OpenProject is the leading open source project management software for product, project and portfolio management. A powerful Jira alternative with agile planning, issue tracking, roadmaps, Gantt charts, time tracking, collaboration features, and more. Available on premises or in the cloud. ⭐ Star us on GitHub

Updated docs for changes to progress calculation (% complete) (#15201)

Parimal Satyal0a7c99e47e89
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md b/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
index 5de0dfea780..718b6352273 100644
--- a/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
+++ b/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
@@ -7,7 +7,7 @@ keywords: work package settings, work package configuration
---
# Work package settings
-To change basic settings for work package tracking in OpenProject, navigate to **Administration -> Work packages -> Settings**.
+To change basic settings for work package tracking in OpenProject, navigate to **Administration → Work packages → Settings**.
You can adjust the following:
@@ -17,7 +17,9 @@ You can adjust the following:
3. **Use current date as start date for new work packages**. This way the current date will always be set as a start date if your create new work packages. Also, if you copy projects, the new work packages will get the current date as start date.
-4. **Calculate the work package done ratio with** ... defines how the **Progress %** field is calculated for work packages. If you choose "disable", the field will not be shown. If you select "Use the work package field", the Progress % field can be manually set in 10% steps directly in the work package attribute. If you opt for „Use the work package status", the Progress % field is chosen based on the [status of a work package](../work-package-status). In this case a % done value is assigned to every status (for example, "tested" is assigned 80%), which is then adapted if the status changes.
+4. **Progress calculation** lets you pick between two modes for how the **%&nsbp;Complete** field is calculated for work packages.
+ - **Work-based**: % Complete is automatically calculated based on Work and Remaining work values for that work package, both of which are then necessary to have a value for % Complete.
+ - **Status-based**: you will have to define fixed % Complete values for each [work package status](../work-package-status), which will update automatically when team members update the status of their work packages.
5. **Default highlighting mode** (Enterprise add-on) defines which should be the default [attribute highlighting](../../../user-guide/work-packages/work-package-table-configuration/#attribute-highlighting-enterprise-add-on) mode, e.g. to highlight the following criteria in the work package table. This setting is only available for Enterprise on-premises and Enterprise cloud users.
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/README.md b/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
index 8a7c38ba2e0..209b72070d4 100644
--- a/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
+++ b/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
@@ -12,25 +12,27 @@ Work packages can have various status depending on their types, e.g. tasks can h
The status can be set at the top of the work package details view or in the table view in the corresponding column.
-![Sys-admin-work-package-status](Sys-admin-work-package-status.png)The status field can be configured under *Administration ->* *Work packages* -> *Status*. You will see the list of all the existing work package status in the system. You can add new status or change the name and order of existing status.
+![Work packages status dropdown menu in OpenProject](openproject_system_guide_create_wp_stati_dropdown.png)The status field can be configured under *Administration ->* *Work packages* -> *Status*. You will see the list of all the existing work package status in the system. You can add new status or change the name and order of existing status.
To learn about the options for configuring the transition from one status to another navigate to [Manage work package workflows](../work-package-workflows).
## Create a new work package status
-To create a new work package status click the green ***+ New Status*** icon.
-
-![work package status](image-20200211142716298.png)
+To create a new work package status click the green ***+ Status*** icon.
A new window will open, where you will be able to specify the following:
1. Name the new work package status.
-2. Define if the new work package status closes a work package (e.g. relevant when filtering for closed for packages), e.g. a work package status "rejected" will set a work package technically on closed and it will not appear in the default work package table with Open Work packages.
-3. Define if this status is set as default value when creating new work packages. BEWARE: If you decide to set the new status as default it will impact all work packages, existing and future ones. See more below.
-4. Check if this status sets a **work package in read-only mode**. This means no work package attributes can be changed except the status.
-5. Set a **color** for the work package status. The color appears in the status button of the work packages or in the work package table.
-6. Save the new status by clicking **Create**.
-
-![Sys-admin-work-package-new-status](Sys-admin-work-package-new-status.png)
+2. The % Complete value in [Status-based progress calculation mode](../work-package-settings/).
+3. Define if the new work package status closes a work package (e.g. relevant when filtering for closed for packages), e.g. a work package status "rejected" will set a work package technically on closed and it will not appear in the default work package table with Open Work packages.
+4. Define if this status is set as default value when creating new work packages. BEWARE: If you decide to set the new status as default it will impact all work packages, existing and future ones. See more below.
+5. Check if this status sets a **work package in read-only mode**. This means no work package attributes can be changed except the status.
+6. Set a **color** for the work package status. The color appears in the status button of the work packages or in the work package table.
+<!--
+7. Check **Exclude from calculation of totals in hierarchy** if you do not want work packages with this status to *not* be included in the calculation of sums in a hierarchy. This is useful for statuses like *closed* or *rejected*.
+-->
+Save the new status by clicking **Create**.
+
+![Create a new work package status in OpenProject administration](openproject_system_guide_create_new_wp_status.png)
## Setting a new status as default value
@@ -46,6 +48,6 @@ When you decide to set the new status as default status please note the followin
2. To **sort** the status, e.g. in the status drop-down list of the work packages, click on the arrows to move the status up or down in the list.
3. To **delete** the work package type click on the delete icon.
-![Sys-admin-edit-work-package-status](Sys-admin-edit-work-package-status.png)
+![Edit work package status in OpenProject administration](openproject_system_guide_edit_new_wp_status.png)
> **Note**: A new status needs to be activated in the [work package workflows](../work-package-workflows) in order to appear in the status drop down of a work package.
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-edit-work-package-status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-edit-work-package-status.png
deleted file mode 100644
index ff7020e0be1..00000000000
Binary files a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-edit-work-package-status.png and /dev/null differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-new-status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-new-status.png
deleted file mode 100644
index 9d1453e4d64..00000000000
Binary files a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-new-status.png and /dev/null differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-status.png
deleted file mode 100644
index 5f16c460097..00000000000
Binary files a/docs/system-admin-guide/manage-work-packages/work-package-status/Sys-admin-work-package-status.png and /dev/null differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/image-20200211142716298.png b/docs/system-admin-guide/manage-work-packages/work-package-status/image-20200211142716298.png
deleted file mode 100644
index 8ccdf4b433f..00000000000
Binary files a/docs/system-admin-guide/manage-work-packages/work-package-status/image-20200211142716298.png and /dev/null differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png
new file mode 100644
index 00000000000..13410457278
Binary files /dev/null and b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_wp_stati_dropdown.png b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_wp_stati_dropdown.png
new file mode 100644
index 00000000000..0918f3d6298
Binary files /dev/null and b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_wp_stati_dropdown.png differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_edit_new_wp_status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_edit_new_wp_status.png
new file mode 100644
index 00000000000..9149afae66a
Binary files /dev/null and b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_edit_new_wp_status.png differ
diff --git a/docs/user-guide/time-and-costs/README.md b/docs/user-guide/time-and-costs/README.md
index 21d5923a700..2a8733ad36a 100644
--- a/docs/user-guide/time-and-costs/README.md
+++ b/docs/user-guide/time-and-costs/README.md
@@ -14,6 +14,7 @@ Create budgets, log time and costs on specific work packages and create time and
| Topic | Content |
|--------------------------------------|:--------------------------------------------|
+| [Progress tracking](progress-tracking)| How to track progress for work packages |
| [Time tracking](time-tracking) | How to log time to work packages. |
| [Cost tracking](cost-tracking) | How to track unit costs spent in a project. |
| [Time and cost reporting](reporting) | How to create time and cost reports. |
diff --git a/docs/user-guide/time-and-costs/progress-tracking/README.md b/docs/user-guide/time-and-costs/progress-tracking/README.md
index e9a3e2d9ca3..92225f71253 100644
--- a/docs/user-guide/time-and-costs/progress-tracking/README.md
+++ b/docs/user-guide/time-and-costs/progress-tracking/README.md
@@ -2,93 +2,110 @@
sidebar_navigation:
title: Progress tracking
priority: 800
-description: Progress tracking in OpenProject.
-keywords: Progress tracking, cost reporting, earned value analysis, earned value management
+description: How to use OpenProject to track and report progress of work packages in either work-based or status-based reporting modes.
+keywords: Progress tracking, estimated time, remaining time, work, % complete, percentage complete, remaining work
---
# Progress tracking
-You can track the completion of projects in OpenProject by assigning a **% Complete (earlier called Progress (%))** value to individual work packages.
-OpenProject will automatically roll-up progress to parent work packages.
+OpenProject lets you track and monitor the progress of your work packages.
+> **Note:** Since OpenProject 14.0, the way progress is reported and calculated has changed significantly. Please read the documentation below to understand how OpenProject handles work and progress estimates.
+## Terms
-**% Complete** for work packages with children will show two values:
+[OpenProject 13.2](https://www.openproject.org/docs/release-notes/13-2-0/) introduced important changes in the names of three work package fields:
-- the % Complete value from the work package progress itself, set manually (on the left)
-- the value, calculated as an aggregation of % Complete values of the children work packages. This calculated value is a hyperlink, clicking it will open the detailed view of the children and illustrate the computation.
+| **Old term** | **New term** |
+|--------------------|------------------------|
+| Progress | %&nbsp;Complete |
+| Estimated time | Work |
+| Remaining time | Remaining work |
-![](progress-tracking-two-progress-values.png)
+>**Note**: You will still find the new attributes if you search using their older names (in the list of filters, for example).
-## Manual progress tracking
+## Progress reporting modes
-| Topic | Content |
-|-----------------------------------------------------------------------------------------------------|:--------------------------------------------------|
-| [Manual progress tracking](#manual-progress-tracking) | How to track progress manually per work package. |
-| [Progress tracking in the work package hierarchy](#progress-tracking-in-the-work-package-hierarchy) | How to track progress for multiple work packages. |
-| [Status based progress tracking](#status-based-progress-tracking) | How to track progress use work package status. |
+OpenProject offers two modes for reporting progress:
-## Manual progress tracking
+- **Work-based progress reporting** enables you to automatically derive progress based on the values you enter for Work and Remaining work
+- **Status-based progress reporting** allows you to assign fixed % Complete values to statuses, and automatically derive Remaining work based on the values for Work you can enter
-After the initial installation, OpenProject is configured for manual progress tracking. In order to log progress,
-please open the details of a work package.
-The **% Complete (earlier called Progress (%))** field shows the default value of 0%.
+>**Note:** The administrator of your instance will have selected a mode for the entire instance. If you are an administrator, you can modify this by following our [admin guide on work package settings](../../../system-admin-guide/manage-work-packages/work-package-settings).
-![Work package progress field](progress-tracking-wp-field.png)
+### Work-based progress reporting
-Clicking on the progress bar opens an in-place editor
-that allows you to enter a percentage value between 0 and 100.
+%&nbsp;Complete is an automatically calculated value that is a function of Work and Remaining work, unless %&nbsp;Complete is configured to be [set by status](#status-based-progress-reporting).
-![Work package progress field with editor](progress-tracking-wp-field-editor.png)
+>**%&nbsp;Complete** is work done (**Work** - **Remaining work**) divided by **Work**, expressed as a percentage. For example, if Work is set at 50h and Remaining work is 30h, this means that %&nbsp;Complete is _(50h-30h)/50h))_ = **40%**. Please note that these calculations are independent and unrelated to the value of **Spent time** (which is based on actual time logged).
-Pressing enter saves the value and updates dependent work packages (see below).
-Progress is rounded to the next integer.
+This means that for a work package to have a value for %&nbsp;Complete, both Work and Remaining work are required to be set. To make this link clear and transparent, clicking on any of the three values to modify them will display the following pop-over:
-![Work package progress field with 50%](progress-tracking-wp-field-50perc.png)
+![Work estimates and progress pop-over with work-based progress reporting](progress-popover-work-based.png)
-You can also bulk-modify the **% Complete** in the list of work packages.
+This allows you to edit Work or Remaining work and get a preview of the updated %&nbsp;Complete value before saving changes. Changing any one field will automatically update the other two.
-![Bulk editing progress](progress-tracking-bulk-editing.png)
+>**Note:** If you enter a value for Remaining work that is higher than Work, you will see an error message telling you that this is not possible. You will have to enter a value lower than Work to be able to save the new value.
+>
+>Additionally, the value for Remaining work cannot be removed if a value for Work exists. If you wish to unset Remaining work, you need to also unset Work.
-## Progress tracking in the work package hierarchy
+### Status-based progress reporting
-The progress of **work package with children** is calculated as the weighted average of all direct children, using the field **Work (earlier called Estimated time)** as the weight.
-When adding the **% Complete (earlier called Progress (%))** column to a work package hierarchy view, please also add the **Work**
-column as well so that you can track the calculation.
-The screenshot below shows an example hierarchy with aggregated **% Complete**.
+Administrators can also switch to [status-based progress reporting mode](../../../system-admin-guide/manage-work-packages/work-package-settings/) for their instance.
-Please note the **Work** column to the right.
-Here, values next to the sum icon (for example 43 h next to the Main task) indicate the sum of estimated time of the task itself and its children, while values without the sum icon (3 hours) refer to estimated time directly assigned to a work package.
+In this mode, each status is associated with a fixed %&nbsp;Complete value in the [admin settings for each one](../../../system-admin-guide/manage-work-packages/work-package-status/), which can be freely updated by changing the status of a work package. This allows teams to report progress simply by changing the status of their work packages over time.
-![Progress calculation in the WP hierarchy](progress-tracking-hierarchy-progress.png)
+> For example, "New" could be set to 0%, "In progress" to 30%, "In test" to 60% and "Implemented" to 100%. Then, as project members update the status, the %&nbsp;Complete values would reflect these changes automatically.
-Calculation examples:
- * Sub-Task 1 has 50% completion calculated as (16h * 60% + 8h * 30%) / 24h.
- * Sub-Task 2 has 25% completion calculated as (8h * 50% + 8h * 0%) / 16h.
- * Main Task has 40% completion calculated as (24h * 50% + 16h * 25%) / 40h.
+Unlike in work-based progress reporting mode, in status-based mode, Remaining work is an automatically calculated value that cannot be manually edited.
-## Status-based progress tracking
+>**Remaining work** is **Work** times **(100% - %&nbsp;Complete)**, expressed in hours. For example, if the %&nbsp;Complete for a selected status is 50% and Work is 10h, Remaining work is automatically set to 5h.
-As an alternative to the manual progress tracking mode above, you can configure your OpenProject system to associate work packages statuses with fixed values for % Complete .
-In the Administration, please navigate to Work packages -> Settings and change “Calculate the work package done ratio” to
-“Use the work package status”.
+![Work estimates and progress pop-over with status-based progress reporting](progress-popover-status-based.png)
-![Change calculate the work package done ratio](image-20221102110738283.png)
+In Status-based progress reporting mode, Work is not a required value. However, if Work is set, Remaining work is automatically calculated. To make this link clear and transparent, clicking on the value for Work will display the following pop-over:
-In this mode, OpenProject does _not_ allow you to manually modify the
-**% Complete (earlier called Progress (%))** field in the work packages.
-Instead, the **% Complete** value will be set automatically based on the work package
-status configuration page.
+This allows you to edit %&nbsp;Complete (by changing status) or Work and get a preview of the updated Remaining work before saving changes.
-Within the Administration, navigate to Work package -> Status and select the status you want to edit regarding the progress tracking. Here you can select the desired progress percentage from the drop-down menu in the progress line and add it to the status. Please do not forget to save your changes.
+>**Note:** In the upcoming version, statuses cannot have an empty %&nbsp;Complete value in status-based progress reporting mode.When upgrading, all statuses that do not have a value will take the default value of 0%.
+
+
+## Hierarchy totals
+
+OpenProject will automatically show totals for Work, Remaining work and % Complete in a work package hierarchy (any parent with children). These appear in a work package table as a number with a Σ sign next to it, indicating that it is a total of the values of the parent _and_ children.
+
+![Hierarchy totals for Work, Remaining work and % Complete](hierarchy-totals.png)
+
+> **Note**: The total %&nbsp;Complete value of a hierarchy is a weighted average tied to Work. For example, a feature with Work set to 50h that is 30% done will influence the total of %&nbsp;Complete of the parent more than a feature with Work set to 5h that is 70% done.
+
+<!--
+### Excluding certain work packages from totals
+
+In some cases, you might want to exclude certain work packages (like those with status *rejected*) from total calculations of the parent. Administrators can define these exclusions by going to the [Administration settings for any status] and check a new option called "Exclude from calculation of totals in hierarchy". All work packages with this status will then be excluded when calculating the total value for the parent (for all fields: Work, Remaining work and %&nbsp;Complete).
+
+A small info icon will appear next to excluded values to remind you of this fact:
+
+![Warning that a work package type is excluded from hierarchy totals](progress-work-estimates-excludedFromParent.png)
+-->
+
+## Changing modes
+
+When an administrator changes the progress calculation mode from Work-based to Status-based, the % Complete values might be in a transitional stage.
+
+## Work- to status-based
+
+When switching from Work-based to Status-based mode, the previous value for %&nbsp;Complete will be replaced by the the %&nbsp;Complete value associated with the current status of that work package. Then there are two cases to consider:
+
+- If Work was previously set, it will be retained and Remaining work will be re-calculated based on the other two values
+- If Work was previously empty, then Work and Remaining work will remain empty
+
+## Status- to work-based
+
+In Status-based mode, it is possible for work packages to have a %&nbsp;Complete value (defined by the status) without having values for Work or Remaining work. In other words, the Work and Remaining work can be empty.
+
+When switching to Work-based mode, OpenProject will retain the value for %&nbsp;Complete that was set with status. It can then be modified by inputing Work and Remaining work, thereby overwriting the previous value with a new computed value:
+
+![Work estimates and progress pop-over with only the previous % Complete value](progress-popover-percentage-complete-only.png)
-![Progress calculation in the WP hierarchy](progress-tracking-admin-status-percentage-new.png)
-The screenshot above shows a sample configuration of work package statuses together with suitable **% Complete** values.
-For example, setting the status of a work package to “In progress”
-is equivalent to setting **% Complete ** to 50% manually.
-Note: The status and its associated progress value from the
-administration screen also determines the **% Complete ** of
-work packages with children. So there is no roll-up of progress
-in the work package table hierarchy in this configuration.
diff --git a/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png b/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png
new file mode 100644
index 00000000000..5652968a745
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png
new file mode 100644
index 00000000000..c57bea40aa6
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png
new file mode 100644
index 00000000000..c6e6bc1f9dc
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png
new file mode 100644
index 00000000000..5815ca4d6d3
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent.png b/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent.png
new file mode 100644
index 00000000000..bf4ab999819
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent.png differ