StreamVault is a TV-first free IPTV player for Android TV built with Kotlin, Jetpack Compose, Room, Hilt, and Media3.
Kotlin iptv-player
docs(live): record extraction acceptance status
David Nashasha94c0a042f1a
diff --git a/docs/COMPOSE_REDUCTION_PHASE5_LIVE_REPORT.md b/docs/COMPOSE_REDUCTION_PHASE5_LIVE_REPORT.mdnew file mode 100644index 00000000..2a9542b2--- /dev/null+++ b/docs/COMPOSE_REDUCTION_PHASE5_LIVE_REPORT.md@@ -0,0 +1,95 @@+# Compose Reduction Phase 5: Live report++Date: 2026-08-29+Slice: `:feature:live` (Phase 5 order 4 of 6)+Rollback point: `ea349d83dceb8baa45ef1a18b7a45fa295a264f5`++## Outcome++Home Live TV, categories, channel preview, EPG/Guide presentation, state, and+dialogs now compile under `:feature:live`. The app remains the composition root+for route registration, platform/scaffold adapters, typed player request+mapping, and Playback MultiView composition. The slice is not a Phase 5+completion claim: locale parity, exact golden review, exhaustive fixture-driven+journeys, performance/profile evidence, and neighboring slice gates remain+open.++## Ownership and boundaries++Live-owned production includes Home and Guide screens, ViewModels/state,+preview pane and lifecycle calls, category/channel/EPG hosts, dialogs, remote+shortcut policy, default resources, unit tests, and connected presentation+tests. `:app` owns `LiveGraph`, route compatibility, `AppLivePlaybackRequestMapper`,+the Home/EPG scaffold and platform adapters, and the Playback MultiView planner+adapter. Preview handoff remains delegated to the existing Playback singleton.++The feature boundary verifier passes with only the approved project+dependencies: `:core:navigation`, `:core:ui`, `:domain`, `:data`, and `:player`.+No app or feature-to-feature implementation imports remain. The two temporary+`:data` imports (`PreferencesRepository` and `ProviderSyncStateSource`) remain+documented for the Phase 7 domain-contract migration.++## Delivered checkpoints++The implementation was built incrementally from the rollback point through the+following Live checkpoints (plus the final lint fix):++- `bd4f2649`, `96e9c9b9`: move Home and EPG presentation units;+- `108ca79f`, `aeb7cea7`, `6766c528`, `d27fff05`, `597f9706`, `e2422a6b`:+ Home composition ports, adapters, and remote dispatch;+- `abc05272`, `6d2d6d9d`, `ccf06258`, `c8957551`, `62124ade`, `844a1f19`,+ `a71ec037`, `979cf11c`, `b715d026`, `57b9389c`, `218d6b4a`, `95d40b96`,+ `e7864086`, `19b95766`: extracted Home/EPG policies, focus, grid, and+ presentation seams;+- `ffcf710b`, `23c26d64`, `8a3e8cd1`, `354d2842`, `28971f89`, `7de15c6a`:+ preview/route/graph/request contracts and connected presentation coverage;+- `0cf3927c`: Compose lint-safe resource lookups and Crossfade state usage.++## Verification++- `:feature:live:verifyFeatureLiveBoundary`: passed.+- `:feature:live:connectedDebugAndroidTest`: passed, 7 tests, 0 failures,+ 0 errors, 0 skipped. XML is under+ `feature/live/build/outputs/androidTest-results/connected/debug/`.+- Focused feature/app structural bundle (unit tests, lint, Android-test+ compilation, app compilation/tests, and debug assembly): passed after the+ lint fix. Gradle reported 235 actionable tasks, 23 executed, 212 up-to-date.+- Graphify refreshed at 15,797 nodes, 30,791 edges, 436 communities. The+ legacy app Home/EPG source directories and imports are absent.+- The existing app Live route golden remains open: exact pixel drift at `(0,0)`+ from RGB `(6,16,26)` to `(7,17,27)`. The baseline was not rewritten.++## Runtime acceptance++Using `E:\androidSdk\platform-tools\adb.exe` on `emulator-5554`+(`Television_1080p`, API 36, `AOSP_TV_on_x86`), both channels were opened from+Live TV preview into full playback and captured for approximately two minutes:++| Channel | Frames / cadence | Unique hashes | Media session | Logs |+| --- | --- | ---: | --- | --- |+| `01 00s Replay` | 61 / ~2 s / ~120 s | 61 | `PLAYING`, `error=null` | HLS prepare + `first-frame-success`; no fatal/stuck/MPEG-TS markers |+| `02 3ABN Dare To Dream Network` | 61 / ~2 s / ~124 s | 61 | `PLAYING`, `error=null` | HLS prepare + `first-frame-success`; no fatal/stuck/MPEG-TS markers; two non-fatal video-stall/reprepare warnings |++Full PNG, hash, media-session, and logcat evidence is in+`validation/phase5_live/task10-live-playback/`. The connected and route smoke+record is `validation/phase5_live/task10-connected-validation.md`.++## Open gates++- Full Home/EPG ViewModel-driven manual journey matrix (search, filters,+ hidden/locked/favorite/reorder/PIN, reminders/recording conflicts, archive,+ RTL/reduced-motion, focus restoration, and MultiView edge cases) remains+ fixture-dependent and open.+- Locale-by-locale resource parity is open. The feature has 245 default keys;+ translated app locales remain in the app until values and placeholders are+ compared. No app resources were deleted.+- Golden baseline review, five-pair post-extraction performance isolation,+ clean/warm guardrails, and baseline/startup profile regeneration are open.+ `verifyBaselineProfileSources` passes (46,249 baseline / 30,093 startup+ rules), but `:app:generateBaselineProfile` hit a JVM native-memory OOM during+ release Java compilation; generated files still contain stale app Home/EPG+ descriptors and were not hand-edited. Details are in+ `validation/phase5_live/profile-validation.md`.+- Playback, Provider, and Settings acceptance/performance gates remain governed+ by their existing reports. Catalog and System were not started. Phase 5 is+ not complete.diff --git a/docs/COMPOSE_REDUCTION_PHASE5_ROADMAP.md b/docs/COMPOSE_REDUCTION_PHASE5_ROADMAP.mdindex fd110e88..c3dd6364 100644--- a/docs/COMPOSE_REDUCTION_PHASE5_ROADMAP.md+++ b/docs/COMPOSE_REDUCTION_PHASE5_ROADMAP.md@@ -86,11 +86,16 @@ out of :app without behavior or stability regressions.docs/superpowers/plans/2026-08-27-settings-feature-extraction.md- Settings execution report:docs/COMPOSE_REDUCTION_PHASE5_SETTINGS_REPORT.md+- Live extraction implementation plan:+ docs/superpowers/plans/2026-08-28-live-feature-extraction.md+- Live execution report:+ docs/COMPOSE_REDUCTION_PHASE5_LIVE_REPORT.md- Transitional dependency ledger:docs/COMPOSE_REDUCTION_PHASE5_TRANSITIONAL_DEPENDENCIES.md-The settings implementation plan and execution report now document the-structural extraction, resource ownership cleanup, dependency audit, and open-runtime gates. Live and catalog still receive separate implementation plans-only after the current provider/runtime gates confirm the reusable module-pattern; no later slice is started by the settings work.+The settings implementation plan and execution report document the structural+extraction, resource ownership cleanup, dependency audit, and open runtime+gates. The Live implementation plan and report now document the Home/EPG+extraction, connected checks, and two-channel runtime evidence while leaving+locale, golden, performance/profile, and exhaustive journey gates explicit.+Catalog and System remain unstarted.