docs: gdd feature sections for MVP phases 4 and 7 (refs #532) (#534)

agamrafaeli-instinct6a88834e753c
diff --git a/docs/gdd/corridors.md b/docs/gdd/corridors.md
new file mode 100644
index 000000000..5f79adada
--- /dev/null
+++ b/docs/gdd/corridors.md
@@ -0,0 +1,46 @@
+# Corridors: the Tel Aviv-Haifa railway and roads
+
+## Player story
+
+As a player of the MVP, I want my pioneer units to lay the Tel Aviv-Haifa railway and the road corridors segment by segment over several turns, so that the new yishuvim are connected and the infrastructure objective's railway part can be completed (GDD "MVP scope" [S1]; plan Phase 4 [S2]).
+
+## Rules
+
+- A corridor is a project with per-segment progress, drawn by `RouteLayer` from the sim's progress, in a new `corridors.yaml` (the plan [S2]).
+- The MVP's decided corridors are the Tel Aviv-Haifa railway (GDD [S1]) and the Burma Road (G1 [S5]). Any further road is the owner's decision D-D7, open (the plan recommends two to three roads [S2]).
+- Corridor work is multi-turn, with one project per pioneer unit at a time (D-D6 [S2]). Segment counts, costs and durations are balance values the owner sets; until then they are placeholders in the dev and test overlay, never in `content/` [S2].
+- Completing the Tel Aviv-Haifa railway completes the railway part of the third objective, "Establish key infrastructure" (GDD "MVP scope" [S1]). The completion card's reference date is the owner's open decision D-B3 [S2]; one option is the Haifa-Tel Aviv passenger service that opened on 20 September 1949 [S3].
+- The Burma Road corridor to Jerusalem is the Burma Road part of the third objective: the owner decided on 14 October 2026 that it is in the MVP (G1 [S5], GDD "MVP scope" [S1]). Its completion card's reference date is the opening of the Road of Valour, which replaced the Burma Road track, on 7 December 1948 [S4].
+- One military camp and one Hakhshara exist at the start, and pioneers build further camps (D-D5 [S2]); building a camp is one of the GDD's pioneer actions (GDD "Pioneer work" [S1]).
+
+## Data touched
+
+- `corridors.yaml` (new): corridor and segment definitions with progress.
+- `Projects.cs` (new, Phase 1) and the project's save lines: corridor progress.
+- `Corridors.cs` (new) and `tools/routes_1948.py` (new): the Phase 4 corridor model and route data (the plan, Phase 4 Touches [S2]).
+- `RouteLayer` (Unity): draws corridor progress.
+- `sites.yaml` (new, Phase 1): corridor endpoints.
+
+## Done when
+
+- This file passes `uv run scripts/oss/gdd_lint.py`.
+- Every rule above names its source: a decided row of #375, the GDD, the plan, or a sourced historical date.
+
+## Out of scope
+
+- The corridor list itself beyond the Burma Road (D-D7), segment costs and durations, and road and rail effects on movement (D-G2).
+
+## Sources
+
+- [S1] The game design of record, docs/GDD.md
+- [S2] GDD v0.1 impact analysis and phased plan, sections 5 and 6, docs/superpowers/specs/2026-10-12-gdd-v0.1-impact-and-plan.md
+- [S3] Haboker, 14 September 1949: the Tel Aviv-Haifa line opens to passengers on the 20th of the month, "next Tuesday", https://www.nli.org.il/he/newspapers/hbkr/1949/09/14/01/article/70 (OCR), checked 2026-10-14; confirmed by Maariv, 22 September 1949, a report from the line's first days, https://www.nli.org.il/he/newspapers/mar/1949/09/22/01/article/21 (OCR), checked 2026-10-14
+- [S4] Hayom (Jerusalem), 8 December 1948: the Road of Valour was opened "yesterday", 7 December 1948, https://www.nli.org.il/he/newspapers/hayomjlm/1948/12/08/01/article/2 (OCR), checked 2026-10-14
+- [S5] Owner decisions, G1 (the Burma Road in the MVP, 14 October 2026), docs/oss/DECISIONS.md
+
+## Open questions
+
+- The corridor list: which roads join the railway and the Burma Road, if any (D-D7).
+- D-B3: the railway card's reference date. Option: the Haifa-Tel Aviv passenger service via Rosh HaAyin, 20 September 1949 [S3], in the MVP window; the coastal line opened in 1953, after it.
+- Segment counts, costs and durations: owner balance values.
+- Whether and how roads and rail affect movement (D-G2).
diff --git a/docs/gdd/ministers-events-end.md b/docs/gdd/ministers-events-end.md
new file mode 100644
index 000000000..a10c096c3
--- /dev/null
+++ b/docs/gdd/ministers-events-end.md
@@ -0,0 +1,44 @@
+# Ministers, events and the end of the MVP
+
+## Player story
+
+As a player of the MVP, I want the game to run its events and my chosen ministers through to an end screen on 1 January 1952 [S2], so that a full game resolves into a score and its historical completion cards (GDD "MVP scope" and "Historical events on objective completion" [S1]).
+
+## Rules
+
+- The MVP runs 44 turns (monthly), from 15 May 1948 to 1 January 1952 (D-B1 [S2]); the final turn's length is D-E5, open [S2]. The GDD text still says "approximately 48 turns" [S1]; the owner settled 44 turns [S2].
+- Objective cards and scoring belong to the first phase (PR #6, objectives-and-score.md; D-B2, D-B6 [S2]) and are not restated here. This section covers only what the final phase adds: every card complete, the end screen (D-H4, open), defeat handling (D-B5, open), the events (D-H1, D-H2, open) and the ministers (D-H3, open) [S2].
+- The war-survival objective completes on the last armistice event, the Syria-Israel agreement of 20 July 1949 (D-B2 [S2]; [S3]). The four signings were Egypt on 24 February 1949, Lebanon on 23 March 1949, Jordan on 3 April 1949 and Syria on 20 July 1949 [S3].
+- The existing cabinet and Attention stay (D-C5 [S2]). Minister roles, candidates and effects are D-H3, open [S2].
+
+## Data touched
+
+- `objectives.yaml` (new, Phase 1): completion rules and card references.
+- `events/`: the MVP's event set (#135 research).
+- `content/governments.yaml`, `offices.yaml`, `people.yaml`: minister candidates.
+- The end screen and score display (Unity).
+
+## Done when
+
+- This file passes `uv run scripts/oss/gdd_lint.py`.
+- Every rule above names its source: a decided row of #375, the GDD, the plan, or a sourced historical date.
+
+## Out of scope
+
+- Event frequency, windows and caps (D-H1), event effect targets (D-H2) and minister roles and effects (D-H3): all open.
+- The objectives panel UI and the score's presentation in Phase 1.
+- The exact completion conditions of each objective (GDD "MVP completion rules" [S1]): open.
+- Objective 1's bonus for capturing enemy soldiers lands at the prisoners' return (the plan, section 4.3 [S2]): Phase 5/6.
+
+## Sources
+
+- [S1] The game design of record, docs/GDD.md
+- [S2] GDD v0.1 impact analysis and phased plan, sections 5 and 6, docs/superpowers/specs/2026-10-12-gdd-v0.1-impact-and-plan.md
+- [S3] The 1949 armistice layer, content/map/armistice_hexes_1949.yaml (signing dates per agreement)
+
+## Open questions
+
+- Minister roles, candidates and effects (D-H3); event frequency and caps (D-H1); event effects on units, cities and projects (D-H2).
+- Bonus amounts, the timing formula's remaining parts, defeat conditions and whether all three objectives are required to finish (GDD "MVP completion rules" [S1]).
+- D-E5: the last turn. A 1 January 1952 end gives a 17-day final turn; the options are 15 January 1952 or a monthly grid on the 1st [S2].
+- The GDD's "approximately 48 turns" [S1] against the decided 44 turns [S2]: a one-line GDD fix for the owner.