OpenProject is the leading open source project management software for product, project and portfolio management. A powerful Jira alternative with agile planning, issue tracking, roadmaps, Gantt charts, time tracking, collaboration features, and more. Available on premises or in the cloud. ⭐ Star us on GitHub

[62891][63152] Recalculate start date when toggling "Working days only"

Christophe Bliard7661671465c8
diff --git a/app/components/work_package_relations_tab/closest_relation.rb b/app/components/work_package_relations_tab/closest_relation.rb
index aca6408807b..8c9f0646ae4 100644
--- a/app/components/work_package_relations_tab/closest_relation.rb
+++ b/app/components/work_package_relations_tab/closest_relation.rb
@@ -57,7 +57,7 @@ module WorkPackageRelationsTab
def soonest_start
return @soonest_start if defined?(@soonest_start)
- @soonest_start = relation.successor_soonest_start(gap: 0.days)
+ @soonest_start = relation.successor_soonest_start
end
def inspect
diff --git a/app/components/work_packages/date_picker/form_component.html.erb b/app/components/work_packages/date_picker/form_component.html.erb
index 1dc490678e9..e3cd37f7df1 100644
--- a/app/components/work_packages/date_picker/form_component.html.erb
+++ b/app/components/work_packages/date_picker/form_component.html.erb
@@ -105,7 +105,6 @@
ignore_non_working_days: work_package.ignore_non_working_days,
schedule_manually:,
is_schedulable: !disabled?,
- minimal_scheduling_date:,
is_milestone: milestone?,
date_mode:,
start_date_field_id: "work_package_start_date",
diff --git a/app/components/work_packages/date_picker/form_component.rb b/app/components/work_packages/date_picker/form_component.rb
index 63fc7f0299c..c47030dde85 100644
--- a/app/components/work_packages/date_picker/form_component.rb
+++ b/app/components/work_packages/date_picker/form_component.rb
@@ -95,10 +95,6 @@ module WorkPackages
def disabled_checkbox?
!schedule_manually && work_package.children.any?
end
-
- def minimal_scheduling_date
- schedule_manually ? nil : work_package.start_date
- end
end
end
end
diff --git a/app/models/relation.rb b/app/models/relation.rb
index 015e0be9ec7..9cf62abcd81 100644
--- a/app/models/relation.rb
+++ b/app/models/relation.rb
@@ -173,11 +173,10 @@ class Relation < ApplicationRecord
successor.start_date || successor.due_date
end
- def successor_soonest_start(gap: 1.day)
+ def successor_soonest_start
if follows? && predecessor_date
- days = WorkPackages::Shared::Days.for(from)
- relation_start_date = predecessor_date + gap
- days.soonest_working_day(relation_start_date, lag:)
+ days = WorkPackages::Shared::WorkingDays.new
+ days.add_lag(predecessor_date, lag)
end
end
diff --git a/app/models/work_package/scheduling_rules.rb b/app/models/work_package/scheduling_rules.rb
index 9254e040329..fea115a96a2 100644
--- a/app/models/work_package/scheduling_rules.rb
+++ b/app/models/work_package/scheduling_rules.rb
@@ -33,32 +33,40 @@ module WorkPackage::SchedulingRules
!schedule_manually?
end
- # TODO: move into work package contract (possibly a module included into the contract)
- # Calculates the minimum date that
- # will not violate the precedes relations (max(finish date, start date) + relation lag)
- # of this work package or its ancestors
- # e.g.
- # AP(due_date: 2017/07/25)-precedes(lag: 0)-A
- # |
+ # Calculates the minimum date that will not violate the precedes relations
+ # (max(finish date, start date) + relation lag) of this work package or its
+ # ancestors
+ #
+ # Lag is the number of non working days between 2 work packages of a
+ # follows/precedes relation.
+ #
+ # For instance:
+ # AP -------------- precedes ----- A
+ # (due_date: 2017/07/25) (lag: 0) |
# parent
# |
- # BP(due_date: 2017/07/22)-precedes(lag: 2)-B
- # |
+ # BP -------------- precedes ----- B
+ # (due_date: 2017/07/22) (lag: 2) |
# parent
# |
- # CP(due_date: 2017/07/25)-precedes(lag: 2)-C
+ # CP -------------- precedes ----- C
+ # (due_date: 2017/07/25) (lag: 2)
+ #
+ # Then successor_soonest_start for each relation is:
+ # A is 2017/07/26 (AP due date: 25, no lag => 26)
+ # B is 2017/07/27 (BP due date: 22, 23 and 24 are non-working days, 25 and 26 is the 2 days lag => 27)
+ # C is 2017/07/28 (CP due date: 25, 26 and 27 is the 2 days lag => 28)
#
- # Then soonest_start for:
- # C is 2017/07/28
- # B is 2017/07/26
- # A is 2017/07/26
+ # The soonest start for this work package is the maximum of these values: 2017/07/28.
def soonest_start
- # eager load `to` and `from` to avoid n+1 on successor_soonest_start
- @soonest_start ||=
+ # eager load `to` to avoid n+1 in #successor_soonest_start
+ @scheduling_relations_soonest_start ||=
Relation
.used_for_scheduling_of(self)
- .includes(:to, :from)
+ .includes(:to)
.filter_map(&:successor_soonest_start)
.max
+ WorkPackages::Shared::Days.for(self)
+ .soonest_working_day(@scheduling_relations_soonest_start)
end
end
diff --git a/app/services/work_packages/schedule_dependency/dependency.rb b/app/services/work_packages/schedule_dependency/dependency.rb
index 67b4c59deec..3edb25a340e 100644
--- a/app/services/work_packages/schedule_dependency/dependency.rb
+++ b/app/services/work_packages/schedule_dependency/dependency.rb
@@ -56,6 +56,7 @@ class WorkPackages::ScheduleDependency::Dependency
follows_relations
.filter_map(&:successor_soonest_start)
.max
+ .then { days.soonest_working_day(it) }
end
def start_date
@@ -91,4 +92,8 @@ class WorkPackages::ScheduleDependency::Dependency
def alive_descendants_dates
alive_descendants.filter_map(&:due_date) + alive_descendants.filter_map(&:start_date)
end
+
+ def days
+ WorkPackages::Shared::Days.for(work_package)
+ end
end
diff --git a/app/services/work_packages/set_attributes_service.rb b/app/services/work_packages/set_attributes_service.rb
index b5971262e7e..7713b0b7be7 100644
--- a/app/services/work_packages/set_attributes_service.rb
+++ b/app/services/work_packages/set_attributes_service.rb
@@ -293,6 +293,7 @@ class WorkPackages::SetAttributesService < BaseServices::SetAttributes
end
def update_dates_from_self
+ # this method is only called by #update_dates when there are no children
min_start = new_start_date
return unless min_start
@@ -388,6 +389,7 @@ class WorkPackages::SetAttributesService < BaseServices::SetAttributes
end
def new_start_date
+ # this method is only called by #update_dates_from_self when there are no children
if work_package.schedule_manually?
# Weird rule from SetScheduleService: if the work package does not have a
# start date, it inherits it from the parent soonest start, regardless of
@@ -409,24 +411,22 @@ class WorkPackages::SetAttributesService < BaseServices::SetAttributes
end
def new_start_date_from_self
- return unless work_package.schedule_manually_changed?
+ # this method is only called by #new_start_date when there are no children
+ return unless work_package.schedule_manually_changed? || work_package.ignore_non_working_days_changed?
- [min_child_date, work_package.soonest_start].compact.max
+ work_package.soonest_start
end
def new_due_date(min_start)
- duration = children_duration || work_package.duration
- return unless work_package.due_date || duration
-
- due_date =
- if duration
- days.due_date(min_start, duration)
- else
- work_package.due_date
- end
-
- # if due date is before start date, then start is used as due date.
- [min_start, due_date].max
+ # this method is only called by #update_dates_from_self when there are no children
+ if work_package.due_date_came_from_user?
+ work_package.due_date
+ elsif work_package.duration
+ days.due_date(min_start, work_package.duration)
+ elsif work_package.due_date
+ # if due date is before start date, then start is used as due date.
+ [min_start, work_package.due_date].max
+ end
end
def work_package
diff --git a/app/services/work_packages/shared/all_days.rb b/app/services/work_packages/shared/all_days.rb
index 0824e79c354..6c66221440f 100644
--- a/app/services/work_packages/shared/all_days.rb
+++ b/app/services/work_packages/shared/all_days.rb
@@ -43,6 +43,11 @@ module WorkPackages
WorkingDays.new.lag(predecessor_date, successor_date)
end
+ def add_lag(date, lag)
+ # lag is *always* excluding non-working days (at least for now)
+ WorkingDays.new.add_lag(date, lag)
+ end
+
def start_date(due_date, duration)
return nil unless due_date && duration
raise ArgumentError, "duration must be strictly positive" if duration.is_a?(Integer) && duration <= 0
@@ -57,9 +62,8 @@ module WorkPackages
start_date + duration - 1
end
- def soonest_working_day(date, lag: nil)
- lag ||= 0
- date + lag.days if date
+ def soonest_working_day(date)
+ date
end
def working?(_date)
diff --git a/app/services/work_packages/shared/working_days.rb b/app/services/work_packages/shared/working_days.rb
index cdf007b285d..4335b81c9b4 100644
--- a/app/services/work_packages/shared/working_days.rb
+++ b/app/services/work_packages/shared/working_days.rb
@@ -40,7 +40,7 @@ module WorkPackages
def duration(start_date, due_date)
return nil unless start_date && due_date
- (start_date..due_date).count { working?(_1) }
+ (start_date..due_date).count { working?(it) }
end
# Returns the number of working days between a predecessor date and
@@ -51,6 +51,18 @@ module WorkPackages
duration(predecessor_date + 1.day, successor_date - 1.day)
end
+ def add_lag(date, lag)
+ return nil unless date
+
+ date_after_lag = date + 1.day
+ lag ||= 0
+ while lag > 0
+ lag -= 1 if working?(date_after_lag)
+ date_after_lag += 1
+ end
+ date_after_lag
+ end
+
def start_date(due_date, duration)
assert_strictly_positive_duration(duration)
return nil unless due_date && duration
@@ -75,16 +87,9 @@ module WorkPackages
due_date
end
- def soonest_working_day(date, lag: nil)
+ def soonest_working_day(date)
return unless date
- lag ||= 0
-
- while lag > 0
- lag -= 1 if working?(date)
- date += 1
- end
-
until working?(date)
date += 1
end
@@ -127,7 +132,7 @@ module WorkPackages
def assert_some_working_week_days_exist
return if @working_week_days_exist
- if working_week_days.all? { |working| working == false }
+ if working_week_days.all?(false)
raise "cannot have all week days as non-working days"
end
diff --git a/frontend/src/app/core/datetime/timezone.service.ts b/frontend/src/app/core/datetime/timezone.service.ts
index ff6714bc718..9ae12ed8e4b 100644
--- a/frontend/src/app/core/datetime/timezone.service.ts
+++ b/frontend/src/app/core/datetime/timezone.service.ts
@@ -132,6 +132,10 @@ export class TimezoneService {
return moment.duration(input, unit).toISOString();
}
+ public utcDateToLocalDate(date:Date):Date {
+ return new Date(date.getTime() + date.getTimezoneOffset() * 60 * 1000);
+ }
+
public utcDateToISODateString(date:Date):string {
return moment.utc(date).format('YYYY-MM-DD');
}
diff --git a/frontend/src/app/shared/components/datepicker/wp-date-picker-modal/wp-date-picker-instance.component.ts b/frontend/src/app/shared/components/datepicker/wp-date-picker-modal/wp-date-picker-instance.component.ts
index f276283f6e8..83e2bb6238b 100644
--- a/frontend/src/app/shared/components/datepicker/wp-date-picker-modal/wp-date-picker-instance.component.ts
+++ b/frontend/src/app/shared/components/datepicker/wp-date-picker-modal/wp-date-picker-instance.component.ts
@@ -71,7 +71,6 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
@Input() public dueDate:string|null;
@Input() public isSchedulable:boolean = true;
- @Input() public minimalSchedulingDate:Date|null;
@Input() public dateMode:DateMode;
@Input() startDateFieldId:string;
@@ -85,6 +84,7 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
private datePickerInstance:DatePicker;
private startDateValue:Date|null;
private dueDateValue:Date|null;
+ private minimalSchedulingDate:Date|null;
private onFlatpickrSetValuesBound = this.onFlatpickrSetValues.bind(this);
constructor(
@@ -101,6 +101,7 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
populateInputsFromDataset(this);
this.startDateValue = this.toDate(this.startDate);
this.dueDateValue = this.toDate(this.dueDate);
+ this.computeMinimalSchedulingDate();
}
ngAfterViewInit():void {
@@ -130,6 +131,7 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
// that date if it's not visible.
const dateToJumpTo = this.findDateToJumpTo(details.dates);
[this.startDateValue, this.dueDateValue] = details.dates;
+ this.computeMinimalSchedulingDate();
this.setDatePickerDates(details.dates, dateToJumpTo);
this.datePickerInstance.setOption('mode', details.mode);
@@ -145,6 +147,10 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
}
}
+ private computeMinimalSchedulingDate() {
+ this.minimalSchedulingDate = this.startDateValue && this.timezoneService.utcDateToLocalDate(this.startDateValue);
+ }
+
private findDateToJumpTo(dates:Date[]):Date|null {
const [start, end] = dates;
if (start && start?.getTime() !== this.startDateValue?.getTime()) {
@@ -250,11 +256,10 @@ export class OpWpDatePickerInstanceComponent extends UntilDestroyedMixin impleme
}
private isDayDisabled(dayElement:DayElement):boolean {
- const minimalDate = this.minimalSchedulingDate || null;
return !this.isSchedulable
|| (!this.scheduleManually
- && !!minimalDate
- && dayElement.dateObj.setHours(0, 0, 0, 0) < new Date(minimalDate).setHours(0, 0, 0, 0));
+ && !!this.minimalSchedulingDate
+ && dayElement.dateObj < this.minimalSchedulingDate);
}
/**
diff --git a/spec/components/work_package_relations_tab/closest_relation_spec.rb b/spec/components/work_package_relations_tab/closest_relation_spec.rb
index 795514e5ac5..4c4ccc9ee4e 100644
--- a/spec/components/work_package_relations_tab/closest_relation_spec.rb
+++ b/spec/components/work_package_relations_tab/closest_relation_spec.rb
@@ -215,21 +215,21 @@ RSpec.describe WorkPackageRelationsTab::ClosestRelation do
let(:due_date) { Date.new(2020, 7, 14) }
context "without a lag" do
- it "returns the due date" do
- expect(closest_relation(due_date:).soonest_start).to eq(Date.new(2020, 7, 14))
+ it "returns the day after the due date" do
+ expect(closest_relation(due_date:).soonest_start).to eq(Date.new(2020, 7, 15))
end
end
context "with a positive lag" do
- it "returns the combined due date and lag" do
- expect(closest_relation(lag: 11, due_date:).soonest_start).to eq(Date.new(2020, 7, 25))
+ it "returns the day after the due date plus the lag" do
+ expect(closest_relation(lag: 3, due_date:).soonest_start).to eq(Date.new(2020, 7, 18))
end
end
context "with a negative lag" do
it "returns the combined due date and lag" do
pending "negative lags are not yet implemented"
- expect(closest_relation(lag: -2, due_date:).soonest_start).to eq(Date.new(2020, 7, 12))
+ expect(closest_relation(lag: -2, due_date:).soonest_start).to eq(Date.new(2020, 7, 13))
end
end
end
@@ -238,21 +238,21 @@ RSpec.describe WorkPackageRelationsTab::ClosestRelation do
let(:start_date) { Date.new(2020, 7, 14) }
context "with a zero lag" do
- it "returns the start date" do
- expect(closest_relation(start_date:).soonest_start).to eq(Date.new(2020, 7, 14))
+ it "returns the day after the start date" do
+ expect(closest_relation(start_date:).soonest_start).to eq(Date.new(2020, 7, 15))
end
end
context "with a positive lag" do
- it "returns the combined start date and lag" do
- expect(closest_relation(lag: 11, start_date:).soonest_start).to eq(Date.new(2020, 7, 25))
+ it "returns the day after the start date plus the lag" do
+ expect(closest_relation(lag: 3, start_date:).soonest_start).to eq(Date.new(2020, 7, 18))
end
end
context "with a negative lag" do
it "returns the combined start date and lag" do
pending "negative lags are not yet implemented (Feature OP#38606)"
- expect(closest_relation(lag: -2, start_date:).soonest_start).to eq(Date.new(2020, 7, 12))
+ expect(closest_relation(lag: -2, start_date:).soonest_start).to eq(Date.new(2020, 7, 13))
end
end
end
@@ -263,7 +263,7 @@ RSpec.describe WorkPackageRelationsTab::ClosestRelation do
it "outputs object for debugging" do
expect(subject.inspect)
- .to start_with("#<WorkPackageRelationsTab::ClosestRelation soonest_start: 2022-07-07")
+ .to start_with("#<WorkPackageRelationsTab::ClosestRelation soonest_start: 2022-07-08")
.and include(subject.relation.inspect)
end
end
diff --git a/spec/features/work_packages/datepicker/datepicker_follows_relation_spec.rb b/spec/features/work_packages/datepicker/datepicker_follows_relation_spec.rb
index 717714add73..f84f70eedfc 100644
--- a/spec/features/work_packages/datepicker/datepicker_follows_relation_spec.rb
+++ b/spec/features/work_packages/datepicker/datepicker_follows_relation_spec.rb
@@ -39,8 +39,8 @@ RSpec.describe "Datepicker logic on follow relationships", :js, with_settings: {
create(:work_package,
type:,
project:,
- start_date: Date.parse("2024-02-01"),
- due_date: Date.parse("2024-02-01"))
+ start_date: Date.parse("2024-02-02"),
+ due_date: Date.parse("2024-02-02"))
end
# assume sat+sun are non-working days
shared_let(:week_days) { week_with_saturday_and_sunday_as_weekend }
@@ -61,70 +61,86 @@ RSpec.describe "Datepicker logic on follow relationships", :js, with_settings: {
datepicker.expect_visible
end
- context "if the follower is a task" do
- let!(:follower) do
- create(:work_package,
- type:,
- project:,
- schedule_manually: false,
- start_date: Date.parse("2024-02-02"),
- due_date: Date.parse("2024-02-06"))
- end
- let!(:relation) { create(:follows_relation, from: follower, to: predecessor) }
- let(:date_field) { work_packages_page.edit_field(:combinedDate) }
-
- it "keeps the minimum dates disabled" do
- datepicker.expect_working_days_only true
- datepicker.expect_automatic_scheduling_mode
-
- datepicker.show_date "2024-02-01"
- datepicker.expect_disabled Date.parse("2024-02-01") # predecessor's due date
- datepicker.expect_not_disabled Date.parse("2024-02-02")
- datepicker.expect_disabled Date.parse("2024-02-03") # Saturday is non-working day
- datepicker.expect_disabled Date.parse("2024-02-04") # Sunday is non-working day
- datepicker.expect_not_disabled Date.parse("2024-02-05")
- datepicker.expect_not_disabled Date.parse("2024-02-06")
- datepicker.expect_not_disabled Date.parse("2024-02-07")
-
- datepicker.toggle_working_days_only
- datepicker.expect_working_days_only false
-
- datepicker.expect_disabled Date.parse("2024-02-01") # predecessor's due date
- datepicker.expect_not_disabled Date.parse("2024-02-02")
- datepicker.expect_not_disabled Date.parse("2024-02-03") # Saturday is non-working day but ignored
- datepicker.expect_not_disabled Date.parse("2024-02-04") # Sunday is non-working day but ignored
- datepicker.expect_not_disabled Date.parse("2024-02-05")
- datepicker.expect_not_disabled Date.parse("2024-02-06")
- datepicker.expect_not_disabled Date.parse("2024-02-07")
+ for_each_context "with default browser timezone",
+ "with a negative browser timezone (New York)" do
+ context "if the follower is a task" do
+ let!(:follower) do
+ create(:work_package,
+ type:,
+ project:,
+ schedule_manually: false,
+ start_date: Date.parse("2024-02-05"),
+ due_date: Date.parse("2024-02-08"))
+ end
+ let!(:relation) { create(:follows_relation, from: follower, to: predecessor) }
+ let(:date_field) { work_packages_page.edit_field(:combinedDate) }
+
+ it "keeps the minimum dates disabled" do
+ datepicker.expect_working_days_only true
+ datepicker.expect_automatic_scheduling_mode
+
+ datepicker.show_date "2024-02-01"
+ datepicker.expect_disabled Date.parse("2024-02-01")
+ datepicker.expect_disabled Date.parse("2024-02-02") # predecessor's due date
+ datepicker.expect_disabled Date.parse("2024-02-03") # Saturday is non-working day
+ datepicker.expect_disabled Date.parse("2024-02-04") # Sunday is non-working day
+ datepicker.expect_not_disabled Date.parse("2024-02-05")
+ datepicker.expect_not_disabled Date.parse("2024-02-06")
+ datepicker.expect_not_disabled Date.parse("2024-02-07")
+
+ datepicker.toggle_working_days_only
+ datepicker.expect_working_days_only false
+
+ datepicker.expect_start_date "2024-02-03", disabled: true
+ datepicker.expect_due_date "2024-02-06"
+ datepicker.expect_disabled Date.parse("2024-02-01")
+ datepicker.expect_disabled Date.parse("2024-02-02") # predecessor's due date
+ datepicker.expect_not_disabled Date.parse("2024-02-03") # Saturday is non-working day but ignored
+ datepicker.expect_not_disabled Date.parse("2024-02-04") # Sunday is non-working day but ignored
+ datepicker.expect_not_disabled Date.parse("2024-02-05")
+ datepicker.expect_not_disabled Date.parse("2024-02-06")
+ datepicker.expect_not_disabled Date.parse("2024-02-07")
+
+ datepicker.toggle_working_days_only
+ datepicker.expect_working_days_only true
+
+ datepicker.expect_start_date "2024-02-05", disabled: true
+ datepicker.expect_due_date "2024-02-08"
+ datepicker.expect_disabled Date.parse("2024-02-02") # predecessor's due date
+ datepicker.expect_disabled Date.parse("2024-02-03") # Saturday is non-working day
+ datepicker.expect_disabled Date.parse("2024-02-04") # Sunday is non-working day
+ datepicker.expect_not_disabled Date.parse("2024-02-05")
+ end
end
- end
- context "if the follower is a milestone" do
- let!(:follower) do
- create(:work_package,
- type: milestone_type,
- project:,
- schedule_manually: false,
- start_date: Date.parse("2024-02-02"),
- due_date: Date.parse("2024-02-02"))
- end
- let!(:relation) { create(:follows_relation, from: follower, to: predecessor) }
- let(:date_field) { work_packages_page.edit_field(:date) }
+ context "if the follower is a milestone" do
+ let!(:follower) do
+ create(:work_package,
+ type: milestone_type,
+ project:,
+ schedule_manually: false,
+ start_date: Date.parse("2024-02-05"),
+ due_date: Date.parse("2024-02-05"))
+ end
+ let!(:relation) { create(:follows_relation, from: follower, to: predecessor) }
+ let(:date_field) { work_packages_page.edit_field(:date) }
- it "disables the whole date picker" do
- datepicker.expect_working_days_only true
- datepicker.expect_automatic_scheduling_mode
+ it "disables the whole date picker" do
+ datepicker.expect_working_days_only true
+ datepicker.expect_automatic_scheduling_mode
- datepicker.show_date "2024-02-02"
- 1.upto(29) do |day|
- datepicker.expect_disabled Date.parse("2024-02-%02d" % day)
- end
+ datepicker.show_date "2024-02-02"
+ 1.upto(29) do |day|
+ datepicker.expect_disabled Date.parse("2024-02-%02d" % day)
+ end
- datepicker.toggle_working_days_only
- datepicker.expect_working_days_only false
+ datepicker.toggle_working_days_only
+ datepicker.expect_working_days_only false
- 1.upto(29) do |day|
- datepicker.expect_disabled Date.parse("2024-02-%02d" % day)
+ datepicker.expect_start_date "2024-02-03", disabled: true
+ 1.upto(29) do |day|
+ datepicker.expect_disabled Date.parse("2024-02-%02d" % day)
+ end
end
end
end
diff --git a/spec/features/work_packages/datepicker/datepicker_logic_spec.rb b/spec/features/work_packages/datepicker/datepicker_logic_spec.rb
index c7bebb0eb5a..64aa28e34bb 100644
--- a/spec/features/work_packages/datepicker/datepicker_logic_spec.rb
+++ b/spec/features/work_packages/datepicker/datepicker_logic_spec.rb
@@ -54,20 +54,6 @@ RSpec.describe "Datepicker modal logic test cases (WP #43539)", :js, with_settin
let(:current_user) { user }
let(:work_package) { bug_wp }
- shared_context "with default browser timezone" do
- let(:_comment) do
- "This context does not try to override the browser timezone. " \
- "It will be the same as the system (positive offset for European devs, UTC for CI)."
- end
- end
-
- shared_context "with a negative browser timezone (New York)", driver: :chrome_new_york_time_zone do
- let(:_comment) do
- "This context overrides browser timezone to be America/New_York. " \
- "Timezone offset is -4/-5 hours (EDT/EST)."
- end
- end
-
def apply_and_expect_saved(attributes)
date_field.save!
diff --git a/spec/models/relation_spec.rb b/spec/models/relation_spec.rb
index 1b72156acb1..2d46c559f96 100644
--- a/spec/models/relation_spec.rb
+++ b/spec/models/relation_spec.rb
@@ -160,12 +160,6 @@ RSpec.describe Relation do
end
describe "#successor_soonest_start" do
- let(:monday) { Date.current.next_occurring(:monday) }
- let(:tuesday) { monday + 1.day }
- let(:wednesday) { monday + 2.days }
- let(:thursday) { monday + 3.days }
- let(:friday) { monday + 4.days }
-
context "with a follows relation" do
let_work_packages(<<~TABLE)
subject | MTWTFSS | predecessors
@@ -175,7 +169,7 @@ RSpec.describe Relation do
it "returns predecessor due_date + 1" do
relation = _table.relation(successor: "follower")
- expect(relation.successor_soonest_start).to eq(tuesday)
+ expect(relation.successor_soonest_start).to eq(_table.tuesday)
end
end
@@ -188,7 +182,7 @@ RSpec.describe Relation do
it "returns predecessor start_date + 1" do
relation = _table.relation(successor: "follower")
- expect(relation.successor_soonest_start).to eq(tuesday)
+ expect(relation.successor_soonest_start).to eq(_table.tuesday)
end
end
@@ -216,13 +210,13 @@ RSpec.describe Relation do
it "returns predecessor due_date + lag + 1" do
relation_a = _table.relation(successor: "follower_a")
- expect(relation_a.successor_soonest_start).to eq(tuesday)
+ expect(relation_a.successor_soonest_start).to eq(_table.tuesday)
relation_b = _table.relation(successor: "follower_b")
- expect(relation_b.successor_soonest_start).to eq(wednesday)
+ expect(relation_b.successor_soonest_start).to eq(_table.wednesday)
relation_c = _table.relation(successor: "follower_c")
- expect(relation_c.successor_soonest_start).to eq(friday)
+ expect(relation_c.successor_soonest_start).to eq(_table.friday)
end
end
@@ -234,22 +228,27 @@ RSpec.describe Relation do
follower_lag1 | ░ ░ ░░ ░ | follows main with lag 1
follower_lag2 | ░ ░ ░░ ░ | follows main with lag 2
follower_lag3 | ░ ░ ░░ ░ | follows main with lag 3
+ follower_lag4 | ░ ░ ░░ ░ | follows main with lag 4
TABLE
- it "returns a date such as the number of working days between both work package is equal to the lag" do
+ it "returns the soonest date for which the number of working days between " \
+ "both work packages is equal to the lag" do
set_work_week("monday", "wednesday", "friday")
relation_lag0 = _table.relation(successor: "follower_lag0")
- expect(relation_lag0.successor_soonest_start).to eq(wednesday)
+ expect(relation_lag0.successor_soonest_start).to eq(_table.tuesday)
relation_lag1 = _table.relation(successor: "follower_lag1")
- expect(relation_lag1.successor_soonest_start).to eq(friday)
+ expect(relation_lag1.successor_soonest_start).to eq(_table.thursday) # working day in between is Wednesday
relation_lag2 = _table.relation(successor: "follower_lag2")
- expect(relation_lag2.successor_soonest_start).to eq(monday + 7.days)
+ expect(relation_lag2.successor_soonest_start).to eq(_table.saturday) # working days in between are Wednesday and Friday
relation_lag3 = _table.relation(successor: "follower_lag3")
- expect(relation_lag3.successor_soonest_start).to eq(wednesday + 7.days)
+ expect(relation_lag3.successor_soonest_start).to eq(_table.next_tuesday) # Wednesday, Friday, next Monday
+
+ relation_lag4 = _table.relation(successor: "follower_lag4")
+ expect(relation_lag4.successor_soonest_start).to eq(_table.next_thursday) # Wednesday, Friday, next Monday, next Wednesday
end
end
@@ -261,22 +260,28 @@ RSpec.describe Relation do
follower_lag1 | ░ ░ ░░ ░ | all days | follows main with lag 1
follower_lag2 | ░ ░ ░░ ░ | all days | follows main with lag 2
follower_lag3 | ░ ░ ░░ ░ | all days | follows main with lag 3
+ follower_lag4 | ░ ░ ░░ ░ | all days | follows main with lag 4
TABLE
- it "returns predecessor due_date + lag + 1 (like without non-working days)" do
+ it "returns the soonest date for which the number of working days between " \
+ "both work packages is equal to the lag (saying it another way: it is the same " \
+ "regardless of followers ignoring non-working days or not)" do
set_work_week("monday", "wednesday", "friday")
relation_lag0 = _table.relation(successor: "follower_lag0")
- expect(relation_lag0.successor_soonest_start).to eq(tuesday)
+ expect(relation_lag0.successor_soonest_start).to eq(_table.tuesday)
relation_lag1 = _table.relation(successor: "follower_lag1")
- expect(relation_lag1.successor_soonest_start).to eq(wednesday)
+ expect(relation_lag1.successor_soonest_start).to eq(_table.thursday) # working day in between is Wednesday
relation_lag2 = _table.relation(successor: "follower_lag2")
- expect(relation_lag2.successor_soonest_start).to eq(thursday)
+ expect(relation_lag2.successor_soonest_start).to eq(_table.saturday) # working days in between are Wednesday and Friday
relation_lag3 = _table.relation(successor: "follower_lag3")
- expect(relation_lag3.successor_soonest_start).to eq(friday)
+ expect(relation_lag3.successor_soonest_start).to eq(_table.next_tuesday) # Wednesday, Friday, next Monday
+
+ relation_lag4 = _table.relation(successor: "follower_lag4")
+ expect(relation_lag4.successor_soonest_start).to eq(_table.next_thursday) # Wednesday, Friday, next Monday, next Wednesday
end
end
end
diff --git a/spec/models/work_package/work_package_relations_spec.rb b/spec/models/work_package/work_package_relations_spec.rb
index ca3a9a1ec2b..85fba2b194e 100644
--- a/spec/models/work_package/work_package_relations_spec.rb
+++ b/spec/models/work_package/work_package_relations_spec.rb
@@ -29,6 +29,8 @@
require "spec_helper"
RSpec.describe WorkPackage do
+ create_shared_association_defaults_for_work_package_factory
+
describe "#relation" do
let(:closed_state) do
create(:status,
@@ -124,33 +126,38 @@ RSpec.describe WorkPackage do
describe "#soonest_start" do
let(:predecessor) do
create(:work_package,
+ subject: "predecessor",
due_date: predecessor_due_date)
end
let(:predecessor_due_date) { nil }
let(:successor) do
create(:work_package,
+ subject: "successor",
schedule_manually: successor_schedule_manually,
- project: predecessor.project)
+ ignore_non_working_days: successor_ignore_non_working_days)
end
let(:successor_schedule_manually) { false }
+ let(:successor_ignore_non_working_days) { false }
let(:successor_child) do
create(:work_package,
+ subject: "successor_child",
schedule_manually: successor_child_schedule_manually,
- parent: successor,
- project: predecessor.project)
+ parent: successor)
end
let(:successor_child_schedule_manually) { false }
let(:successor_grandchild) do
create(:work_package,
- parent: successor_child,
- project: predecessor.project)
+ subject: "successor_grandchild",
+ parent: successor_child)
end
let(:relation_successor) do
create(:relation,
from: predecessor,
to: successor,
+ lag: relation_lag,
relation_type: Relation::TYPE_PRECEDES)
end
+ let(:relation_lag) { 0 }
let(:work_packages) { [predecessor, successor, successor_child] }
let(:relations) { [relation_successor] }
@@ -169,22 +176,101 @@ RSpec.describe WorkPackage do
context "with a predecessor" do
let(:work_packages) { [predecessor, successor] }
- context "start date exists in predecessor" do
- let(:predecessor_due_date) { Date.today }
+ context "with a due date" do
+ let(:predecessor_due_date) { Date.current }
- it { expect(successor_child.soonest_start).to eq(predecessor.due_date + 1) }
+ it { expect(successor.soonest_start).to eq(predecessor.due_date + 1) }
end
- context "no date in predecessor" do
- it { expect(successor_child.soonest_start).to be_nil }
+ context "without dates" do
+ it { expect(successor.soonest_start).to be_nil }
+ end
+
+ context "with non-working weekends" do
+ shared_let(:week_days) { week_with_saturday_and_sunday_as_weekend }
+
+ let(:monday) { Date.current.monday }
+ let(:thursday) { monday + 3.days }
+ let(:friday) { monday + 4.days }
+ let(:saturday) { monday + 5.days }
+ let(:next_monday) { monday + 7.days }
+ let(:next_tuesday) { monday + 8.days }
+
+ context "if predecessor ends on Thursday, lag is 2 days " \
+ "and successor has 'Working days only' active" do
+ let(:successor_ignore_non_working_days) { false }
+ let(:relation_lag) { 2 }
+ let(:predecessor_due_date) { thursday }
+
+ it "returns next Tuesday to have 2 working days in between (Friday and Monday) " \
+ "as Saturday and Sunday are non-working days" do
+ expect(successor.soonest_start).to eq(next_tuesday)
+ end
+ end
+
+ context "if predecessor ends on Thursday, lag is 2 days " \
+ "and successor has 'Working days only' inactive" do
+ let(:successor_ignore_non_working_days) { true }
+ let(:relation_lag) { 2 }
+ let(:predecessor_due_date) { thursday }
+
+ it "returns next Tuesday to have 2 working days in between (Friday and Monday)" do
+ expect(successor.soonest_start).to eq(next_tuesday)
+ end
+ end
+
+ context "if predecessor ends on Thursday, lag is 1 day " \
+ "and successor has 'Working days only' active" do
+ let(:successor_ignore_non_working_days) { false }
+ let(:relation_lag) { 1 }
+ let(:predecessor_due_date) { thursday }
+
+ it "returns next Monday to have 1 working day in between (Friday) " \
+ "as Saturday or Sunday are non-working days" do
+ expect(successor.soonest_start).to eq(next_monday)
+ end
+ end
+
+ context "if predecessor ends on Thursday, lag is 1 day " \
+ "and successor has 'Working days only' inactive" do
+ let(:successor_ignore_non_working_days) { true }
+ let(:relation_lag) { 1 }
+ let(:predecessor_due_date) { thursday }
+
+ it "returns Saturday to have 1 working day in between (Friday)" do
+ expect(successor.soonest_start).to eq(saturday)
+ end
+ end
+
+ context "if predecessor ends on Friday, lag is 0 days " \
+ "and successor has 'Working days only' active" do
+ let(:successor_ignore_non_working_days) { false }
+ let(:relation_lag) { 0 }
+ let(:predecessor_due_date) { friday }
+
+ it "returns next Monday as Saturday and Sunday are non-working days" do
+ expect(successor.soonest_start).to eq(next_monday)
+ end
+ end
+
+ context "if predecessor ends on Friday, lag is 0 days " \
+ "and successor has 'Working days only' inactive" do
+ let(:successor_ignore_non_working_days) { true }
+ let(:relation_lag) { 0 }
+ let(:predecessor_due_date) { friday }
+
+ it "returns Saturday" do
+ expect(successor.soonest_start).to eq(saturday)
+ end
+ end
end
end
context "with the parent having a predecessor" do
let(:work_packages) { [predecessor, successor, successor_child] }
- context "start date exists in predecessor" do
- let(:predecessor_due_date) { Date.today }
+ context "with a due date" do
+ let(:predecessor_due_date) { Date.current }
it { expect(successor_child.soonest_start).to eq(predecessor.due_date + 1) }
@@ -195,7 +281,7 @@ RSpec.describe WorkPackage do
end
end
- context "no start date exists in related work packages" do
+ context "without dates" do
it { expect(successor_child.soonest_start).to be_nil }
end
end
@@ -203,8 +289,8 @@ RSpec.describe WorkPackage do
context "with the grandparent having a predecessor" do
let(:work_packages) { [predecessor, successor, successor_child, successor_grandchild] }
- context "start date exists in predecessor" do
- let(:predecessor_due_date) { Date.today }
+ context "with a due date" do
+ let(:predecessor_due_date) { Date.current }
it { expect(successor_grandchild.soonest_start).to eq(predecessor.due_date + 1) }
@@ -221,7 +307,7 @@ RSpec.describe WorkPackage do
end
end
- context "no start date exists in related work packages" do
+ context "without dates" do
it { expect(successor_grandchild.soonest_start).to be_nil }
end
end
@@ -229,8 +315,8 @@ RSpec.describe WorkPackage do
end
describe "#destroy" do
- let(:work_package) { create(:work_package) }
- let(:other_work_package) { create(:work_package) }
+ shared_let(:work_package) { create(:work_package) }
+ shared_let(:other_work_package) { create(:work_package) }
context "for a work package with a relation as to" do
let!(:to_relation) { create(:follows_relation, from: other_work_package, to: work_package) }
diff --git a/spec/services/work_packages/shared/all_days_spec.rb b/spec/services/work_packages/shared/all_days_spec.rb
index 26e3a8a8e86..91117812d2d 100644
--- a/spec/services/work_packages/shared/all_days_spec.rb
+++ b/spec/services/work_packages/shared/all_days_spec.rb
@@ -69,6 +69,8 @@ RSpec.describe WorkPackages::Shared::AllDays do
include_examples "lag computation excluding non-working days"
+ include_examples "add lag to a date"
+
describe "#start_date" do
it "returns the start date for a due date and a duration" do
expect(subject.start_date(sunday_2022_07_31, 1)).to eq(sunday_2022_07_31)
@@ -144,34 +146,16 @@ RSpec.describe WorkPackages::Shared::AllDays do
expect(subject.soonest_working_day(nil)).to be_nil
end
- context "with lag" do
- it "returns the soonest working day from the given day, after a configurable lag of working days" do
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: nil)).to eq(sunday_2022_07_31)
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: 0)).to eq(sunday_2022_07_31)
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: 1)).to eq(Date.new(2022, 8, 1))
- end
- end
-
context "with weekend days (Saturday and Sunday)", :weekend_saturday_sunday do
it "returns the given day" do
expect(subject.soonest_working_day(sunday_2022_07_31)).to eq(sunday_2022_07_31)
end
-
- context "with lag" do
- include_examples "soonest working day with lag", date: Date.new(2022, 1, 1), lag: 30, expected: Date.new(2022, 1, 31)
- end
end
context "with some non working days (Christmas 2022-12-25 and new year's day 2023-01-01)", :christmas_2022_new_year_2023 do
it "returns the given day" do
expect(subject.soonest_working_day(Date.new(2022, 12, 25))).to eq(Date.new(2022, 12, 25))
end
-
- context "with lag" do
- include_examples "soonest working day with lag", date: Date.new(2022, 12, 24),
- lag: 7,
- expected: Date.new(2022, 12, 31)
- end
end
end
end
diff --git a/spec/services/work_packages/shared/shared_examples_days.rb b/spec/services/work_packages/shared/shared_examples_days.rb
index 513107a5fdc..85b4fb56f5c 100644
--- a/spec/services/work_packages/shared/shared_examples_days.rb
+++ b/spec/services/work_packages/shared/shared_examples_days.rb
@@ -71,6 +71,15 @@ RSpec.shared_examples "it returns duration" do |expected_duration, start_date, d
end
end
+RSpec.shared_examples "it adds lag" do |date:, lag:, expected_result:|
+ it "from date #{date.to_fs(:wday_date)} " \
+ "with lag #{lag} " \
+ "=> #{expected_result.to_fs(:wday_date)}" \
+ do
+ expect(subject.add_lag(date, lag)).to eq(expected_result)
+ end
+end
+
RSpec.shared_examples "it returns lag" do |expected_lag, predecessor_date, successor_date|
from_date_format = "%a %-d"
from_date_format += " %b" if [predecessor_date.month, predecessor_date.year] != [successor_date.month, successor_date.year]
@@ -102,12 +111,6 @@ RSpec.shared_examples "soonest working day" do |date:, expected:|
end
end
-RSpec.shared_examples "soonest working day with lag" do |date:, lag:, expected:|
- it "soonest_working_day(#{date.to_fs(:wday_date)}, lag: #{lag.inspect}) => #{expected.to_fs(:wday_date)}" do
- expect(subject.soonest_working_day(date, lag:)).to eq(expected)
- end
-end
-
RSpec.shared_examples "lag computation excluding non-working days" do
describe "#lag" do
sunday_2022_07_31 = Date.new(2022, 7, 31)
@@ -171,3 +174,65 @@ RSpec.shared_examples "lag computation excluding non-working days" do
end
end
end
+
+RSpec.shared_examples "add lag to a date" do
+ describe "#add_lag" do
+ saturday_2022_07_30 = Date.new(2022, 7, 30)
+ sunday_2022_07_31 = Date.new(2022, 7, 31)
+ monday_2022_08_01 = Date.new(2022, 8, 1)
+
+ it "returns the soonest date after the given date where the number of working days in between equals the given lag" do
+ expect(subject.add_lag(sunday_2022_07_31, 0)).to eq(monday_2022_08_01)
+ expect(subject.add_lag(sunday_2022_07_31, 1)).to eq(Date.new(2022, 8, 2))
+ expect(subject.add_lag(sunday_2022_07_31, 5)).to eq(Date.new(2022, 8, 6))
+ expect(subject.add_lag(sunday_2022_07_31, 6)).to eq(Date.new(2022, 8, 7))
+ end
+
+ it "returns the day after the given date when lag is negative (like lag = 0)" do
+ expect(subject.add_lag(sunday_2022_07_31, -100)).to eq(monday_2022_08_01)
+ expect(subject.add_lag(sunday_2022_07_31, -1)).to eq(monday_2022_08_01)
+ expect(subject.add_lag(sunday_2022_07_31, 0)).to eq(monday_2022_08_01)
+ end
+
+ it "works with big lag value like 100_000" do
+ # Ensure implementation is not recursive and won't fail with SystemStackError: stack level too deep
+ expect { subject.add_lag(sunday_2022_07_31, 100_000) }
+ .not_to raise_error
+ end
+
+ context "with weekend days (Saturday and Sunday)", :weekend_saturday_sunday do
+ include_examples "it adds lag", date: saturday_2022_07_30, lag: 0, expected_result: sunday_2022_07_31
+ include_examples "it adds lag", date: saturday_2022_07_30, lag: 1, expected_result: Date.new(2022, 8, 2)
+
+ include_examples "it adds lag", date: sunday_2022_07_31, lag: 0, expected_result: monday_2022_08_01
+ include_examples "it adds lag", date: sunday_2022_07_31, lag: 1, expected_result: Date.new(2022, 8, 2)
+ include_examples "it adds lag", date: sunday_2022_07_31, lag: 4, expected_result: Date.new(2022, 8, 5) # Friday
+ include_examples "it adds lag", date: sunday_2022_07_31, lag: 5, expected_result: Date.new(2022, 8, 6) # Saturday
+ include_examples "it adds lag", date: sunday_2022_07_31, lag: 6, expected_result: Date.new(2022, 8, 9) # Tuesday
+
+ include_examples "it adds lag", date: monday_2022_08_01, lag: 3, expected_result: Date.new(2022, 8, 5) # Friday
+ include_examples "it adds lag", date: monday_2022_08_01, lag: 4, expected_result: Date.new(2022, 8, 6) # Saturday
+ include_examples "it adds lag", date: monday_2022_08_01, lag: 5, expected_result: Date.new(2022, 8, 9) # Tuesday
+ end
+
+ context "with some non working days (Christmas 2022-12-25 and new year's day 2023-01-01)", :christmas_2022_new_year_2023 do
+ include_examples "it adds lag", date: Date.new(2022, 12, 24), lag: 0, expected_result: Date.new(2022, 12, 25)
+ include_examples "it adds lag", date: Date.new(2022, 12, 24), lag: 1, expected_result: Date.new(2022, 12, 27)
+ include_examples "it adds lag", date: Date.new(2022, 12, 24), lag: 6, expected_result: Date.new(2023, 1, 1)
+ include_examples "it adds lag", date: Date.new(2022, 12, 24), lag: 7, expected_result: Date.new(2023, 1, 3)
+ end
+
+ context "with nil date" do
+ it "returns nil" do
+ expect(subject.add_lag(nil, 5)).to be_nil
+ end
+ end
+
+ context "with nil lag" do
+ it "returns the day after the given date when lag is nil (like lag = 0)" do
+ expect(subject.add_lag(sunday_2022_07_31, nil)).to eq(monday_2022_08_01)
+ expect(subject.add_lag(sunday_2022_07_31, 0)).to eq(monday_2022_08_01)
+ end
+ end
+ end
+end
diff --git a/spec/services/work_packages/shared/working_days_spec.rb b/spec/services/work_packages/shared/working_days_spec.rb
index e3c2d5e1feb..92019b14d1b 100644
--- a/spec/services/work_packages/shared/working_days_spec.rb
+++ b/spec/services/work_packages/shared/working_days_spec.rb
@@ -93,6 +93,8 @@ RSpec.describe WorkPackages::Shared::WorkingDays do
include_examples "lag computation excluding non-working days"
+ include_examples "add lag to a date"
+
describe "#start_date" do
it "returns the start date for a due date and a duration" do
expect(subject.start_date(monday_2022_08_01, 1)).to eq(monday_2022_08_01)
@@ -190,49 +192,17 @@ RSpec.describe WorkPackages::Shared::WorkingDays do
expect(subject.soonest_working_day(nil)).to be_nil
end
- context "with lag" do
- it "returns the soonest working day from the given day, after a configurable lag of working days" do
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: nil)).to eq(sunday_2022_07_31)
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: 0)).to eq(sunday_2022_07_31)
- expect(subject.soonest_working_day(sunday_2022_07_31, lag: 1)).to eq(monday_2022_08_01)
- end
-
- it "works with big lag value like 100_000" do
- # First implementation was recursive and failed with SystemStackError: stack level too deep
- expect { subject.soonest_working_day(sunday_2022_07_31, lag: 100_000) }
- .not_to raise_error
- end
- end
-
context "with weekend days (Saturday and Sunday)", :weekend_saturday_sunday do
include_examples "soonest working day", date: friday_2022_07_29, expected: friday_2022_07_29
include_examples "soonest working day", date: saturday_2022_07_30, expected: monday_2022_08_01
include_examples "soonest working day", date: sunday_2022_07_31, expected: monday_2022_08_01
include_examples "soonest working day", date: monday_2022_08_01, expected: monday_2022_08_01
-
- context "with lag" do
- include_examples "soonest working day with lag", date: friday_2022_07_29, lag: 0, expected: friday_2022_07_29
- include_examples "soonest working day with lag", date: saturday_2022_07_30, lag: 0, expected: monday_2022_08_01
- include_examples "soonest working day with lag", date: sunday_2022_07_31, lag: 0, expected: monday_2022_08_01
- include_examples "soonest working day with lag", date: monday_2022_08_01, lag: 0, expected: monday_2022_08_01
-
- include_examples "soonest working day with lag", date: friday_2022_07_29, lag: 1, expected: monday_2022_08_01
- include_examples "soonest working day with lag", date: saturday_2022_07_30, lag: 1, expected: Date.new(2022, 8, 2)
- include_examples "soonest working day with lag", date: sunday_2022_07_31, lag: 1, expected: Date.new(2022, 8, 2)
- include_examples "soonest working day with lag", date: monday_2022_08_01, lag: 1, expected: Date.new(2022, 8, 2)
-
- include_examples "soonest working day with lag", date: friday_2022_07_29, lag: 8, expected: Date.new(2022, 8, 10)
- end
end
context "with some non working days (Christmas 2022-12-25 and new year's day 2023-01-01)", :christmas_2022_new_year_2023 do
include_examples "soonest working day", date: Date.new(2022, 12, 25), expected: Date.new(2022, 12, 26)
include_examples "soonest working day", date: Date.new(2022, 12, 31), expected: Date.new(2022, 12, 31)
include_examples "soonest working day", date: Date.new(2023, 1, 1), expected: Date.new(2023, 1, 2)
-
- context "with lag" do
- include_examples "soonest working day with lag", date: Date.new(2022, 12, 24), lag: 7, expected: Date.new(2023, 1, 2)
- end
end
context "with no working days", :no_working_days do
diff --git a/spec/services/work_packages/update_service_integration_spec.rb b/spec/services/work_packages/update_service_integration_spec.rb
index a3f54355662..8529ccd28a3 100644
--- a/spec/services/work_packages/update_service_integration_spec.rb
+++ b/spec/services/work_packages/update_service_integration_spec.rb
@@ -1301,6 +1301,85 @@ RSpec.describe WorkPackages::UpdateService, "integration", type: :model do
end
end
+ describe "due_date and ignore_non_working_days combinations" do
+ before do
+ set_non_working_week_days("saturday", "sunday")
+ end
+
+ context "on an automatically scheduled successor whose start date is after a non-working day" do
+ shared_let_work_packages(<<~TABLE)
+ | subject | MTWTFSSmtwtfss | scheduling mode | days counting | successors
+ | predecessor | XX | manual | working days only | work_package with lag 1
+ | work_package | XXX | automatic | working days only |
+ TABLE
+
+ context "when setting ignore_non_working_days to true" do
+ let(:attributes) { { ignore_non_working_days: true } }
+
+ it "moves the start date earlier to start on a non-working day " \
+ "and moves the due date too to keep same duration" do
+ expect(subject).to be_success
+
+ expect_work_packages_after_reload([work_package, predecessor], <<~TABLE)
+ | subject | MTWTFSSmtwtfss | scheduling mode | days counting
+ | predecessor | XX | manual | working days only
+ | work_package | XXX | automatic | all days
+ TABLE
+ end
+ end
+
+ context "when setting ignore_non_working_days to true and setting a due date" do
+ let(:attributes) { { ignore_non_working_days: true, due_date: _table.next_friday } }
+
+ it "moves the start date earlier to start on a non-working day and uses the given due date" do
+ expect(subject).to be_success
+
+ expect_work_packages_after_reload([work_package, predecessor], <<~TABLE)
+ | subject | MTWTFSSmtwtfss | scheduling mode | days counting
+ | predecessor | XX | manual | working days only
+ | work_package | XXXXXXX | automatic | all days
+ TABLE
+ end
+ end
+
+ context "when setting ignore_non_working_days to true and unsetting the due date" do
+ let(:attributes) { { ignore_non_working_days: true, due_date: nil } }
+
+ it "moves the start date earlier to start on a non-working day and removes the due date and duration" do
+ expect(subject).to be_success
+
+ expect_work_packages_after_reload([work_package, predecessor], <<~TABLE)
+ | subject | MTWTFSSmtwtfss | duration | scheduling mode | days counting
+ | predecessor | XX | 2 | manual | working days only
+ | work_package | [ | | automatic | all days
+ TABLE
+ end
+ end
+ end
+
+ context "on an automatically scheduled successor whose start and due dates are on non-working days " \
+ "when setting only ignore_non_working_days to false" do
+ let_work_packages(<<~TABLE)
+ | subject | MTWTFSSmtwtfss | duration | scheduling mode | days counting | successors
+ | predecessor | XX | 2 | manual | working days only | work_package with lag 1
+ | work_package | XXXXXXXX | 8 | automatic | all days |
+ TABLE
+
+ let(:attributes) { { ignore_non_working_days: false } }
+
+ it "moves the start date earlier to start on a non-working day " \
+ "and moves the due date too to keep same duration" do
+ expect(subject).to be_success
+
+ expect_work_packages_after_reload([work_package, predecessor], <<~TABLE)
+ | subject | MTWTFSSmtwtfss | duration | scheduling mode | days counting
+ | predecessor | XX | 2 | manual | working days only
+ | work_package | XXXXX..XXX | 8 | automatic | working days only
+ TABLE
+ end
+ end
+ end
+
context "when changing the type of a work package with children into a milestone" do
let_work_packages(<<~TABLE)
| hierarchy | MTWTFSS | scheduling mode
diff --git a/spec/support/table_helpers/table.rb b/spec/support/table_helpers/table.rb
index 059c6a7f1f1..2b4becf09bc 100644
--- a/spec/support/table_helpers/table.rb
+++ b/spec/support/table_helpers/table.rb
@@ -72,6 +72,13 @@ module TableHelpers
def friday = monday + 4.days
def saturday = monday + 5.days
def sunday = monday + 6.days
+ def next_monday = monday + 7.days
+ def next_tuesday = monday + 8.days
+ def next_wednesday = monday + 9.days
+ def next_thursday = monday + 10.days
+ def next_friday = monday + 11.days
+ def next_saturday = monday + 12.days
+ def next_sunday = monday + 13.days
private
diff --git a/spec/support/time_helpers.rb b/spec/support/time_helpers.rb
index 12c0eb90310..610ba88cf00 100644
--- a/spec/support/time_helpers.rb
+++ b/spec/support/time_helpers.rb
@@ -47,3 +47,17 @@ RSpec::Matchers.define :equal_time_without_usec do |expected|
expected_without_usec == actual_without_usec
end
end
+
+RSpec.shared_context "with default browser timezone" do
+ let(:_comment) do
+ "This context does not try to override the browser timezone. " \
+ "It will be the same as the system (positive offset for European devs, UTC for CI, etc.)."
+ end
+end
+
+RSpec.shared_context "with a negative browser timezone (New York)", driver: :chrome_new_york_time_zone do
+ let(:_comment) do
+ "This context overrides browser timezone to be America/New_York. " \
+ "Timezone offset is -4/-5 hours (EDT/EST)."
+ end
+end