A Civilization-style strategy game about governing Israel from 15 May 1948. Real ministers, real map, every fact sourced. Unity + deterministic C# sim.
Record the owner-approved 60 to 90 minute session target (#1254)
Aviel Cohene62183fb49bb
diff --git a/docs/GDD.md b/docs/GDD.mdindex 98a152bdf..c290e6605 100644--- a/docs/GDD.md+++ b/docs/GDD.md@@ -214,6 +214,7 @@ Designated building sites and transport corridors bound the locations and routesThe MVP years, monthly turns and three objectives are fixed above. These remain to decide:- the map extent, starting unit counts, event count and the session's target play time (asked of Amir, [#856](https://github.com/eyalgolan/statecraft-israel/pull/856#issuecomment-6231565826)); the span is 15 May 1948 to 15 January 1952, as above;+ **Then decided (owner, 18 Oct 2026, "60-90 minutes"; [#813](https://github.com/eyalgolan/statecraft-israel/issues/813#issuecomment-6249771314)):** a full session targets 60 to 90 minutes, about 2 minutes a turn.- when the war-survival objective is complete, which immigrants must have housing and employment, and which new yishuvim are required.Each objective needs a specific historical event and reference date for the completion card. For ongoing processes such as immigrant absorption, choose a defined milestone with a sourced date. Bonus amounts, the timing formula, defeat conditions and whether all objectives are required to finish the MVP remain open.@@ -244,3 +245,4 @@ Reference files from the repository snapshot reviewed on 12 October 2026:**Then decided (owner, 18 Oct 2026, "Part of objective 3"; [#1006](https://github.com/eyalgolan/statecraft-israel/issues/1006#issuecomment-6254333583)):** the Negev water line that began at Nir Am must stay in Israeli hands until the armistice with Egypt on 24 February 1949; its card gives the sourced 1947–48 pipeline history, with `checked:` dates and a person's fact check, and its points are a labelled design value for the balance pass.**Then decided (owner, 18 Oct 2026, "Bonus inside the war"; [#1007](https://github.com/eyalgolan/statecraft-israel/issues/1007#issuecomment-6254333758)):** objective 1 gives a bonus when a player unit reaches the Umm Rashrash hex before the war ends; it does not change when the war objective completes. The card is the Ink Flag, 10 March 1949 (Operation Uvda), sourced with `checked:` dates and a person's fact check; points are a labelled design value for the balance pass.3. **Session span** (Q-DOC-1, [#784](https://github.com/eyalgolan/statecraft-israel/issues/784#issuecomment-6232838937)): the MVP is 44 monthly turns, 15 May 1948 to 15 January 1952. The session's target play time is open, asked of Amir ([#856](https://github.com/eyalgolan/statecraft-israel/pull/856#issuecomment-6231565826)).+ **Then decided (owner, 18 Oct 2026, "60-90 minutes"; [#813](https://github.com/eyalgolan/statecraft-israel/issues/813#issuecomment-6249771314)):** a full session targets 60 to 90 minutes, about 2 minutes a turn.diff --git a/docs/superpowers/plans/2026-10-15-gdd-phase-7.md b/docs/superpowers/plans/2026-10-15-gdd-phase-7.mdindex cfa78d556..ded5b67d6 100644--- a/docs/superpowers/plans/2026-10-15-gdd-phase-7.md+++ b/docs/superpowers/plans/2026-10-15-gdd-phase-7.md@@ -479,6 +479,8 @@ The recommended answers are in the last section of this plan.## PR 12: the balance pass> **Decided by the owner (17 October 2026, [#784](https://github.com/eyalgolan/statecraft-israel/issues/784#issuecomment-6232838937)):** Q-BAL-1 and Q-BAL-2, as recommended. **Waits for:** PRs 1 to 7.+>+> **Then decided (owner, 18 Oct 2026, "60-90 minutes"; [#813](https://github.com/eyalgolan/statecraft-israel/issues/813#issuecomment-6249771314)):** a full session targets 60 to 90 minutes, about 2 minutes a turn.**Goal:** the impact plan's "Balance passes" and "Invariant bands for the MVP from the GDD's objectives", with the risk it names: "Balance with no historical calibration for the new quantities. The balance values must be labelled as assumptions." The PR proposes no number on its own authority: it reports what the reference and scenario runs do with the current design values, and the owner sets or accepts each change in review.