LLM-Driven Extraction of Unstructured Data — Built for API Deployments & ETL Pipeline Workflows
Python ai-agentsdata-engineeringdocument-aigenerative-aiidpjson-extractionllmmcp-serverocrpdf-extractionprompt-engineeringstructured-output
"""Load ``tests/critical_paths.yaml`` and compute gaps + regressions."""
from __future__ import annotations
import json
import logging
from collections.abc import Collection
from dataclasses import dataclass, field
from pathlib import Path
from typing import Any, Literal
import yaml
from tests.rig.groups import REPO_ROOT, GroupManifest
log = logging.getLogger(__name__)
CriticalPathState = Literal["covered", "gap", "regression"]
DEFAULT_REGISTRY = REPO_ROOT / "tests" / "critical_paths.yaml"
class BaselineCorruptError(RuntimeError):
"""Raised when the baseline file exists but cannot be parsed.
The rig refuses to silently treat a corrupt baseline as empty because that
would (a) demote real regressions to gaps and (b) wipe the other tier's
coverage on the next merge. The CI workflow should delete the cache and
retry, surfacing the corruption explicitly.
"""
@dataclass(frozen=True)
class CriticalPath:
id: str
description: str
covered_by: tuple[str, ...]
# "group": covered when any covered_by group runs green (coarse — survives
# the covering test being deleted). "marker": additionally requires ≥1
# passing test marked @pytest.mark.critical_path("<id>") in this run.
# Ratchet each path to "marker" as its tests get marked.
proof: Literal["group", "marker"] = "group"
@dataclass(frozen=True)
class CriticalPathRegistry:
paths: tuple[CriticalPath, ...]
_by_id: dict[str, CriticalPath] = field(default_factory=dict, init=False, repr=False)
def __post_init__(self) -> None:
# Duplicate ids would silently last-wins in the lookup while both rows
# still render — fail loudly at load time instead.
seen: set[str] = set()
dupes = sorted({p.id for p in self.paths if p.id in seen or seen.add(p.id)})
if dupes:
raise ValueError(f"duplicate critical-path ids: {dupes}")
# `frozen=True` blocks direct assignment; route through object.__setattr__.
object.__setattr__(self, "_by_id", {p.id: p for p in self.paths})
def by_id(self, path_id: str) -> CriticalPath:
if path_id not in self._by_id:
raise KeyError(path_id)
return self._by_id[path_id]
@dataclass(frozen=True)
class CriticalPathStatus:
path: CriticalPath
state: CriticalPathState
covering_groups_run: tuple[str, ...]
notes: str = ""
# True when a declared covering group is in this run's scope (or scoping is
# off). An out-of-scope gap (coverage only in an unrun tier, or none
# declared) must not gate under --fail-on-critical-gap. Defaults False so a
# regression that forgets to pass it can only under-gate (spurious warning),
# never over-gate (spurious build block).
in_scope: bool = False
def __post_init__(self) -> None:
# Make the contradictory states unrepresentable rather than relying on
# evaluate()'s discipline: covered ⇒ at least one covering group ran;
# gap/regression ⇒ none did.
if self.state == "covered" and not self.covering_groups_run:
raise ValueError("state='covered' requires a non-empty covering_groups_run")
if self.state in ("gap", "regression") and self.covering_groups_run:
raise ValueError(f"state={self.state!r} must have empty covering_groups_run")
def load_critical_paths(path: Path | None = None) -> CriticalPathRegistry:
raw = yaml.safe_load((path or DEFAULT_REGISTRY).read_text())
if not isinstance(raw, dict) or "paths" not in raw:
raise ValueError(f"{path or DEFAULT_REGISTRY}: expected top-level `paths:` list")
paths = []
for p in raw["paths"]:
proof = str(p.get("proof", "group"))
if proof not in ("group", "marker"):
raise ValueError(
f"critical path {p.get('id')!r}: proof must be 'group' or "
f"'marker', got {proof!r}"
)
paths.append(
CriticalPath(
id=str(p["id"]),
description=str(p.get("description", "")),
covered_by=tuple(p.get("covered_by") or ()),
proof=proof,
)
)
return CriticalPathRegistry(paths=tuple(paths))
def validate_registry_against_manifest(
registry: CriticalPathRegistry, manifest: GroupManifest
) -> list[str]:
"""Return human-readable errors for unknown groups referenced in ``covered_by``."""
errors: list[str] = []
known = set(manifest.names())
for path in registry.paths:
for g in path.covered_by:
if g not in known:
errors.append(
f"critical path {path.id!r}: "
f"covered_by references unknown group {g!r}"
)
if path.proof == "marker" and not path.covered_by:
errors.append(
f"critical path {path.id!r}: proof 'marker' requires a "
f"non-empty covered_by (marked tests must live in a group)"
)
return errors
def evaluate(
registry: CriticalPathRegistry,
*,
groups_run_green: Collection[str],
baseline: dict[str, Any] | None,
scope_groups: Collection[str] | None = None,
marker_proven: Collection[str] = (),
) -> list[CriticalPathStatus]:
"""Compute the status for each critical path against this build's results.
Args:
registry: parsed critical-paths registry.
groups_run_green: names of groups that ran AND passed in this build.
Pass only ``status == "pass"`` groups — a group that collected
zero tests ("empty") must not attest coverage.
baseline: parsed previous-summary.json from the main-branch cache, or None.
Expected shape: ``{"covered_paths": ["auth-login", ...]}``.
scope_groups: the groups this invocation actually runs (dep-expanded).
When a critical path's ``covered_by`` is fully outside
``scope_groups``, the path is classified as ``gap`` rather than
``regression`` — running only the unit tier shouldn't flag
e2e-tier paths as regressed. If ``None``, no scoping is applied
(back-compat).
marker_proven: path ids with at least one passing
``@pytest.mark.critical_path`` test in this build. Paths with
``proof: marker`` require membership here on top of a green
covering group.
Returns:
Statuses in the original registry order.
"""
previously_covered: set[str] = set((baseline or {}).get("covered_paths") or [])
# Convert to sets internally so per-path membership checks stay O(1) even
# when callers pass lists/tuples; the public signature accepts Collection
# to leave that choice to them.
green = set(groups_run_green)
proven = set(marker_proven)
scope = None if scope_groups is None else set(scope_groups)
return [
_status_for(path, green, proven, previously_covered, scope)
for path in registry.paths
]
def _status_for(
path: CriticalPath,
green: set[str],
proven: set[str],
previously_covered: set[str],
scope: set[str] | None,
) -> CriticalPathStatus:
covering = tuple(g for g in path.covered_by if g in green)
if path.proof == "marker" and path.id not in proven:
covering = ()
in_scope = scope is None or any(g in scope for g in path.covered_by)
if covering:
state: CriticalPathState = "covered"
note = ""
elif path.id in previously_covered and in_scope:
state = "regression"
note = "Was covered on the cached baseline; not covered in this build."
else:
state = "gap"
note = _gap_note(path, green, in_scope)
return CriticalPathStatus(
path=path,
state=state,
covering_groups_run=covering,
notes=note,
in_scope=in_scope,
)
def _gap_note(path: CriticalPath, green: set[str], in_scope: bool) -> str:
if not in_scope:
return "Out of scope for this invocation."
if path.proof == "marker" and any(g in green for g in path.covered_by):
return (
"Covering group ran green but no passing "
"@pytest.mark.critical_path test attested this path."
)
return "No group covering this path ran green in this build."
def merge_into_baseline(statuses: list[CriticalPathStatus], destination: Path) -> None:
"""Merge this build's green critical paths into the cached baseline.
Two tiers run in separate processes (unit, then integration; then e2e in a
separate workflow). Each invocation only knows about the paths covered by
*its* groups. A naive overwrite would erase the other tier's coverage, so
we union with whatever's already on disk.
A corrupt baseline raises :class:`BaselineCorruptError` rather than being
treated as empty: silently dropping previously-covered paths would erase
the other tier's contribution and turn the next build into a regression
festival. CI should delete the cache and retry on this exception.
Ids absent from the registry are pruned. The union alone never forgets, so a
deliberately retired path would otherwise sit in the cache forever; pruning
makes editing ``critical_paths.yaml`` the way to accept a removal.
"""
existing: set[str] = set()
if destination.exists():
try:
existing = set(_read_baseline(destination)["covered_paths"])
except (OSError, ValueError) as exc:
raise BaselineCorruptError(
f"refusing to merge into corrupt baseline {destination}: {exc}. "
"Delete the cache entry and re-run."
) from exc
fresh = {s.path.id for s in statuses if s.state == "covered"}
known = {s.path.id for s in statuses}
payload = {"covered_paths": sorted((existing | fresh) & known)}
destination.parent.mkdir(parents=True, exist_ok=True)
destination.write_text(json.dumps(payload, indent=2))
def _read_baseline(source: Path) -> dict[str, Any]:
"""Parse a baseline file and check its shape.
Well-formed JSON of the wrong shape is as unusable as a truncated file, and
would otherwise surface as an ``AttributeError``/``TypeError`` from whichever
caller touched it first. Raises ``OSError`` or ``ValueError``
(``JSONDecodeError`` is one) for callers to translate.
"""
parsed = json.loads(source.read_text())
if not isinstance(parsed, dict):
raise ValueError(f"expected a JSON object, got {type(parsed).__name__}")
covered = parsed.get("covered_paths") or []
if not isinstance(covered, list) or not all(isinstance(p, str) for p in covered):
raise ValueError("'covered_paths' must be a list of strings")
return {**parsed, "covered_paths": covered}
def load_baseline(source: Path) -> dict[str, Any] | None:
"""Load the cached baseline.
Returns None if the file doesn't exist (first build / fresh cache).
Raises :class:`BaselineCorruptError` if the file exists but is unreadable,
unparseable, or misshapen — see :func:`merge_into_baseline` for the rationale.
"""
if not source.exists():
return None
try:
return _read_baseline(source)
except (OSError, ValueError) as exc:
raise BaselineCorruptError(
f"baseline at {source} is unreadable: {exc}. "
"Delete the cache entry and re-run."
) from exc