendar months are displayed for better visibility.
-Information banners have a blue background and display information that is helpful to the user but is not critical. Warning banners have an orange background and display information that is critical, with potentially larger consequences to project scheduling.
+Start by clicking on a start date. This will enter the selected date as the start date, mark it with a dark color on the mini calendar below and move the focus to the finish date field. Hovering on different finish dates will give you a preview of the date range for the work package if you click this second date. Once you have decided on a finish date, click on it. This will enter the finish date in the date field and mark that date with another dark color. The dates in between will be highlighted with a lighter color.
-There are four possible banners:
+Click **Save** to confirm your selection. A green confirmation message will appear.
-### Automatically scheduled
+![A green toast indicating successful date picker update in OpenProject](openproject_user_guide_date_picker_update_success_message.png)
-![A blue banner informing the user that the worked package is automatically scheduled](banner-automatically-scheduled.png)
+To clear a date field, simply click on the **clear icon** ("×") icon in the relevant field.
-This information banner is displayed when the dates of the current work package are derived from existing relations and can therefore not be modified. This is the case of parent work packages whose start and finish dates are derived from the earliest and latest child work packages respectively.
+![A focused date field has an X to clear it](openproject_user_guide_date_picker_clear_date_field.png)
-It is nevertheless possible to input specific start and finish dates for such work packages by enabling manual scheduling (which will ignore relations from which the dates were originally derived).
+Date changes are documented in the work package [Activity](../../activity/).
-### Available start date and finish dates limited by relations
+### Advanced functionality
-![A blue banner informing the user that certain dates are limited by relations](banner-dates-limited.png)
+- The date picker allows you to pick start and finish dates in the opposite order. Clicking on a start date and then moving backwards to click on an earlier date will use that first date as the finish date and the second (earlier) date as the start date.
-This information banner is displayed when certain date ranges are disabled due to constraints imposed by follows/precedes relations. For example, a work packages following another one cannot be scheduled before the finish date of the the preceding one.
+- For a work package that already has a start and finish date, it is possible to adjust just the finish date: click on the finish date field and then click on a new date. As long as this date is after the start date, the finish date updates accordingly. If the date you pick is earlier than the start date, the original start date will then be cleared and a click on a second date will define the other end of the new range.
-### Manually scheduled, relations ignored
+- It is possible to set only one of the two dates. In range mode, simply clear the *other* date and save the date picker. It will now go into single-date mode.
-![An orange banner warning the user that manual scheduling will ignore existing relations](banner-manual-relations-ignored.png)
+> [!NOTE]
+> The precedes-follows relation can constrain or affect the dates of work packages. For more information, see [Moving related work packages](../work-package-relations-hierarchies/#moving-related-work-packages).
-This warning banner is displayed when you enable manual scheduling on work packages that have follows/precedes or parent/child relations, which are now ignored and no longer limit which dates can be selected for this work package. This also means that changes a manually scheduled work package no longer affect others, despite those existing relations.
+### Show relations button
-This banner is _not_ displayed when manual scheduling is enabled on work packages without relations.
+![The Show Relations button in an information or warning banner](banner-show-relations-button.png)
-### Other work packages affected
+The information and warning banners also feature a **Show Relations** button. Clicking on this will open a new tab that displays all direct relations to the current work package in [Gantt view](../../gantt-chart), in hierarchy mode.
-![An orange banner warning the user that changing these dates will affect other the dates of work packages](banner-other-workpackages-affected.png)
+> [!NOTE]
+> This preview is intended to give a quick overview of only _direct_ relations that might affect scheduling options for the current work package. It does not show second-level relations (and above). To get a full overview, please use the project work package [table view](../work-package-views/#table-view) or [Gantt view](../../gantt-chart) with your desired [filter/view configuration](../work-package-table-configuration/).
-This warning banner is displayed on work packages whose start and end dates affect those of other related work packages. For example, when changing the finish date will consequently change the start date of another (following) work package and/or the finish date of a parent.
+## Working days and duration
-> **Info**: When both an information and a warning banner are applicable to a work package, only the more important warning banner is displayed.
+You can manually input a duration for a work package and decide whether this duration should include working days only or all calendar days.
-### Show Relations button
+> [!NOTE]
+> Working dates are defined by the administrator of your OpenProject instance. By default, they are Monday to Friday, with Saturday and Sunday considered non-working. If you are an administrator, please read our [admin guide on working days](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours).
-![The Show Relations button in an information or warning banner](banner-show-relations-button.png)
+### Working days
+
+![The "Working days only" switch on the date picker in OpenProject](openproject_user_guide_date_picker_working_days_only.png)
+
+The **Working days only** switch is on by default, and the date picker skips over the weekend (or the days defined as non-working days) when scheduling work packages and deriving duration. In this mode, non-working days are marked with a darker color and are not clickable. Work packages cannot start or finish on non-working days, and these days do not count towards the calculation of duration.
+
+Switching **Working days only** off will turn the previously disabled non-working days into regular working days, and make them available for scheduling. The duration will now take these days into account.
+
+### Duration
+
+Duration is always expressed in days, and is the total number of days between the start and finish dates (inclusive). The **Duration** field is directly related to the start and finish dates, but does not require them. Changing one will change the other.
+
+![The Duration field is to the right of the Finish date in OpenProject date picker](openproject_user_guide_date_picker_duration.png)
+
+Duration can either be automatically derived from dates or entered manually. When the duration field is in focus, you can enter a number corresponding to days; you do not need to type the word "days" (or the equivalent in your language), it is automatically added.
+
+#### Duration when start and finish dates exist
+
+When you set a start and a finish date, the duration is automatically derived. For example, if the start date is set to *Wednesday, 12 October, 2022* and the finish date to *Friday, 14 October, 2022*, a duration of 3 days is derived.
+
+![A duration of 3 days automatically derived from the start and finish dates](openproject_user_guide_date_picker_automatically_derived_duration.png)
+
+Changing the duration when both start and finish dates are already set will then update the finish date. In our example, if you change the duration to 4 days, one of two things can happen:
+
+- *If the Working days only switch is **on***, the finish date is automatically set to Monday, 17 October, 2022 (since Saturday and Sunday are not working days)
+- *If the Working days only switch is **off***, the finish date is automatically set to Saturday, 15 October, 2022 (since all calendar days are included)
+
+#### Duration when only one date exists
-The information and warning banners also feature a **Show Relations** button. Clicking on this will open a new tab that displays work packages with direct relations to the current work package in [Gantt view](../../gantt-chart), in hierarchy mode.
+A work package cannot have only one date *and* a duration; in range mode, the other date is automatically derived and in single-date mode, the duration field is not available.
-> **Info**: This preview is intended to give a quick overview of only _direct_ relations that might affect scheduling options for the current work package. It does not show second-level relations (and above). To get a full overview, please use the project work package [table view](../work-package-views/#table-view) or [Gantt view](../../gantt-chart) with your desired [filter/view configuration](../work-package-table-configuration/).
+For example, in range mode, if you set the start date to *Wednesday, 12 October* and enter a duration of 3 days, a finish date of Friday, 14 October is automatically derived. Conversely, if you set the finish date *Friday, 14 October* and then set the duration to 3 days, the date picker will count backwards and derive a start date of *Wednesday, 12 October.*
+
+#### Duration without start and finish dates
+
+A work package can have only a duration without any start or finish dates set.
+
+> [!NOTE]
+> If you add even one date to a work package with duration, the other date is automatically derived; it is not possible to have just one date (start *or* finish) and duration set. Please note also that if a work package with only duration derives its start date via a relation, the finish date is then also derived.
+
+Setting only duration without start or finish dates is especially useful when you have a general estimation of how long different tasks or phases of a project will take, but do not have exact dates defined quite yet.
+
+> [!TIP]
+> This feature makes it possible to automatically derive an estimated start or finish date for entire project.
+>
+> To do this, create a series of work packages representing the main phases and set the approximate duration for each. Link them all using follow/precedes relationships. Now, when you set a start date on the first work package in the series, the start and end dates for all other work packages will be derived.
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker.png
new file mode 100644
index 00000000000..3acb214e428
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_automatically_derived_duration.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_automatically_derived_duration.png
new file mode 100644
index 00000000000..a35cb19375b
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_automatically_derived_duration.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode.png
new file mode 100644
index 00000000000..e430ae55417
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode_relations_banner.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode_relations_banner.png
new file mode 100644
index 00000000000..d825d085872
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_automatic_mode_relations_banner.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_examples.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_examples.png
new file mode 100644
index 00000000000..9059c7eab5f
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_examples.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_manual_mode_relations_ignored.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_manual_mode_relations_ignored.png
new file mode 100644
index 00000000000..b5d376fa1bb
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_manual_mode_relations_ignored.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_number_of_related_wp_shown.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_number_of_related_wp_shown.png
new file mode 100644
index 00000000000..b54226d218a
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_banner_number_of_related_wp_shown.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_children_tab.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_children_tab.png
new file mode 100644
index 00000000000..d334e282d05
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_children_tab.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_clear_date_field.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_clear_date_field.png
new file mode 100644
index 00000000000..610e5dad5c0
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_clear_date_field.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_duration.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_duration.png
new file mode 100644
index 00000000000..1b934a9f958
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_duration.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_manual_mode_switch.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_manual_mode_switch.png
new file mode 100644
index 00000000000..4976d56af99
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_manual_mode_switch.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_milestone.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_milestone.png
new file mode 100644
index 00000000000..0140be6c872
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_milestone.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode.png
new file mode 100644
index 00000000000..44ba18fb18b
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode_finish_date.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode_finish_date.png
new file mode 100644
index 00000000000..ac3d2bfd8f3
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_new_wp_single_date_mode_finish_date.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_update_success_message.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_update_success_message.png
new file mode 100644
index 00000000000..6ed9ff6aa0a
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_update_success_message.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_working_days_only.png b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_working_days_only.png
new file mode 100644
index 00000000000..d6fa79a6e7f
Binary files /dev/null and b/docs/user-guide/work-packages/set-change-dates/openproject_user_guide_date_picker_working_days_only.png differ
diff --git a/docs/user-guide/work-packages/work-package-relations-hierarchies/README.md b/docs/user-guide/work-packages/work-package-relations-hierarchies/README.md
index 95e9a36882a..a64754ee438 100644
--- a/docs/user-guide/work-packages/work-package-relations-hierarchies/README.md
+++ b/docs/user-guide/work-packages/work-package-relations-hierarchies/README.md
@@ -51,7 +51,7 @@ You can select one of the following relations:
- **Blocks / Blocked by** - This option defines status change restrictions between two work packages. If you set a work package A to be blocking work package B, the status of work package B cannot be set to closed or resolved until the work package A is closed.
- **Predecessor (before)/ Successor (after)** - Defines a chronological relation between two work packages. For example, if you set a work package A to precede a work package B, the start date of B has to be at least a day after the finish date of A.
- Please note: If work package B is in [manual scheduling mode](../../gantt-chart/scheduling/#manual-scheduling-mode), changing the finish date of work package A will have no effect on work package B.
+ Please note: If work package B is in [manual scheduling mode](../../gantt-chart/scheduling/#manual-scheduling), changing the finish date of work package A will have no effect on work package B.
> [!TIP]
> Prior to 15.1, *Predecessor (before)* was called *Precedes*, and *Successor (after)* was called *Follows*.