docs(plan): GDD Phase 3 PR 0, a recommended answer for every open question (refs #383, #375) (#576)

Eyal Golanab4581442c60
diff --git a/docs/superpowers/plans/2026-10-15-gdd-phase-3.md b/docs/superpowers/plans/2026-10-15-gdd-phase-3.md
index a8ec69f58..19dd47572 100644
--- a/docs/superpowers/plans/2026-10-15-gdd-phase-3.md
+++ b/docs/superpowers/plans/2026-10-15-gdd-phase-3.md
@@ -2,13 +2,15 @@
> **For agentic workers:** REQUIRED SUB-SKILL: Use superpowers:executing-plans (one PR at a time, inline, as in Phases 1 and 2). Steps use checkbox (`- [ ]`) syntax for tracking. **The owner reviews this plan before any code.** Every PR below names the owner questions it waits on; a PR does not start until its questions are answered and the answers are recorded (PR 0).
+**Status (15 October 2026):** this plan merged as #573 and is the plan of record for Phase 3. The Phase 2 plan merged as #568. PR 0 below holds the recommended answers to every open question, for the owner to decide.
+
**Goal:** Take the one-city slice to the MVP's twelve Jewish cities and towns: census start values, the CBS arrivals spread over the cities, housing capacity and condition with overflow, city projects (housing, industry, one specialised industry) with a build time and a Money cost, the craftsman, and the "absorb immigrants" objective with its sourced milestone.
**Architecture:** Phase 1 built one city (`Cities.cs`, R-CITY-001 to R-CITY-005) and the resolver (`TurnResolver.cs`). Phase 2 turns the GDD loop on for the real game and moves the Phase 1 balance values into `content/` as labelled design values (#568, Q-CUT-1). Phase 3 fills `content/cities.yaml` with the twelve cities, makes arrivals land across them, adds housing condition and overflow to step 8 of the resolver, and adds city projects to step 5 (construction) beside the pioneer work of Phase 1 PR 5 (`Projects.cs`). It retires the legacy map actions (`MapActions.cs`) into projects, and adds an objective to the Phase 1 PR 6 objective machinery. After cutover every PR that changes an MVP rule moves the goldens, re-pins them in the same PR and says why (spec §3, "After cutover").
**Tech stack:** as Phases 1 and 2: C# netstandard2.1 sim (`sim/Statecraft.Sim`), xUnit on net10.0 (`sim/Statecraft.Sim.Tests`), YamlDotNet content, Unity 6000.3.25f1 UI Toolkit (`unity/`), Python tools and policy checks under `uv`.
-**Spec:** [the impact plan](../specs/2026-10-12-gdd-v0.1-impact-and-plan.md), §1.2 (the Housing row), §1.4, §2.2, §2.3, §4.4 and §6 "Phase 3"; its §5 group D rows and D-B4. Design of record: [docs/GDD.md](../../GDD.md), "Cities and construction" and objective 2. The format and the global constraints follow [the Phase 1 plan](2026-10-12-gdd-phase-1.md) and the Phase 2 plan (PR #568, `docs/superpowers/plans/2026-10-14-gdd-phase-2.md`, in review). Issue: #383 (part of #374); owner decisions: #375.
+**Spec:** [the impact plan](../specs/2026-10-12-gdd-v0.1-impact-and-plan.md), §1.2 (the Housing row), §1.4, §2.2, §2.3, §4.4 and §6 "Phase 3"; its §5 group D rows and D-B4. Design of record: [docs/GDD.md](../../GDD.md), "Cities and construction" and objective 2. The format and the global constraints follow [the Phase 1 plan](2026-10-12-gdd-phase-1.md) and [the Phase 2 plan](2026-10-14-gdd-phase-2.md) (#568). Issue: #383 (part of #374); owner decisions: #375.
## What is built, and what this phase waits for (read before a task)
@@ -41,7 +43,8 @@ Owner decisions already made (impact plan §5; #375; [DECISIONS](../../oss/DECIS
Phase 2 answers on #568 (owner, 15 October 2026), which this phase builds on:
- **Q-CUT-1, "Labelled design values":** the Phase 1 balance numbers move into `content/`, each tagged as a design value rather than a historical one, and a test lists them all. Phase 3 follows the same rule for every new balance value: it goes into `content/` labelled as a design value, and the listing test grows.
-- **The recommendations taken** ("Take the recommendations"), among them: Q-NAT-1, Social cohesion is a 0 to 1 indicator through the effects web, replacing `morale` on screen, with thresholds as situations; Q-POOL-1 and Q-POOL-3, national Food and Arms pools, with `food_supply` derived from the stock; Q-MONEY-1, debt and foreign currency kept internal under Money; Q-MONEY-4, the Treasury is called Money. Questions without a recommendation (Q-MONEY-2 income and upkeep, Q-MONEY-3 borrowing among them) went back to the owner; this plan cites their answers where it needs them and does not assume them.
+- **The recommendations taken** ("Take the recommendations"), among them: Q-NAT-1, Social cohesion is a 0 to 1 indicator through the effects web, replacing `morale` on screen, with thresholds as situations; Q-POOL-1 and Q-POOL-3, national Food and Arms pools, with `food_supply` derived from the stock; Q-MONEY-1, debt and foreign currency kept internal under Money; Q-MONEY-4, the Treasury is called Money. Questions without a recommendation (Q-MONEY-2 income and upkeep, and Q-MONEY-3 borrowing, answered since) went back to the owner; this plan cites their answers where it needs them and does not assume them.
+- **Q-MONEY-3, "Allow borrowing"** (owner, 15 October 2026, relayed by the coordinator): a GDD cost above the Treasury is borrowed, as map actions do today, rather than refused. Phase 3's city projects follow it (Q-PROJ-1).
- **Q-EFX-2, "Extend it":** the no-gain rule for sensitive options covers all five resources.
The city start values (#569, owner decision of 15 October 2026, "Census values + defaults"): "The 8 Nov 1948 census counts become labelled start values. All residents are counted, Tel Aviv-Yafo is one city, the Wikipedia figures for Zikhron and Rosh Pinna are accepted, labelled design values fill the gaps where no source exists, and Rishon is 10,433 (CBS SA14)." So:
@@ -55,7 +58,7 @@ The city start values (#569, owner decision of 15 October 2026, "Census values +
## Global constraints
- The GDD wins over every older spec (AGENTS.md). Anything the GDD marks Open, Proposal or TBD is built only as the owner's answer. **No PR in this plan decides an open D-row.** Where this plan states a recommendation, it is the impact plan's, quoted; the owner decides.
-- **Still open, and needed by this phase** (#375 "Open for later phases", "Phases 3 and 4" row, and #383's banner): D-D1, D-D2, D-D3, D-D4, D-D8 and D-B4 (the immigrants part; the yishuvim part is Phase 4). D-C6 (costs and income) for the values. Q-MONEY-2 and Q-MONEY-3 from Phase 2 if they are still open.
+- **Still open, and needed by this phase** (#375 "Open for later phases", "Phases 3 and 4" row, and #383's banner): D-D1, D-D2, D-D3, D-D4, D-D8 and D-B4 (the immigrants part; the yishuvim part is Phase 4). D-C6 (costs and income) for the values. Q-MONEY-2 from Phase 2 if it is still open.
- Balance values are labelled design values in `content/` (Q-CUT-1), never invented: each is the owner's number, or the method the owner picked in Q-START-1, with a comment saying it is a design value and which question set it. Sourced facts go in `content/` with `sources:` and a `checked:` date (CONTENT_POLICY §2.1); a value marked `wikipedia-only` keeps that status. Dates show as "15 May 1948".
- **A human checks every census figure against the scans before it becomes content** (#569, "AI assistance": "A human should check each figure against the scans before any value becomes content"). PR 1 does not merge before that check is recorded.
- Determinism (docs/determinism.md): one RNG, no trigonometry, no unordered iteration into state, invariant culture. **No PR in this phase adds an RNG draw.** Counts are integers; spreading arrivals over cities uses integer apportionment with an ordinal tie-break, cumulative from the game's start, so no unit is lost or doubled (as R-CITY-003 does today).
@@ -139,6 +142,57 @@ Docs only, like #456 for Phase 1.
- [ ] **Step 2.** In this plan, replace each PR's "Waits for the owner" banner with a "Decided by the owner" banner quoting the answers, as the Phase 1 plan's PR 3 and PR 4 banners do, and rewrite the PR's tasks to the answers. A PR whose questions are still open keeps its banner and does not start.
- [ ] **Step 3.** Checks: `md_links.py`, `check_repo.py`. No CHANGELOG line (docs only). Refs #375, #383.
+### Recommended answers for the owner (15 October 2026)
+
+**These are recommendations, not decisions.** Each row gives one recommended answer and its reason, based on the GDD, the impact plan, a history source, #569's data or the code on `main`. Where none of those supports a choice, the row lists the options and says **owner pick**. The rule throughout is the least surprising, smallest change. When the owner answers, Steps 1 and 2 above record the answer. A design value stays labelled as one (Q-CUT-1).
+
+The answers recorded so far that these recommendations rely on: "Labelled design values" (Q-CUT-1, #568), "Census values + defaults" (#569) and "Allow borrowing" (Q-MONEY-3). All three were given on 15 October 2026.
+
+Figures used below:
+- The arrival series' first period runs from 15 May to 31 December 1948 (231 days) and holds 101,828 people (`content/aliyah.yaml`). The sim spreads each period evenly by day (`PopulationSystem.Arrivals`), so about 78,000 of those people (177 days) arrive before the census day, 8 November 1948. That is about 78 units against the twelve cities' 511 (510 by nearest rounding, plus 1 for Rosh Pinna under Q-START-2's recommended minimum).
+- Jobs at the national working share of 43.9% (CBS SA 2, Table 9) give these employed units in the seven towns that have no city share: Petah Tikva 10, Rishon LeZion 5, Zikhron Ya'akov 1, Rosh Pinna 0, Rehovot 5, Hadera 5 and Netanya 5.
+
+| Question | D-row | Recommended answer | Reason |
+|---|---|---|---|
+| Q-START-1 design values for the gaps | D-D1, D-C6 | Jobs in the seven towns: the national working share, 43.9% (CBS SA 2, Table 9). Job slots: equal to the start employed count. Housing capacity: equal to the start population. All three are labelled design values. | The 43.9% share and the near-zero unemployment (0.6%) are sourced, and Abrams (1951) records a housing shortage. So "full jobs, full houses" is the smallest assumption, and every arrival then needs housing and industry projects, which is the absorption game. |
+| Q-START-2 people into units; Rosh Pinna rounds to 0 | D-A1 | Round to the nearest unit with a minimum of 1 for any city that has people, so Rosh Pinna starts with 1 unit. Keep 1,000 people per unit. | A smaller unit rescales every Phase 1 value and the cumulative arrival count (R-CITY-003 forbids changing it by era). A minimum of 1 touches one city and is labelled. |
+| Q-START-3 start housing condition | D-D2 | One labelled design value for all twelve cities. **The number is the owner's pick.** | No per-city source exists (#569: "Housing, 0 of 12"), so a per-city spread would be invented. |
+| Q-START-4 the six kibbutzim and moshavim | none | Not cities in Phase 3. | They have no census row (#569), every value would be a design value, and the GDD's cities are the `city` and `town` rows. |
+| Q-START-5 all residents as civilians, and training | D-A2 | No new rule. Training stays open to every civilian, and the PR notes the effect. | The non-Jewish residents in the census rows are a few units at most. A rule by group would need a source and a sensitivity review. |
+| Q-ARRV-1 how arrivals are spread | none | In proportion to each city's census population, by cumulative largest-remainder apportionment with an ordinal tie-break. The CBS end-of-year city series is printed in the PR, not tested. | It is the smallest change from one `arrivals_city`, and it follows the sourced city sizes. A player-directed split adds 12 decisions a month. No tolerance for the city series has a basis. |
+| Q-ARRV-2 the national head count and the cities | none | Keep `GameState.Population` as the one record of the nation's people, checked by `CalibrationTests`. The cities are the part of it placed in towns, and an invariant test checks that the cities' people (units times `people_per_unit`) never exceed the national head count. Replace `BeforeCutoverArrivalsAreInTheLegacyHeadCountToo` with that test. | The anchors stay untouched (#383's first done-when), and the twelve cities (509,417 people) were never the whole population (716,700 Jews on the census day). |
+| Q-ARRV-3 the May to November 1948 double count | none (follows from #569) | **A correctness fix, recommended: (a).** The cities take arrivals only from the census day. The rules key `mvp.city_arrivals_from: 1948-11-08` cites CBS SA 14, Table 11. R-CITY-003 counts `P(t)` from that date for the cities, while `PopulationSystem` still adds every arrival to the national head count from 15 May 1948. See the test-first note below. | The census counts already contain the people who arrived from May to November, so adding them again double-counts about 78 units. (a) is one sourced date. (b), subtracting each city's May to November arrivals, needs per-city arrival figures that no source gives. |
+| Q-HOUSE-1 overflow; people per capacity point | D-D1 | The impact plan's recommendation: no hard cap. Every refugee becomes a civilian on the next housing step. The people above capacity are the city's overflow, and overflow lowers condition and cohesion. One capacity point houses one population unit. **How much overflow lowers condition and cohesion is the owner's pick.** | This is spec §5's own answer. A unit per point keeps Phase 1's arithmetic (R-CITY-004 already compares capacity with civilians). |
+| Q-HOUSE-2 condition per city; scale; effects | D-D2 | Per city (average), from 0 to 1. It feeds Social cohesion and the national `housing` level only, and housing projects raise it. | This is spec §5's recommendation. A 0 to 1 scale matches the national parameters (Q-NAT-1), and spec §1.2 makes `housing` the cities' aggregate. |
+| Q-HOUSE-3 housing types; transit camp; policy gate | D-D3 | Two types. **Permanent housing** adds capacity and condition from the game's start. The **transit camp** is cheap and adds capacity but lowers condition. It keeps the `maabarot` policy gate, which already places it in 1950, and drops the code's separate 1 January 1950 window. | This is the impact plan's recommendation. CBS SA 2, Building Table 2, records rooms completed in 1948, so housing from the start is sourced. The policy gate is today's code and carries the sourced May 1950 date (`rules.yaml:10-11`). |
+| Q-HOUSE-4 assigning residents to housing | none | Automatic, as R-CITY-004 does today. | This is the smallest change, and it costs the player no extra decisions in twelve cities. |
+| Q-HOUSE-5 who takes housing | D-D1 | People in training and recruits keep counting against their city's housing. Halutz units (movable, D-A2) do not. | Today their places look free while they still live there (#468, question 2). Counting them avoids people vanishing from housing. |
+| Q-PROJ-1 costs, build times, payment | D-C6, D-A3 | Paid in full at the start, as pioneer work is (#566), and borrowed if the Treasury is short (Q-MONEY-3, "Allow borrowing"). **Owner pick:** the Money and turns for each kind. A starting point would be the current map-action costs as labelled design values (transit camp IL 1.5m, housing IL 6m, `rules.yaml`); industry and every build time have no basis. | One payment rule for every GDD cost. The numbers are balance. |
+| Q-PROJ-2 the permitted building site | none | Keep today's map-action rule: a land hex within `map_action_max_distance` (1) of the city's settlement hex that holds no other placement. | `MapActions.Check` and `PlacementLayer` already validate and draw it, so nothing new is needed. |
+| Q-PROJ-3 do projects need workers | none | No. City projects cost Money and turns only in Phase 3. | The GDD's city-project table names a site, costs and a build time, not workers. Builders on the map are the pioneers (Phase 4). |
+| Q-PROJ-4 projects at once | none | Keep today's national limit of 2 starts a turn (`map_actions_per_turn`), with no per-city limit. | It is today's rule, now applied to projects. |
+| Q-PROJ-5 Attention cost | D-A6, D-C5 | `start_project` costs 1 and `cancel_project` costs 0.5, as labelled design values. | 1 is today's `map_action` cost and 0.5 is the Phase 1 cancel cost (`cancel_training`). D-C5 says starting a project costs Attention. |
+| Q-CRAFT-1 how a craftsman is acquired | D-D4 | The impact plan's recommendation: training (`Train(city, craftsman)`, R-TRAIN-001's path) in a city with a completed industry project. | This is spec §5's answer, and it reuses the training code. |
+| Q-CRAFT-2 extra income; slots | D-D4, D-C6 | A craftsman fills an ordinary job slot and earns a multiple of the job income. **The multiple is the owner's pick.** | The GDD says only "Generates more money". A separate slot type would be a new rule with no basis. |
+| Q-CRAFT-3 training turns, cost, facility | D-D4, D-A3 | The facility is an industry project. **Owner pick:** the turns and the cost. | The facility follows from Q-CRAFT-1. The values are balance. |
+| Q-JOBS-1 a default that fills jobs | none | Yes. In each housing step, in ascending city id, the free job slots fill from civilians without a job, at no Attention cost. An `AssignWorkers` order fixes that city's number and turns its default off. | This is the impact plan's mitigation ("defaults that auto-fill jobs"). The reference player already does the same (`min(jobs, civilians)`). |
+| Q-SPEC-1 which industry and city | D-D8 | The winery, in Rishon LeZion, subject to Task 6.0 finding a dated 1948 to 1951 source for the town's vineyards. | This is spec §5's example. English Wikipedia, "Carmel Winery" (checked 2026-10-15), says its first winery is in Rishon LeZion and its first vineyards were planted near the town in the 1880s. The same article's Zikhron Ya'akov vineyards are undated. |
+| Q-SPEC-2 what it adds | D-D8, D-C6 | Job slots, like industry but more of them, and no Food. **Owner pick:** the number. | It is the smallest variant of the industry project. Wine is not in the national Food pool. |
+| Q-ABS-1 the milestone and its date | D-B4 | **Owner pick:** (A) the population passes 1,000,000 (20 December 1949, JTA); (B) the first ma'abara (May 1950, no exact day; the Kesalon sensitivity); (C) the end of Magic Carpet (24 September 1950). | Each has a sourced date, and none is both dated to the day and about housing and work (`research_notes/GDD objectives/objective-cards.md`, §2). |
+| Q-ABS-2 the completion condition | D-B4 | The impact plan's recommendation, measured over all city residents: no refugees waiting, overflow at or below a share, and employed civilians at or above a share. **Owner pick:** the two shares. | The sim stops tracking arrivals once they are housed, so a resident-wide measure is the one it can compute without new state. |
+| Q-ABS-3 the card's photograph | event-image ruling | It follows Q-ABS-1. With (B), use the Rothenberg CC BY 4.0 ma'abara photograph, with alt text that does not name Kesalon. With (A) or (C), show no photograph unless the owner approves a generic arrival one. | Only (B) has a usable photograph found so far (objective-cards research). |
+| Q-UI-1 kit density by condition | none | Leave it out of Phase 3. | The impact plan calls it optional. The panel shows condition as a number. |
+| Q-UI-2 Hebrew words | none | **Owner pick.** Candidates: בעל מלאכה (craftsman), מצב הדיור (housing condition), מיזם דיור (housing project), תעשייה (industry), יקב (winery). | The GDD gives no Hebrew for these words. |
+| Q-SENS-1 abandoned Arab housing | D-F1 | No Phase 3 text names it. The panel and the absorb card describe housing in general terms. Any later text about it goes through D-F1 review, as the deport cards do. | No Phase 3 rule depends on it, and spec §4.1 item 4 already forbids the mechanic. |
+
+**Test-first note for Q-ARRV-3 (in PR 2).**
+- Write `ArrivalsTests.TheCitiesHoldTheirCensusCountsOnTheCensusDay` first. It plays a run with no orders. In the state of the last turn that starts before 8 November 1948 (15 October 1948), the twelve cities' people (civilians, refugees and those in training, in units) equal the census start total, 511 units under Q-START-2's recommendation, exactly.
+- The next turn (to 15 November 1948) may add only `floor(P(15 Nov) / ppu) - floor(P(8 Nov) / ppu)` units across the cities, with P counted from the census day.
+- It **fails today**, because R-CITY-003 counts arrivals from the era's start (15 May 1948). That would add about 67 units by 15 October (153 days of the first period), and about 78 by 8 November.
+- `CalibrationTests` must still pass unchanged, because the national head count still takes every arrival from 15 May. The mutation check: count the cities from 15 May again, and the new test fails.
+
+**#461's arrivals double count.** Under Q-ARRV-2's recommendation the double count goes away. The national head count is the one record of the people, and the cities are a placed part of it, checked by the invariant test in PR 2. So no person is counted twice. What remains is the Money side: the Treasury takes both the per-head tax on all people and the job income of the employed. That is Q-MONEY-2 (Phase 2 PR 2), still open with the owner, and it is not in Phase 3's scope. If the owner picks Phase 2's option (a), "keep the per-head tax until Phase 3 builds all cities", the switch belongs right after Phase 3 PR 2 and needs the FRUS calibration re-run (Phase 2 plan, Task 1.2).
+
---
## PR 1: the twelve cities' start values
@@ -264,7 +318,7 @@ Sources: CBS Statistical Abstract of Israel No. 14 (1963), Table 11, pp. 30-31,
## PR 4: city projects (housing and industry)
-> **Waits for the owner:** Q-PROJ-1 to Q-PROJ-5, Q-HOUSE-3 (D-D3, D-C6); Q-MONEY-3 (Phase 2, borrowing) if still open. **Waits for:** PR 3; Phase 1 PR 5 (#566, `Projects.cs`); Phase 2 PR 2.
+> **Waits for the owner:** Q-PROJ-1 to Q-PROJ-5, Q-HOUSE-3 (D-D3, D-C6). Q-MONEY-3 is answered ("Allow borrowing"). **Waits for:** PR 3; Phase 1 PR 5 (#566, `Projects.cs`); Phase 2 PR 2.
**Goal:** the GDD's city projects: the player starts a housing project (capacity, condition or both, by housing type) or an industry project (job slots) in a city; it takes several turns (D-A3) and costs Money; completed projects add their capacity, condition or slots once and draw on the map. The legacy map actions (`transit_camp`, `housing`) are refused in the GDD loop and their kinds become housing types (spec §1.4: "Placements become completed projects").
@@ -272,7 +326,7 @@ Issue (Task form): "GDD Phase 3: city projects (housing, industry) and the end o
**Files:** new `content/projects.yaml` (kinds: each housing type, industry; what each adds, cost, turns, `from`/`to` window: design values, except a sourced start date such as the transit camp's); `Content.cs`, `ContentLoader.cs`; `GddState.cs` (`CityProject { Id, Kind, City, TurnsLeft, Workers? }`, immutable); `GameState.cs` (`CityProjects`, hashed as `cproj[...]` only when not empty); `Projects.cs` (city projects beside pioneer work, step 5); `Commands.cs` (`StartProject(kind, city)` and `CancelProject(id)`), `AttentionSystem.cs`, `Simulation.cs`, `SaveGame.cs` (`project KIND CITY`, `unproject ID`), `Scenario.cs`, `CommandGuardTests.Samples`; `MapActions.cs` (refused under `IsGdd`); `ReferencePlayer.cs` (a stated policy, D-A7: for example, start one housing project in the city with the most people waiting, when Money and Attention allow); tests `CityProjectsTests.cs`, `ProjectsContentTests.cs`, `MapActionsTests.cs`; `docs/rules/mvp.md`; `docs/gdd/city-projects.md`.
-**Rule IDs (proposed):** **R-PROJ-001** `StartProject(kind, city)` and its refusals (unknown kind or city, outside its window, short Money per Q-MONEY-3's rule, the per-city limit of Q-PROJ-4, the legacy loop); **R-PROJ-002** `CancelProject` returns any committed people and no Money (D-A3); **R-PROJ-003** each turn in step 5, in ascending id, a project's turns fall by 1, and at 0 it adds its capacity, condition or slots once, on the turn's end date; **R-PROJ-004** in the GDD loop a map action is refused with a reason, its Attention refunded.
+**Rule IDs (proposed):** **R-PROJ-001** `StartProject(kind, city)` and its refusals (unknown kind or city, outside its window, the limit of Q-PROJ-4, the legacy loop; a short Treasury is borrowed, not refused, Q-MONEY-3); **R-PROJ-002** `CancelProject` returns any committed people and no Money (D-A3); **R-PROJ-003** each turn in step 5, in ascending id, a project's turns fall by 1, and at 0 it adds its capacity, condition or slots once, on the turn's end date; **R-PROJ-004** in the GDD loop a map action is refused with a reason, its Attention refunded.
**Test-first steps:**
- [ ] `CityProjectsTests.AHousingProjectAddsCapacityOnceWhenDone` (R-PROJ-003, Review focus 5): fails to compile (no command).
@@ -290,7 +344,7 @@ Issue (Task form): "GDD Phase 3: city projects (housing, industry) and the end o
### Owner questions for PR 4
- **Q-HOUSE-3. Housing types, and the transit camp (D-D3).** Recommendation (impact plan): "Keep the transit camp as a cheap, low-condition type from its sourced date (`rules.yaml:10-11`)". The sourced date in `rules.yaml` is the first ma'abara, Kesalon, May 1950 (the code's window opens 1 January 1950, `map_actions_from`). Which types exist (for example transit camp and permanent housing), what each adds to capacity and condition, and does the transit camp still need the `maabarot` policy (`MapActions.cs` checks it today)?
-- **Q-PROJ-1. Costs, build times and payment (D-C6, D-A3).** Money and turns per project kind (design values). Paid in full at the start (as Phase 1 PR 5 does for pioneer work) or per turn? Borrowing follows Q-MONEY-3's answer for every GDD cost.
+- **Q-PROJ-1. Costs, build times and payment (D-C6, D-A3).** Money and turns per project kind (design values). Paid in full at the start (as Phase 1 PR 5 does for pioneer work) or per turn? Borrowing follows Q-MONEY-3's answer for every GDD cost ("Allow borrowing", 15 October 2026).
- **Q-PROJ-2. "A permitted building site" (GDD, City projects table; no D-row).** The impact plan says "The command becomes 'start project' with a build time and a site". Is the site the city itself (no hex chosen), a hex within one hex of the city (today's map-action rule, `map_action_max_distance`), or designated city sites in `sites.yaml` (Phase 4's file)?
- **Q-PROJ-3. Do city projects need workers? (impact plan §2.3: `StartProject` "Commits Money and workers"; no D-row).** If yes: civilians without a job, halutzim (Phase 1 units; D-D6 gives one project per pioneer unit), or a count the project holds until done?
- **Q-PROJ-4. Projects at once (no D-row; D-D6 is for pioneer units).** A limit per city, per turn (the map actions allow 2 a turn, `map_actions_per_turn`), or none beyond Money and Attention?
@@ -432,7 +486,7 @@ The winery needs a city whose vineyards (or "areas for grapes") in 1948 to 1951
| Q-HOUSE-3 housing types; the transit camp; the policy gate | D-D3 | 4 | keep the transit camp as a cheap, low-condition type from its sourced date |
| Q-HOUSE-4 assigning residents to housing | none (GDD open; spec §1.4) | 3 | none |
| Q-HOUSE-5 who takes housing (trainees, recruits) | D-D1; #468 question 2 | 3 | none |
-| Q-PROJ-1 costs, build times, payment | D-C6, D-A3 (decided: multi-turn) | 4 | owner (balance); borrowing per Q-MONEY-3 |
+| Q-PROJ-1 costs, build times, payment | D-C6, D-A3 (decided: multi-turn) | 4 | owner (balance); borrowing allowed (Q-MONEY-3, answered) |
| Q-PROJ-2 the permitted building site | none (GDD requirement) | 4 | none |
| Q-PROJ-3 do projects need workers | none (spec §2.3 command table) | 4 | none (spec §2.3 says "Commits Money and workers") |
| Q-PROJ-4 projects at once | none | 4 | none |