Skip to content

Open-source platform for 3D AI agents. Turn text or a photo into a rigged, animated GLB avatar, give it an LLM brain, memory and a wallet, and embed it anywhere with one web component. Remote MCP server, x402 payments, Three.js, browser-native.

3.1 KB
Raw Blame

Audit 10: event-day readiness runbook (run last, after fixes have shipped)

Everything is fixed and deployed; now make the platform boringly reliable for the traffic spike and give the owner a one-page live-ops position. This prompt both executes the pre-scaling and produces the runbook.

Project aerial-vehicle-466722-p5, region us-central1. Pre-approved scaling and quota posture: docs/ops/gcp-credits-plan.md. Full production runbook: docs/ops/gcp-production.md. Config-only gcloud run services update changes are pre-approved; use --update-env-vars only, never --set-env-vars.

Execute now (day before)

  1. Deploy state. Confirm the intended final build is live: curl -s https://three.ws/api/version matches the release SHA. If a deploy is still pending, run the deploy-preflight agent and stage everything so shipping is one command; the deploy itself stays owner-gated.
  2. Pre-scale. Raise min-instances on three-ws-api (and the /play world server if it is a separate service; check gcloud run services list) so the first traffic wave never hits a cold start. Confirm max-instances and concurrency leave headroom per the credits plan. Config-only, pre-approved: do it, record old/new values.
  3. Worktree hygiene. npm run clean:worktrees (then --apply) so a mid-event hotfix deploy cannot die on a full disk.
  4. Rehearse rollback. Identify the current and previous Cloud Run revisions and write down the exact one-line traffic-rollback command for each service. Verify the previous revision still exists and is routable.
  5. Monitoring loop. Set up the recurring production check for event day (the gcp-triage sweep or npm run logs:errors + npm run smoke:prod on an interval). Confirm alerting actually reaches a human.
  6. Capacity smoke. Drive a burst of concurrent sessions at /play (Playwright contexts or a load tool) at least 2x the expected peak. Watch p95 latency, error rate, and instance count. Fix or pre-scale whatever bends.
  7. Third-party dependencies. List every external dependency in the event path (Solana RPC, Pump.fun feed, IPFS gateway for coin images, LLM providers) and verify each has a working failover rung today. Test the failover, not just its existence.

Produce: the one-page live-ops sheet

Write docs/event-readiness/LIVE-OPS.md containing, with zero fluff:

  • The event URL (canonical $THREE /play link from docs/event-readiness/README.md) and the release SHA that is live.
  • Health: the 3 curl commands that prove the site is up.
  • Logs: the 2 log commands for fast triage.
  • Rollback: the exact per-service revision-rollback command, pre-filled.
  • Scale: current min/max instances and the command to raise them further.
  • Known failure modes from audits 1-9 that were accepted rather than fixed, and what to do if each one fires.
  • Escalation: which subsystem maps to which triage tool (x402-economy-triage, gcp-triage, scripts/play-mobile-repro.mjs).

Report format

Old/new scaling values, capacity smoke numbers, rollback rehearsal result, and the link to LIVE-OPS.md. Anything owner-gated (the final deploy) stated as the single remaining command.