An agentic skills framework & software development methodology that works.
Commits on main
E37: pre-flight plan review — surface plan conflicts as one batched question before Task 1
b61b550 Jesse Vincent committed 5 months ago
Spec: L2b tested — opus structural win, sonnet transmission+attention gap (E35/E36); bump evals to 9919b27
be40020 Jesse Vincent committed 5 months ago
L2b: plan-mandated defects are findings the human adjudicates
530476f Jesse Vincent committed 5 months ago
E27 stack: conditional impl tier + final-review tier pin + narration recipe + terse reviewer contract
e97faaf Jesse Vincent committed 5 months ago
E03: cheapest-tier implementers when plan carries complete code (transcription hypothesis)
cfe48c2 Jesse Vincent committed 5 months ago
Strict-cost spec: L2 final — died at gates; explicit escalation holds at sonnet, implicit adjudication does not
8bcefb1 Jesse Vincent committed 5 months ago
writing-plans: task right-sizing, Global Constraints header, per-task Interfaces blocks
8e1262a Jesse Vincent committed 5 months ago
Constraints block is the reviewer's attention lens: copy spec verbatim, never improvise process rules
de4672b Jesse Vincent committed 5 months ago
Strict-cost spec: L1 final — cost win re-attributed to complete-code plans; guidance owns fidelity/variance
25192df Jesse Vincent committed 5 months ago
Strict-cost spec: L2 recon n=2 (sonnet controller $6.68/$8.05, judgment clean, escalation points unstressed)
f5e8df4 Jesse Vincent committed 5 months ago
Strict-cost spec: record batch A-E rung verdicts (L1 validated, L2 recon positive, L3 dead)
b5b3b5d Jesse Vincent committed 5 months ago
Spec: strict-cost SDD experiment ladder — judgment as co-invariant, plan-side crispness first
30bbeef Jesse Vincent committed 5 months ago
Record writing-plans micro-test result: resolved, no change needed
d3dd1ec Jesse Vincent committed 5 months ago
Spec: record iterations 4-5 (variance honesty, structural fixes, final validated ranges)
b2872a4 Jesse Vincent committed 5 months ago
Adopt audited positive phrasings: evidence rule leads positive; fix-report completeness as checklist
e9b88d0 Jesse Vincent committed 5 months ago
Land eval-tuned combo: file handoffs, progress ledger, final-review package, REQUIRED model lines, reviewer risk budget
4298eac Jesse Vincent committed 5 months ago
Spec: positive-instruction redesign — audit results, micro-test method, writing-plans variants
69a0035 Jesse Vincent committed 5 months ago
Describe the review design as current state, not as a delta
68c9ddb Jesse Vincent committed 5 months ago
Spec: record iterations 2-3 results and final frozen-config matrix
aa80399 Jesse Vincent committed 5 months ago
Reviewer skepticism covers the implementer's design rationales
3280a32 Jesse Vincent committed 5 months ago
Make diff-pasting non-optional for task reviewer dispatch
84d033e Jesse Vincent committed 5 months ago
Spec: document cost iterations and the per-task review consolidation
097ed59 Jesse Vincent committed 5 months ago
Merge per-task reviews into one task reviewer (iteration 2)
e08ad06 Jesse Vincent committed 5 months ago