Skip to content

:hedgehog: PostHog is the leading platform for building self-driving products. Our developer tools – AI observability, analytics, session replay, flags, experiments, error tracking, logs, and more – capture all the context agents need to diagnose problems, uncover opportunities, and ship fixes. Steer it all from Slack, web, desktop, or the MCP.

chore(growth): drop stale durations from product push dag docstring (#99276)

Rafael Audibertd3ca6a0155f3
diff --git a/products/growth/dags/product_push_campaigns.py b/products/growth/dags/product_push_campaigns.py
index 9e59d603627c..d9ffc9f11c25 100644
--- a/products/growth/dags/product_push_campaigns.py
+++ b/products/growth/dags/product_push_campaigns.py
@@ -3,14 +3,14 @@
Two sequenced phases:
1. Close — evaluate every ACTIVE campaign: close as adopted when the org started
- using the product, as skipped when the 14-day window expired without adoption.
+ using the product, as skipped when its push window expired without adoption.
2. Start — start the next campaign for every eligible org (past the signup grace
period, no active campaign, out of the between-campaigns cooldown, or holding a
due dated TAM pin).
The start phase depends on the collected close results so a campaign that expires
-today frees its org for cadence evaluation in the same run (the cooldown then
-keeps it quiet for 7 days).
+today frees its org for cadence evaluation in the same run (the between-campaigns
+cooldown then keeps it quiet for COOLDOWN_DAYS).
All business logic lives in products/growth/backend/product_push/; this file only
orchestrates. Rollout controls (`rollout_percentage`, `max_starts`, `dry_run`)