OpenProject is the leading open source project management software for product, project and portfolio management. A powerful Jira alternative with agile planning, issue tracking, roadmaps, Gantt charts, time tracking, collaboration features, and more. Available on premises or in the cloud. ⭐ Star us on GitHub

[#55487] 14.2 Documentation: Progress reporting changes https://comm… (#15835)

Maya Berdygylyjova7890c6427cfb
diff --git a/docs/release-notes/12/12-3-0/README.md b/docs/release-notes/12/12-3-0/README.md
index d489cf0b457..72a4e2565c3 100644
--- a/docs/release-notes/12/12-3-0/README.md
+++ b/docs/release-notes/12/12-3-0/README.md
@@ -14,7 +14,7 @@ We have now released [OpenProject 12.3.0](https://community.openproject.org/vers
This release **improves the scheduling of work packages significantly** and will consequently save you a lot of time and make your scheduling more accurate.
-With OpenProject 12.3, administrators can define the [global work week](../../../system-admin-guide/calendars-and-dates/#working-days). That means which days of the week are working days and which are non-working days. The default setting for the work week is Monday-Friday. But you can set it according to your needs and define work week and weekends as needed.
+With OpenProject 12.3, administrators can define the [global work week](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours). That means which days of the week are working days and which are non-working days. The default setting for the work week is Monday-Friday. But you can set it according to your needs and define work week and weekends as needed.
OpenProject 12.3 also adds [duration](../../../user-guide/work-packages/set-change-dates/#duration) to work packages. Thereby, the duration is bound to the start and the finish date.
@@ -32,7 +32,7 @@ This helps you to create more accurate project schedules and avoid having start
![work-week-administration](work-week-administration.png)
-You can find out [how to set working and non-working days](../../../system-admin-guide/calendars-and-dates/#working-days) and [how to schedule your work packages within and without working and non-working days](../../../user-guide/work-packages/set-change-dates/#working-days) in our documentation.
+You can find out [how to set working and non-working days](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours) and [how to schedule your work packages within and without working and non-working days](../../../user-guide/work-packages/set-change-dates/#working-days) in our documentation.
## Duration of work packages
@@ -66,7 +66,7 @@ These changes to scheduling will not impact work packages created before the rel
## Tool tips for most essential actions
-The new and additional tool tips in the OpenProject application will make the navigation easier for users that are not yet very familiar with OpenProject. The tool tips make clear what happens when the user clicks on a certain button.
+The new and additional tool tips in the OpenProject application will make the navigation easier for users that are not yet very familiar with OpenProject. The tool tips make clear what happens when the user clicks on a certain button.
![hover over select a project and tool tip view all projects comes up](tool-tip.png)
diff --git a/docs/system-admin-guide/calendars-and-dates/README.md b/docs/system-admin-guide/calendars-and-dates/README.md
index 2b8c91f12f0..b2526574d5b 100644
--- a/docs/system-admin-guide/calendars-and-dates/README.md
+++ b/docs/system-admin-guide/calendars-and-dates/README.md
@@ -13,19 +13,19 @@ Navigate to **Administration → Calendar and dates**.
| Topic | Content |
| ------------------------------------------------- | ------------------------------------------------------------ |
-| [Working days](#working-days) | Define which days of the week are considered working days for scheduling and calculation of duration. |
+| [Working days](#working-days-and-hours) | Define which days of the week are considered working days for scheduling and calculation of duration. |
| [Date format](#date-format) | Change time and date formats. |
| [Calendar subscriptions](#calendar-subscriptions) | Allow users to subscribe to calendars. |
-## Working days
+## Working days and hours
-Administrators are able to define which days of the week are considered working days at an instance level. In other words, this setting defines what OpenProject should consider to be a normal work week when scheduling work packages.
+Administrators are able to define how many hours are considered a day and which days of the week are considered working days at an instance level. In other words, this setting defines what OpenProject should consider to be a normal work week when scheduling work packages.
To change this setting, navigate to **Working days** inside of the **Calendar and dates** settings.
-> **Note:** By default, the five days from Monday–Friday are considered working days, and Saturday and Sunday are considered non-working days.
+> **Note:** By default, a working day is considered to have 8 hours, the five days from Monday–Friday are considered working days, and Saturday and Sunday are considered non-working days.
-![The 'Working days' entry in Calendar and dates settings ](admin-working-days.png)
+![The 'Working days' entry in Calendar and dates settings ](admin-working-days-hours.png)
To change this setting, unselect days that you would like to define as non-working, and select ones that you would like to consider working, and click on **Save**.
diff --git a/docs/system-admin-guide/calendars-and-dates/add-non-working-day-link.png b/docs/system-admin-guide/calendars-and-dates/add-non-working-day-link.png
index 92bfdfa1dd9..203fb916855 100644
Binary files a/docs/system-admin-guide/calendars-and-dates/add-non-working-day-link.png and b/docs/system-admin-guide/calendars-and-dates/add-non-working-day-link.png differ
diff --git a/docs/system-admin-guide/calendars-and-dates/add-working-day-modal.png b/docs/system-admin-guide/calendars-and-dates/add-working-day-modal.png
index f74dc18bb1c..502d9a9ab9b 100644
Binary files a/docs/system-admin-guide/calendars-and-dates/add-working-day-modal.png and b/docs/system-admin-guide/calendars-and-dates/add-working-day-modal.png differ
diff --git a/docs/system-admin-guide/calendars-and-dates/admin-working-days-hours.png b/docs/system-admin-guide/calendars-and-dates/admin-working-days-hours.png
new file mode 100644
index 00000000000..16ded6ea4fb
Binary files /dev/null and b/docs/system-admin-guide/calendars-and-dates/admin-working-days-hours.png differ
diff --git a/docs/system-admin-guide/calendars-and-dates/admin-working-days.png b/docs/system-admin-guide/calendars-and-dates/admin-working-days.png
deleted file mode 100644
index 68297588281..00000000000
Binary files a/docs/system-admin-guide/calendars-and-dates/admin-working-days.png and /dev/null differ
diff --git a/docs/system-admin-guide/calendars-and-dates/apply-changes-button.png b/docs/system-admin-guide/calendars-and-dates/apply-changes-button.png
index e413735b3e4..9223f0af7ec 100644
Binary files a/docs/system-admin-guide/calendars-and-dates/apply-changes-button.png and b/docs/system-admin-guide/calendars-and-dates/apply-changes-button.png differ
diff --git a/docs/system-admin-guide/calendars-and-dates/calendar-subscriptions.png b/docs/system-admin-guide/calendars-and-dates/calendar-subscriptions.png
index ee1a0c9c038..68e6b5289c6 100644
Binary files a/docs/system-admin-guide/calendars-and-dates/calendar-subscriptions.png and b/docs/system-admin-guide/calendars-and-dates/calendar-subscriptions.png differ
diff --git a/docs/system-admin-guide/calendars-and-dates/date-format.png b/docs/system-admin-guide/calendars-and-dates/date-format.png
index 117a1c01e9f..ad371ee03fa 100644
Binary files a/docs/system-admin-guide/calendars-and-dates/date-format.png and b/docs/system-admin-guide/calendars-and-dates/date-format.png differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md b/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
index bdea07bf069..b0db49938d8 100644
--- a/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
+++ b/docs/system-admin-guide/manage-work-packages/work-package-settings/README.md
@@ -9,6 +9,8 @@ keywords: work package settings, work package configuration
To change basic settings for work package tracking in OpenProject, navigate to **Administration → Work packages → Settings**.
+![work-package-settings-administration](openproject_system_guide_work_package_settings.png)
+
You can adjust the following:
1. **Allow cross-project work package relations**, i.e. that work packages created in one project can have relations to work packages in another project, for example parent-children work packages.
@@ -19,14 +21,23 @@ You can adjust the following:
4. **Progress calculation** lets you pick between two modes for how the **% Complete** field is calculated for work packages.
- **Work-based**: % Complete is automatically calculated based on Work and Remaining work values for that work package, both of which are then necessary to have a value for % Complete.
+
- **Status-based**: you will have to define fixed % Complete values for each [work package status](../work-package-status), which will update automatically when team members update the status of their work packages.
+ > **Note**: When switching progress calculation mode from one to another, you will see a warning message.
+ >
+ > - Changing progress calculation mode from work-based to status-based will result in all existing *% Complete* values to be lost and replaced with values associated with each status. Existing values for *Remaining work* may also be recalculated to reflect this change. This action is not reversible.
+ >
+ > - Changing progress calculation mode from status-based to work-based will make % Complete a non-editable field whose value is derived from Work and Remaining work. Existing values for % Complete are preserved. If values for Work and Remaining work were not present, they will be required in order to change % Complete.
+
+ ![Warning message when changing progress calculation mode in OpenProject administration](openproject_system_guide_work_package_settings_warning.png)
+
+
+
5. **Default highlighting mode** (Enterprise add-on) defines which should be the default [attribute highlighting](../../../user-guide/work-packages/work-package-table-configuration/#attribute-highlighting-enterprise-add-on) mode, e.g. to highlight the following criteria in the work package table. This setting is only available for Enterprise on-premises and Enterprise cloud users.
![default highlighting mode](openproject_system_guide_default_highlighting_mode.png)
6. Customize the appearance of the work package lists to **define which work package attributes are displayed in the work package lists by default and in what order**.
-Do not forget to save your changes with the blue **Save** button at the bottom.
-
-![work-package-settings-administration](openproject_system_guide_work_package_settings.png)
+Do not forget to save your changes with the green **Save** button at the bottom.
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-settings/openproject_system_guide_work_package_settings_warning.png b/docs/system-admin-guide/manage-work-packages/work-package-settings/openproject_system_guide_work_package_settings_warning.png
new file mode 100644
index 00000000000..c2363be8bd2
Binary files /dev/null and b/docs/system-admin-guide/manage-work-packages/work-package-settings/openproject_system_guide_work_package_settings_warning.png differ
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/README.md b/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
index 1894a91ab8a..18df00bec3f 100644
--- a/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
+++ b/docs/system-admin-guide/manage-work-packages/work-package-status/README.md
@@ -26,11 +26,10 @@ A new window will open, where you will be able to specify the following:
3. Define if the new work package status closes a work package (e.g. relevant when filtering for closed for packages), e.g. a work package status "rejected" will set a work package technically on closed and it will not appear in the default work package table with Open Work packages.
4. Define if this status is set as default value when creating new work packages. BEWARE: If you decide to set the new status as default it will impact all work packages, existing and future ones. See more below.
5. Check if this status sets a **work package in read-only mode**. This means no work package attributes can be changed except the status.
-6. Set a **color** for the work package status. The color appears in the status button of the work packages or in the work package table.
-<!--
-7. Check **Exclude from calculation of totals in hierarchy** if you do not want work packages with this status to *not* be included in the calculation of sums in a hierarchy. This is useful for statuses like *closed* or *rejected*.
--->
-Save the new status by clicking **Create**.
+6. Check **Exclude from calculation of totals in hierarchy** if you want work packages with this status to *not* be included in the calculation of totals in a hierarchy. This is useful for statuses like *rejected*.
+7. Set a **color** for the work package status. The color appears in the status button of the work packages or in the work package table.
+
+ Save the new status by clicking **Create**.
![Create a new work package status in OpenProject administration](openproject_system_guide_create_new_wp_status.png)
diff --git a/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png
index 13410457278..c375d28956f 100644
Binary files a/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png and b/docs/system-admin-guide/manage-work-packages/work-package-status/openproject_system_guide_create_new_wp_status.png differ
diff --git a/docs/user-guide/calendar/README.md b/docs/user-guide/calendar/README.md
index 945ee4e00b5..3c498eb0345 100644
--- a/docs/user-guide/calendar/README.md
+++ b/docs/user-guide/calendar/README.md
@@ -11,7 +11,7 @@ keywords: calendar, ical, month, week, view
The Calendar module gives you an overview of work packages scheduled in a particular month or week. This makes it easier to track and follow multiple parallel tasks and get a sense of how a project will evolve (or has evolved) over time.
-You must first enable the Calendar module in your [project settings](../projects/project-settings/ "Link to documentation on project settings") to use it.
+You must first enable the Calendar module in your [project settings](../projects/project-settings/modules) to use it.
| Topic | Content |
| --------------------------------------------------- | ------------------------------------------------------------ |
diff --git a/docs/user-guide/calendar/calendar-faq/README.md b/docs/user-guide/calendar/calendar-faq/README.md
index 4e7d9c6bfc7..23bbe91ceb1 100644
--- a/docs/user-guide/calendar/calendar-faq/README.md
+++ b/docs/user-guide/calendar/calendar-faq/README.md
@@ -24,7 +24,7 @@ You can also use the meeting module in OpenProject to organize meetings and invi
## Are holidays considered in the calendar?
-Since the [12.3 release](../../../release-notes/12/12-3-0/) it is possible to specify working and non-working days on an overall instance-level and consequently define a global work week. The default value for non-working days is set to Saturday and Sunday, but can be adjusted to your specific needs. Read more [here](../../../user-guide/work-packages/set-change-dates/#working-days).
+Since the [12.3 release](../../../release-notes/12/12-3-0/) it is possible to specify working and non-working days on an overall instance-level and consequently define a global work week. The default value for non-working days is set to Saturday and Sunday, but can be adjusted to your specific needs. Read more [here](../../../user-guide/work-packages/set-change-dates/#working-days).
## Is there a limit for the number of work packages displayed in the calendar?
diff --git a/docs/user-guide/team-planner/README.md b/docs/user-guide/team-planner/README.md
index ff00bd9c9db..ef3e9934b2e 100644
--- a/docs/user-guide/team-planner/README.md
+++ b/docs/user-guide/team-planner/README.md
@@ -55,7 +55,7 @@ A team planner has a number of features numbered 1 to 8 in the above screenshot:
5. Use the **Filter** feature (same as in the [work packages](../work-packages/work-package-table-configuration/#filter-work-packages) module) to display only work packages that meet certain filter criteria. You could, for example, filter such that only work packages of certain types, certain status or certain custom field values are visible.
6. The **Fullscreen** button lets you view the team planner in fullscreen mode.
7. The **\[⋮\]** (more) button gives you additional options, such as saving, renaming and saving a copy (saving as), or deleting the team planner. This is also where you can modify the visibility options.
-8. By default the team planner only shows the [work week](../../system-admin-guide/calendars-and-dates/#working-days) (week excluding the weekend and non-working days). Use the drop down to toggle between work week, 1-week, 2-week, 4-week or 8-week views. With the arrows you can navigate the weeks back and forth. The Today button brings you to the current week.
+8. By default the team planner only shows the [work week](../../system-admin-guide/calendars-and-dates/#working-days-and-hours) (week excluding the weekend and non-working days). Use the drop down to toggle between work week, 1-week, 2-week, 4-week or 8-week views. With the arrows you can navigate the weeks back and forth. The Today button brings you to the current week.
> **Note**: The team planner will highlight non-working days in the calendar with a darker background color. By default, a work package cannot be dragged or resized such that it begins or ends on these days unless the "Working days only" switch is turned off for that work package. To learn how to do this, refer to the documentation on [Working days and duration](../work-packages/set-change-dates/#working-days-and-duration).
diff --git a/docs/user-guide/time-and-costs/progress-tracking/README.md b/docs/user-guide/time-and-costs/progress-tracking/README.md
index c8bfb2a4f04..b222f825cf2 100644
--- a/docs/user-guide/time-and-costs/progress-tracking/README.md
+++ b/docs/user-guide/time-and-costs/progress-tracking/README.md
@@ -2,7 +2,7 @@
sidebar_navigation:
title: Progress tracking
priority: 800
-description: How to use OpenProject to track and report progress of work packages in either work-based or status-based reporting modes.
+description: How to use OpenProject to track and report progress of work packages in either work-based or status-based reporting modes.
keywords: Progress tracking, estimated time, remaining time, work, % complete, percentage complete, remaining work
---
@@ -24,6 +24,26 @@ OpenProject lets you track and monitor the progress of your work packages.
>**Note**: You will still find the new attributes if you search using their older names (in the list of filters, for example).
+## Units of measurement
+
+[OpenProject 14.2](../../../release-notes/14-2-0/) transformed the measurement units of Work and Remaining Work from hours to **days and hours**. This allows you to input values for Work and Remaining work in different units. See the examples below:
+
+- Valid inputs for 2 hours and 30 minutes:
+
+ - "2.5"
+ - "2.5h"
+ - "2h 30m"
+ - "2 hours 30 minutes"
+
+- Valid inputs for 6 days:
+
+ - "48"
+ - "48 hour"
+ - "6d 0h"
+ - "6 days"
+
+The default setting is set to be 8 hours per day. Your administrator can change [how many hours are considered a day](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours).
+
## Progress reporting modes
OpenProject offers two modes for reporting progress:
@@ -41,7 +61,7 @@ OpenProject offers two modes for reporting progress:
This means that for a work package to have a value for %&nbsp;Complete, both Work and Remaining work are required to be set. To make this link clear and transparent, clicking on *Work* or *Remaining work* to modify them will display the following pop-over:
-![Work estimates and progress pop-over with work-based progress reporting](progress-popover-work-based.png)
+![Work estimates and progress pop-over with work-based progress reporting](progress-popover-work-based-days.png)
This allows you to edit Work or Remaining work and get a preview of the updated %&nbsp;Complete value before saving changes. Changing any one field will automatically update the other two.
@@ -61,7 +81,7 @@ Unlike in work-based progress reporting mode, in status-based mode, Remaining wo
>**Remaining work** is **Work** times **(100% - %&nbsp;Complete)**, expressed in hours. For example, if the %&nbsp;Complete for a selected status is 50% and Work is 10h, Remaining work is automatically set to 5h.
-![Work estimates and progress pop-over with status-based progress reporting](progress-popover-status-based.png)
+![Work estimates and progress pop-over with status-based progress reporting](progress-popover-status-based-days.png)
In Status-based progress reporting mode, Work is not a required value. However, if Work is set, Remaining work is automatically calculated. To make this link clear and transparent, clicking on the value for Work will display the following pop-over:
@@ -73,19 +93,17 @@ This allows you to edit %&nbsp;Complete (by changing status) or Work and get a p
OpenProject will automatically show totals for Work, Remaining work and % Complete in a work package hierarchy (any parent with children). These appear in a work package table as a number with a Σ sign next to it, indicating that it is a total of the values of the parent _and_ children.
-![Hierarchy totals for Work, Remaining work and % Complete](hierarchy-totals.png)
+![Hierarchy totals for Work, Remaining work and % Complete](hierarchy-totals-days.png)
> **Note**: The total %&nbsp;Complete value of a hierarchy is a weighted average tied to Work. For example, a feature with Work set to 50h that is 30% done will influence the total of %&nbsp;Complete of the parent more than a feature with Work set to 5h that is 70% done.
-<!--
### Excluding certain work packages from totals
-In some cases, you might want to exclude certain work packages (like those with status *rejected*) from total calculations of the parent. Administrators can define these exclusions by going to the [Administration settings for any status] and check a new option called "Exclude from calculation of totals in hierarchy". All work packages with this status will then be excluded when calculating the total value for the parent (for all fields: Work, Remaining work and %&nbsp;Complete).
+In some cases, you might want to exclude certain work packages (like those with status *rejected*) from total calculations of the parent. Administrators can define these exclusions by going to the [Administration settings for any status](../../../system-admin-guide/manage-work-packages/work-package-settings/) and check a new option called "Exclude from calculation of totals in hierarchy". All work packages with this status will then be excluded when calculating the total value for the parent (for all fields: Work, Remaining work and %&nbsp;Complete).
A small info icon will appear next to excluded values to remind you of this fact:
-![Warning that a work package type is excluded from hierarchy totals](progress-work-estimates-excludedFromParent.png)
--->
+![Warning that a work package type is excluded from hierarchy totals](progress-work-estimates-excludedFromParent-days.png)
## Changing modes
diff --git a/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals-days.png b/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals-days.png
new file mode 100644
index 00000000000..d181bb2d173
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals-days.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png b/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png
deleted file mode 100644
index 5652968a745..00000000000
Binary files a/docs/user-guide/time-and-costs/progress-tracking/hierarchy-totals.png and /dev/null differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png
index c57bea40aa6..39d4a88f36f 100644
Binary files a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-percentage-complete-only.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based-days.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based-days.png
new file mode 100644
index 00000000000..9d5e295d298
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based-days.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png
deleted file mode 100644
index c6e6bc1f9dc..00000000000
Binary files a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-status-based.png and /dev/null differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based-days.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based-days.png
new file mode 100644
index 00000000000..f8d73fff847
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based-days.png differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png b/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png
deleted file mode 100644
index 5815ca4d6d3..00000000000
Binary files a/docs/user-guide/time-and-costs/progress-tracking/progress-popover-work-based.png and /dev/null differ
diff --git a/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent-days.png b/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent-days.png
new file mode 100644
index 00000000000..e78edad3b08
Binary files /dev/null and b/docs/user-guide/time-and-costs/progress-tracking/progress-work-estimates-excludedFromParent-days.png differ
diff --git a/docs/user-guide/work-packages/set-change-dates/README.md b/docs/user-guide/work-packages/set-change-dates/README.md
index f138f74395f..b64f0988d81 100644
--- a/docs/user-guide/work-packages/set-change-dates/README.md
+++ b/docs/user-guide/work-packages/set-change-dates/README.md
@@ -83,7 +83,7 @@ Certain work package types (such as Milestones) can only span one day and thus h
Starting with OpenProject 12.3, it is possible to manually input a duration for a work package and decide whether this duration should include working days only or all calendar days.
-> **Note:** Working dates are currently defined by the administrator of your OpenProject instance. By default, they are Monday to Friday, with Saturday and Sunday considered non-working. If you are an administrator, please read our [admin guide on working days](../../../system-admin-guide/calendars-and-dates/#working-days)
+> **Note:** Working dates are currently defined by the administrator of your OpenProject instance. By default, they are Monday to Friday, with Saturday and Sunday considered non-working. If you are an administrator, please read our [admin guide on working days](../../../system-admin-guide/calendars-and-dates/#working-days-and-hours).
>
> **When upgrading to 12.3 from a previous version:** Please note that this switch will be set to ***off*** for all existing work packages so as to preserve start and finish dates. However, the switch will be ***on*** by default for new work packages.