Open Source Platform for DTC, B2B Commerce, Marketplaces & Omnichannel. REST APIs, TypeScript SDKs, and production-ready Next.js storefront. Self-host it. Own your data. No vendor lock-in. Zero platform fees.
description: Cut a Spree release — audit, version bump, release notes, pull request, then tags and the GitHub release (automatic for a patch, printed for a human otherwise), the spree-starter bump and the storefront SDK bump.
Cut the Spree release named in the arguments: 6.0.2, 6.1.0 or a
prerelease such as 6.1.0.rc1 (gem spelling). With no argument, propose the
next patch of Spree::VERSION and confirm it.
Version: $ARGUMENTS
Releases are published by .github/workflows/release.yml from tags pushed on a
commit already on main; .changeset/README.md has the mechanics. This command
wraps them with the review a release needs. Run the phases in order. Phase 5
pushes the tags and creates the GitHub release itself for a patch release
(X.Y.Z with Z above zero and no prerelease label); for a minor, major or
prerelease it only prints the commands, and a human runs them. Phases 6 and 7
bump spree-starter and the storefront once the gems and packages are
published. All three need the pull request merged, so the command usually
stops after phase 4 and is run again to publish.
Work on a branch named chore/release-<version> with the workspace installed
(node_modules present), never on main.
1. Audit what ships
Run git fetch origin --tags first. The last Spree tag is git describe --tags --abbrev=0 --match 'v*' origin/main and its date is git log -1 --format=%cI <tag>. List the commits since it with git log --format='%h %an %s' <tag>..origin/main. A commit merged through a pull request ends in
(#1234); fetch all of those in one call, gh pr list --state merged --base main --search "merged:>=<tag date>" --limit 200 --json number,title,author,body, and keep the numbers the log names. Fetch any
number the log names but the list misses (the list stops at 200) with gh pr view <n> --repo spree/spree --json number,title,author,body. A commit with
no number was pushed straight to main: it stays in the list with its author
and is linked by commit instead. Strip CodeRabbit and "Generated by" trailers
from the bodies. These feed the release notes in phase 3.
Then check the diff since the tag for anything that does not fit the release type, and list each item for the user before bumping:
- Migrations: new files under
spree/*/db/migrate/, and any edit to a migration that has already shipped (apps that ran it will not run it again). - Gemspec and
package.jsondependency changes: a major bump or a removed runtime dependency breaks apps that relied on it.bundle update --conservativecannot follow a dependency major. - Public API and component changes marked as
patchin.changeset/: removed props, renamed fields, anything a plugin or SDK user could call. - Generated artifacts left behind: a serializer change without its
docs/api-reference/*.yamlregeneration, SDK types out of date. - Open pull requests by the user that are green and could ride along.
A patch release carries only patch changesets for the packages in the
fixed group. If one of those names minor or major, either downgrade it
with the user's agreement (6.0.1 did this) or stop and propose a minor release
instead. @spree/cli and create-spree-app keep their own versions, so their
changesets may name any bump.
Decide the tool releases: @spree/cli and create-spree-app ship only when
git log <their last tag>..origin/main -- packages/<dir> names a change to
what the package publishes (its source, binaries, templates or dependencies;
not tests, lint or repository files), where the tag is git describe --tags --abbrev=0 --match '@spree/cli@*' origin/main (or create-spree-app@*).
Every such change needs a changeset; add one if a commit forgot it. A tool
with no such change keeps its version and gets no tag.
Confirm CI is green on origin/main HEAD: gh run list --branch main --limit 6.
2. Bump
- Set
Spree::VERSIONinspree/core/lib/spree/core/version.rb. GITHUB_TOKEN=$(gh auth token) pnpm version:packages— the changelog writer needs the token to link pull requests. Never run plainchangeset version.- Read every
packages/*/CHANGELOG.mdentry it wrote. A changeset shared by several packages lands word for word in each; rewrite an entry that describes another package (the CLI's entry must talk about the CLI). The entry for a package with no changes of its own is "Released with Spree , with no changes of its own." - Verify:
node scripts/publish-packages.mjs verify v<version>and, for each tool that moved,verify @spree/cli@<version>orverify create-spree-app@<version>.pnpm install --frozen-lockfile --offlinemust still pass; a version bump never changes the lockfile. - For a minor or major release, add the entry to
docs/changelog.mdx(the 6.0.0 release commit shows the shape) and make sure the upgrade guide underdocs/developer/upgrades/exists. Patch releases skip this. - Commit as
Released Spree <version>. The body says which tools moved and which stayed, and why. Amend the fixes from the reviews that run before the pull request opens into it; once it is open,/open-prpushes each round as its own commit and the pull request is squash-merged.
3. Write the release notes
Write tmp/release-notes-<version>.md in the repository (mkdir -p tmp
first; it is ignored by git and absent from a fresh checkout) in exactly this
shape. It becomes the GitHub release body, and the
dashboard's notifications panel renders that body in every merchant's admin, so
keep it plain GitHub markdown.
# Spree <version>
<Two or three sentences: what kind of release this is and the three or four things a merchant or developer will notice.>
```bash
npx spree upgrade
```
---
## ✨ New features
- **<Feature in a few words>.** <One or two sentences on what it does for the merchant or developer.> [#1234](https://github.com/spree/spree/pull/1234)
## 🧭 Admin dashboard improvements
- **<Improvement>.** <Sentence.> [#1234](https://github.com/spree/spree/pull/1234)
## 🐛 Bug fixes
- <What works now, as a plain sentence; no bold lead.> [#1234](https://github.com/spree/spree/pull/1234) by @handle
## ⬆️ Upgrading from <previous minor>
- <Fixes and steps for stores still coming from the previous minor.> [#1234](https://github.com/spree/spree/pull/1234)
## 🛠 Developer experience
- <Dependency changes, removed gems or packages, CLI and template changes, with what an app owner must do.> [#1234](https://github.com/spree/spree/pull/1234)
## 📚 Documentation
- <Guide rewrites and new pages.> [#1234](https://github.com/spree/spree/pull/1234) by @handle
---
## 📦 Package versions
| Package | Version |
| --- | --- |
| Spree gems | `<version>` |
| `@spree/sdk`, `@spree/admin-sdk`, `@spree/seller-sdk`, `@spree/core` | `<npm version>` |
| `@spree/dashboard`, `@spree/dashboard-core`, `@spree/dashboard-ui`, `@spree/seller-dashboard` | `<npm version>` |
| `@spree/cli` | `<version>` |
| `create-spree-app` | `<version>` (unchanged) |
**Full Changelog:** https://github.com/spree/spree/compare/v<previous>...v<version>
Rules:
- Keep only the sections that have entries, in this order. "Upgrading from" appears when a change fixes the upgrade path from the previous minor.
- One bullet per pull request, or one bullet for a group of pull requests that make one change (list every number). Every bullet links its pull request.
- Write for the reader of the section: merchants in features, dashboard and bug fixes; developers in upgrading, developer experience and documentation. Say what works now, not what was broken or how it was fixed. No class names, file paths or internal terms in the merchant sections.
- Credit every author other than the person cutting the release with
by @handleafter the link. - Breaking or action-needed items (a dependency major, a removed gem, a removed prop, a rake task to re-run) go in "Developer experience" or "Upgrading from" with the action spelled out.
- Internal work (test helpers, CI, repository tooling nobody installs) is left out.
- The npm spelling of a prerelease is
6.1.0-rc.1; the table shows it.
Show the notes to the user in the final report of this phase.
4. Open the pull request
Run /open-pr. The pull request description is the release summary (which
tools moved and that the tags and GitHub release follow the merge), a ---
line, then the notes from phase 3 verbatim. A release pull request is the
exception to the short-description rule: reviewers review the notes there, and
phase 5 reads them back from it. Only collaborators can edit a pull request
description, so never post the notes as a comment, which anyone can write.
Stop when /open-pr reports: the merge needs a human review.
5. Publish (after the merge)
Run from a checkout of main at the merge commit (git pull). Check
Spree::VERSION is the target, no v<version> tag exists yet, and every
workflow that ran on the merge commit succeeded: gh run list --commit <merge sha> --json name,conclusion. Tests must be among them: every release commit
changes Spree::VERSION under spree/, so a missing Tests run means CI never
covered the merge commit. Stop on a missing, failed or cancelled run.
Decide who publishes. A patch release (X.Y.Z, Z above zero, no
prerelease label) is published by this command: run the commands below in
order. A minor, major or prerelease is published by a human: print the
same commands and the notes, run none of them, and stop.
Recover the notes first, before anything is pushed, so a problem with them stops the release while nothing has happened yet. They are in the pull request description, from the
# Spree <version>heading to the end;<n>is the number in the merge commit subject:mkdir -p tmp gh pr view <n> --repo spree/spree --json body --jq .body | tr -d '\r' | sed -n '/^# Spree <version>$/,$p' > tmp/release-notes-<version>.mdThe
trmatters: a description edited on github.com comes back with CRLF line endings, and the heading match would otherwise find nothing. The file must start with the heading and end with the Full Changelog line; an empty or truncated file stops the release. Print it in full as a markdown block, so the user sees what is published and can paste it by hand.Tag the merge commit, with a tag for each tool that moved, and push at most three tags in one push (GitHub starts no workflow beyond that):
git tag v<version> <merge sha> git tag '@spree/cli@<version>' <merge sha> # only tools that moved git push origin v<version> '@spree/cli@<version>'The push starts one
release.ymlrun per tag. Find each run by its tag, not by its place in the recent list, and wait for every one of them:gh run list --workflow release.yml --branch v<version> --json databaseId,conclusion gh run watch <id>(
--branchtakes the tag name for tag pushes; repeat for each tool tag.) Every job skips versions already on its registry, so a failed run is re-run withgh run rerun <id> --failed, never with a new tag. Stop before the next step unless every tag's run concludedsuccess.Create the GitHub release:
gh release create v<version> --title v<version> --notes-file tmp/release-notes-<version>.md --latest--latestonly when this is the newest stable release; a patch for an older minor takes--latest=false. A prerelease takes--prereleaseand not--latest.Wait until the registries serve the exact version. A green release workflow means the upload finished, not that the version is installable: RubyGems' API, Bundler's compact index and npm's replicated metadata each lag the publish by anything from seconds to several minutes. Poll both (a prerelease publishes under npm's
betatag and RubyGems hides prereleases by default, so the checks name the version):until gem info spree_core --remote --prerelease -v <version> | grep -q "spree_core (<version>)"; do sleep 30; done until npm view @spree/sdk@<npm version> version >/dev/null 2>&1; do sleep 30; doneGive up and report after 30 minutes. Then
gh release view v<version>shows the release. Phases 6 and 7 start only after this step passes, and each still retries its own install, because the index a resolver reads can trail the API the checks above hit.
6. Bump spree-starter
New projects come from spree/spree-starter,
whose lockfile pins the Spree gems and whose db/migrate holds a copy of every
gem migration. Run this once the gems are on RubyGems (phase 5 step 4), from
the repository root of a worktree, whose Postgres the scratch database below
uses.
rm -rf tmp/spree-starter
git clone --quiet https://github.com/spree/spree-starter.git tmp/spree-starter
cd tmp/spree-starter
git switch -c chore/spree-<version with dots as dashes>
bundle update $(ls ../../spree/*.gemspec ../../spree/*/*.gemspec ../../spree/providers/*/*.gemspec | xargs -n1 basename | sed 's/\.gemspec$//')
grep -E "^ spree[a-z_]* \(" Gemfile.lock
DATABASE_NAME=spree_starter_release bin/rails db:create spree:install:migrations db:migrate
DATABASE_NAME=spree_starter_release bin/rails db:drop
bundle updateresolves from Bundler's compact index, which can trail the RubyGems API phase 5 polled by several minutes. A failure namingCould not find gem 'spree'or a version other than<version>in thegrepmeans the index has not caught up: wait a minute and run thebundle updateline again, up to ten times, before treating it as an error.bundle updateon the gems this repository releases (thespreemeta gem and the gemspecs underspree/*/andspree/providers/*/), never a barebundle updateand not everyspree*gem:spree_dev_toolshas its own version. The starter'sGemfilealready allows the new version (~> 6.0), so this moves the lockfile and the dependencies the gems require (6.0.2 moved Alba to 4) and nothing else. Thegrepmust then show<version>for every one of those gems; another version means the gems are not on RubyGems yet or theGemfileconstraint excludes them. Stop in that case. The Ruby in.ruby-versionmust be installed; the worktree's Rails runs on it.spree:install:migrationscopies the gem migrations the starter lacks intodb/migrate;db:migrateruns them on the scratch database sodb/schema.rbis regenerated. The starter'sconfig/database.ymlreadsDATABASE_NAME(andDATABASE_HOST,DATABASE_USERNAME,DATABASE_PORTwhen the worktree's Postgres is not the default local one) in development;DATABASE_URLapplies only in production. The scratch database is dropped afterwards.- The diff must touch only
Gemfile.lock,db/migrate/anddb/schema.rb. Anything else means a step ran against the wrong app; stop and look. - Commit as
Bump Spree to <version>, with the copied migrations named in the body, push, and open the pull request withgh pr create --repo spree/spree-starter --base main. Its description lists the new migrations and says what each one does. Its CI builds the Docker image and runs the specs; watch it withgh pr checks --watch --repo spree/spree-starter. A human merges it.
7. Bump the storefront's SDK
The Next.js storefront at spree/storefront
depends on @spree/sdk by caret range, so new installs already get the new
version; the lockfile and the range still move so the repository builds and
tests against it. Run once @spree/sdk@<npm version> is on npm (phase 5
step 4). Clone fresh rather than using a worktree's storefront/: that
clone's lockfile points at the worktree's own SDK build and must never be
committed.
rm -rf tmp/storefront
git clone --quiet https://github.com/spree/storefront.git tmp/storefront
cd tmp/storefront
git switch -c chore/sdk-<version with dots as dashes>
pnpm add @spree/sdk@^<npm version>
pnpm exec tsc --noEmit && pnpm run check && pnpm run test
pnpm addwith the caret spec rewrites the range inpackage.jsonand resolves the lockfile to the new version; nothing else moves. AnERR_PNPM_NO_MATCHING_VERSIONfor@spree/sdkmeans npm's metadata has not replicated to the mirror pnpm hit: wait a minute and run it again, up to ten times. After it succeeds, the lockfile must name@spree/sdk@<npm version>; an older version resolved means the range was satisfied by stale metadata, so runpnpm update @spree/sdkonce more. The diff must touch onlypackage.jsonandpnpm-lock.yaml. A type error here means the Store API changed shape in this release; stop and report it rather than patching the storefront inside the release.- Commit as
Updated @spree/sdk to ^<npm version>with a one-sentence body naming the Spree release, push, and open the pull request withgh pr create --repo spree/storefront --base main. Its CI runs lint, type check, unit tests and the Playwright suite against a Spree server; watch it withgh pr checks --watch --repo spree/storefront. A human merges it.
Final report
The pull request URL, the audit items the user accepted or deferred, the tool versions bumped or kept, the follow-ups the audit produced (regenerated docs, a changeset a commit forgot, an upgrade note) and, after the merge, the release URL (or the tag and release commands for a human), the registry checks and the spree-starter and storefront pull requests.